Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD07-02123
StatusFinaled
Name PETRA INC
Site Address 930 N CLOVERDALE RD
Project NameIDAHO KOREAN PRESBYTERIAN CHUR
Customer Number 
ePlanReviewNo
Description
(Idaho Korean Presbyterian Church - Addition) PLAN MODIFICATION 11/10/08 - TO DELETE THE 200 SQ. FT. WARMING KITCHEN INDICATED ON ORIGINAL APPROVED PLANS AS ROOM 114 AND USE THE 200 SQ. FOOT AREA AS A STORAGE ROOM PER RESUBMITTAL SHEET A3.1. DELETES DETAILS 2 & 3/A-3.1. drs. To add approxamately 5,530 square feet of additional floor area to an existing 1,840 square feet, A-3, assembly building. Work included in this permit is to add three new educational class rooms, a 3,600 square feet sanctuary with fixed seating, construction of two new accessible restrooms, and a 200 square feet warming kitchen. NOTE: A two hour fire barrier will be used to separate the A-3 fire areas and maintain a occupant load below three hundred. All construction shall be per the approved plans and attached comment list. MJP CUP07-0008
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/29/20091/29/20092/9/2009 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD1/2/20091/2/20091/29/2009 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 12/11/20081/2/2009 DONE
BLD-Final12/10/200812/11/200812/11/2008APASS
DetailsMike Jordan
ben Phone #: ###-####. ok for perm occ.
Permanent Occupancy  12/11/2008 DONE
DetailsAlexandra L. DeYoung
CHANGE STATUS TO (ISS)  11/21/2008 DONE
(F) Reprint permit  11/21/2008 DONE
OVERRIDE  11/18/2008  
OVERRIDE  11/18/2008  
OVERRIDE  11/18/2008  
Plan assigned to (DRS)11/13/200811/13/200811/18/2008 PASS
DetailsDan Stuart
11/18/2008 12:05:28 DRS - activity updated through activity BLDA022 from case BLD07-02123.
Routing - PLAN CHECK11/13/2008 11/18/2008 PASS
DetailsDan Stuart
Plan modification indicated in body of original permit. Routing plans to PW for sewer fee review.
Override - Parcel Holds  11/18/2008  
Print Pending Permit.LaserJet4  11/18/2008  
Routing - PUBLIC WORKS11/18/2008 11/18/2008 PASS
DetailsLouise Waldorf
Routing - PLAN CHECK11/18/2008 11/18/2008 PASS
DetailsDan Stuart
Plan Mod approved - Modified Plans to permit desk to issue
PLANS/APPL TAKEN TO FRONT DESK  11/18/2008 PASS
Telephone call  11/18/2008 DONE
Details
t/c w amber at ###-#### - plan modification ready - fees given
Permit Ready to Issue  11/18/2008 DONE
Details
Plan Modification Accepted  11/13/2008 DONE
Plan Modification excepted for BLD07-02123 Korean Presbyterian Church for the change on sheet A3.1 to change kitchen to a storage room routed to Dan S.
Case Summary (BLD)  11/10/2008  
Plan Modification Accepted  11/10/2008  
To delete kitchen and change to a storage room
BLD-Conference10/28/200810/29/200810/29/2008PDONE
DetailsMike Jordan
ben Note: appt for conference set at 3:00 pm!!! Phone #: ###-####
Temporary Occupancy UNPAID FEE  10/15/2008 DONE
DetailsBarbara Stitt
BLD-Final10/13/200810/14/200810/14/2008APART
DetailsMike Jordan
ben Phone #: ###-####. Temp occ. was granted. noted that ada requirements for assembly seating and kitchenet have not been installed or the ssistive listening devices.
Zoning Approval10/13/200810/13/200810/13/2008 DONE
DetailsDavid Moser
Code Occupancy Approval  10/10/2008 FAIL
Failed to comply with condition #7 of CUP07-00008. Condition #7 requires landscape buffer of mixed groundcover and evergreens and deciduos shrubs be provided between the south fence and new southern edge of pavement. Recycled asphalt is ok
Called Ben Pearson (###-####) at 15:00 (10-10-08) and expained the requirement of CUP07-00008 condition of approval # 7. He will install two evergreens and two shrubs along the south property line.
FIRE-Final Inspection10/8/200810/10/200810/9/2008APASS
DetailsTroy Cobbley
Corrections made per last inspection. KR
FIRE-Final Inspection10/7/200810/8/200810/8/2008AFAIL
DetailsTroy Cobbley
fire life safety failed. Crash bars not installed per approved plans. KR.
BLD-Wall cover7/28/20087/29/20087/29/2008APASS
DetailsMike Jordan
Ben Phone #: ###-####. Verified all fire stop on thru and membrane penetrations on 2hr. fire barrier wall.
BLD-Other7/22/20087/22/20087/22/2008PPART
DetailsMike Jordan
ben - drywall taping Phone #: ###-####. 2hr. fire barrier wall, final layer, west side. Still need to verify firecaulking on west side.
BLD-Other7/17/20087/18/20087/18/2008APART
DetailsMike Jordan
ben Note:fire wall please call 1/2 hr prior to inspection Phone #: ###-####. 2hr. wall, 2nd layer east side, 1st layer west side.
BLD-Other7/16/20087/16/20087/16/2008PPART
DetailsMike Jordan
ben Note: fire wall Phone #: ###-####. 1st. layer of 2hr. wall, east side only.
BLD-Energy code compliance7/14/20087/15/20087/16/2008APASS
DetailsMike Jordan
ben - exterior insulation Phone #: ###-####
BLD-Framing/Rough-in7/14/20087/14/20087/16/2008PPASS
DetailsMike Jordan
ben Phone #: ###-####. All issues resolved.
BLD-Framing/Rough-in7/10/20087/10/20087/10/2008PPART
DetailsDave Hannah
Ben Phone #: ###-#### ok to insulate still need to see truss engineering strape overcut and under lapped splices in top plates finish rocking 2hr wall and fire cualk pins and flase around fire dampers
BLD-Framing/Rough-in7/9/20087/9/20087/9/2008PNR
DetailsMike Jordan
ben Phone #: ###-####.Needs mech ri insp.
BLD-Wall cover6/5/20086/5/20086/5/2008PPART
DetailsMike Jordan
Ben Phone #: ###-####. 2nd layer of 2hr. wall at attic only.
BLD-Wall cover6/2/20086/2/20086/2/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/2/2008 at 8:32:50 AM. Contact: ###-####. 1st layer of 2hr firewall at attic area only.
BLD-Other5/28/20085/28/20085/28/2008PPART
DetailsMike Jordan
ben note: fire wall Phone #: ###-####
FIRE-Final Inspection5/28/20085/28/20085/28/2008PCANC
DetailsTroy Cobbley
ben Note: fire wall Phone #: ###-####
BLD-Other5/9/20085/12/20085/12/2008APART
DetailsMike Jordan
Ben, exterior wall sheathing; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Exterior shear nail only.
BLD-Other5/7/20085/8/20085/8/2008PPART
DetailsMike Jordan
ben - exterior sheeting shear Phone #: ###-####. Shear nail for roof diaphragm.
Plan resubmittals received  4/8/2008 DONE
Plan Modifications recieved.
Routing - FIRE4/8/2008 4/8/2008 PASS
DetailsScott Arellano
Plan modification approved by Mark Senteno.
BLD-Other4/7/20084/7/20084/7/2008PNR
DetailsMike Jordan
ben - prep for slab on grade Phone #: ###-####. wire mesh not yet in place, comnc. will hacve special insp, messh will be verified by special insp.
BLD-Footing1/28/20081/29/20081/29/2008APART
DetailsMike Jordan
ben - rebar Phone #: ###-####. wip. Perimeter stemwalls ok. Installing reinforcement at attachement to existing bldg. ok for conc. pend. approval of special insp. conc. placement cancelled for today.
BLD-Footing1/24/20081/25/20081/25/2008ACANC
DetailsJim Sly
ben Phone #: ###-####
Special insp required........OK pending Geotech special inspections, tests, and approvals.
Issue PAID IN FULL permit  12/27/2007 DONE
Telephone call  11/14/2007 DONE
t/c w amber at ###-#### - permit ready and fees given
Permit Ready to Issue  11/14/2007 DONE
Routing Off Site - STRUCTURAL11/9/2007 11/13/2007 PASS
received response letter & structural calcs (7) pages & "1" sheet of S-101-for AHJ---called action courier for pickup
PLANS/APPL TAKEN TO FRONT DESK  11/13/2007 DONE
Print Occupancy Form  11/13/2007 DONE
Plan assigned to (R_H)10/5/2007 11/13/2007 PASS
11/13/2007 13:45:14 RMH - activity updated through activity BLDA022 from case BLD07-02123.
Routing - PLAN CHECK10/9/2007 11/13/2007 PASS
Plan resubmittals received  11/7/2007  
received 1 transmittal,1 response,2 structural calcs,and 3 copies of sheet S-101 taken to Ron H.
Routing Off Site - STRUCTURAL10/22/2007 10/30/2007 FAIL
Called Action Courier for pick up 10/22/07 @ 8:31am BAS
10/30/07 - Review from outside engineer requires resubmittals.
Routing - PUBLIC WORKS10/9/2007 10/9/2007 PASS
Routing PW Solid Waste10/9/2007 10/9/2007 PASS
Routing - Erosion and Sediment10/9/2007 10/9/2007 PASS
ESC plan approved with attached conditions.
Plan assigned to (M_P)8/16/20078/16/200710/5/2007 DONE
Plans have been assigned to Ron Hill.
Plan Reviewer's activity  10/5/2007  
Plans have been assigned to Ron Hill.
Routing - PLAN CHECK9/21/2007 10/5/2007  
Plans have been assigned to Ron Hill.
Plan resubmittals received  10/3/2007  
received 1 transmittal,1 wall & interior partitions 1 memo,1 response,3 review comments,3 structural calcs,3 copys of sheets SL-1.1,A-1.1,A-2.1,A-3.1,A-4.1,A-7.1,P0.2,M1.0,P0.3,P1.0,P1.1 AND 9 COPYS OF SHEET S-101 taken to Mike P.
Routing - Erosion and Sediment9/20/2007 9/21/2007 FAIL
The RP listed on the application is not certified by Boise City. Returned to Plan Review.
Routing - PUBLIC WORKS9/6/2007 9/20/2007 FAIL
Routing PW Drainage9/6/2007 9/20/2007 PASS
Routing PW Solid Waste9/20/2007 9/20/2007 FAIL
Permanent trash enclosure and dumpster are not shown on the plans.
Routing - PLAN CHECK9/5/2007 9/6/2007  
Routing to P.W.
Plan resubmittals received  9/6/2007  
Received transmittal, one Geotechnical Report, and two copies of site plan and drainage plan; inserted into plans
1st review completed  9/5/2007 FAIL
Routing - FIRE8/31/2007 9/5/2007 PASS
Attached IFC review comments to plans.
Routing - PLANNING8/27/2007 9/3/2007 PASS
Diane P.
Routing - PLAN CHECK8/27/2007 8/31/2007 PASS
Plan review completed, sent correction report to the architect. Additional informaiton is required to be submitted and reviewed prior to issuing permit.
Routing Off Site - STRUCTURAL8/16/2007 8/31/2007 FAIL
Called Action Couriers for pick up
Routing - PLUMBING8/22/2007 8/27/2007 PASS
Routing - Erosion and Sediment8/21/2007 8/22/2007 FAIL
Contractor has been identified but rp listed on application is not certified.
Routing - PUBLIC WORKS8/16/2007 8/21/2007 FAIL
Routing PW Street Lights8/20/2007 8/21/2007 PASS
Routing PW Sewer Rating8/16/2007 8/21/2007 PASS
Routing PW Environmental8/21/2007 8/21/2007 PASS
1000 gallon grease interceptor size is ok for small kitchen operation.
Routing PW Solid Waste8/21/2007 8/21/2007 FAIL
Enclosure for dumpsters must be shown with dimensions. Minimum inside dimensions are 11' wide by 8' deep, with doors opening at least 120 degrees. Show location of existing dumpsters.

Contact: Peter McCullough, Public Works, ###-####
Routing PW Sewer Design8/16/2007 8/20/2007 PASS
Routing PW Drainage8/16/2007 8/17/2007 FAIL
DetailsBrian Murphy
failed O&M, SWALE ON PRPERTYLINE , Perc tests.
Pending Assignment by MYS8/14/2007 8/16/2007 DONE
8/16/2007 08:31:53 LEG - activity updated through activity BLDA170 from case BLD07-02123.
Plans ACCEPTED BY PLAN TECH  8/16/2007  
Plan routing begun/NEW & ADDTN  8/16/2007  
Routing - PLANNING Land Div8/16/2007 8/16/2007 PASS
existing building, previous permits OK daa/jej
Application received  8/14/2007  
PubWorks Occupancy Approval10/15/200810/15/2008