Third Notice BLD | 1/29/2009 | 1/29/2009 | 2/9/2009 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 1/2/2009 | 1/2/2009 | 1/29/2009 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 12/11/2008 | 1/2/2009 | | DONE |
|
|
|
|
BLD-Final | 12/10/2008 | 12/11/2008 | 12/11/2008 | A | PASS |
Mike Jordan
|
|
|
ben Phone #: ###-####. ok for perm occ.
|
Permanent Occupancy | | | 12/11/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/21/2008 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/21/2008 | | DONE |
|
|
|
|
OVERRIDE | | | 11/18/2008 | | |
|
|
|
|
OVERRIDE | | | 11/18/2008 | | |
|
|
|
|
OVERRIDE | | | 11/18/2008 | | |
|
|
|
|
Plan assigned to (DRS) | 11/13/2008 | 11/13/2008 | 11/18/2008 | | PASS |
Dan Stuart
|
|
|
11/18/2008 12:05:28 DRS - activity updated through activity BLDA022 from case BLD07-02123.
|
Routing - PLAN CHECK | 11/13/2008 | | 11/18/2008 | | PASS |
Dan Stuart
|
|
|
Plan modification indicated in body of original permit. Routing plans to PW for sewer fee review.
|
Override - Parcel Holds | | | 11/18/2008 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/18/2008 | | |
|
|
|
|
Routing - PUBLIC WORKS | 11/18/2008 | | 11/18/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PLAN CHECK | 11/18/2008 | | 11/18/2008 | | PASS |
Dan Stuart
|
|
|
Plan Mod approved - Modified Plans to permit desk to issue
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/18/2008 | | PASS |
|
|
|
|
Telephone call | | | 11/18/2008 | | DONE |
|
|
|
t/c w amber at ###-#### - plan modification ready - fees given
|
Permit Ready to Issue | | | 11/18/2008 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 11/13/2008 | | DONE |
|
|
|
Plan Modification excepted for BLD07-02123 Korean Presbyterian Church for the change on sheet A3.1 to change kitchen to a storage room routed to Dan S.
|
Case Summary (BLD) | | | 11/10/2008 | | |
|
|
|
|
Plan Modification Accepted | | | 11/10/2008 | | |
|
|
|
To delete kitchen and change to a storage room
|
BLD-Conference | 10/28/2008 | 10/29/2008 | 10/29/2008 | P | DONE |
Mike Jordan
|
|
|
ben Note: appt for conference set at 3:00 pm!!! Phone #: ###-####
|
Temporary Occupancy UNPAID FEE | | | 10/15/2008 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 10/13/2008 | 10/14/2008 | 10/14/2008 | A | PART |
Mike Jordan
|
|
|
ben Phone #: ###-####. Temp occ. was granted. noted that ada requirements for assembly seating and kitchenet have not been installed or the ssistive listening devices.
|
Zoning Approval | 10/13/2008 | 10/13/2008 | 10/13/2008 | | DONE |
David Moser
|
|
|
|
Code Occupancy Approval | | | 10/10/2008 | | FAIL |
|
|
|
Failed to comply with condition #7 of CUP07-00008. Condition #7 requires landscape buffer of mixed groundcover and evergreens and deciduos shrubs be provided between the south fence and new southern edge of pavement. Recycled asphalt is ok
Called Ben Pearson (###-####) at 15:00 (10-10-08) and expained the requirement of CUP07-00008 condition of approval # 7. He will install two evergreens and two shrubs along the south property line.
|
FIRE-Final Inspection | 10/8/2008 | 10/10/2008 | 10/9/2008 | A | PASS |
Troy Cobbley
|
|
|
Corrections made per last inspection. KR
|
FIRE-Final Inspection | 10/7/2008 | 10/8/2008 | 10/8/2008 | A | FAIL |
Troy Cobbley
|
|
|
fire life safety failed. Crash bars not installed per approved plans. KR.
|
BLD-Wall cover | 7/28/2008 | 7/29/2008 | 7/29/2008 | A | PASS |
Mike Jordan
|
|
|
Ben Phone #: ###-####. Verified all fire stop on thru and membrane penetrations on 2hr. fire barrier wall.
|
BLD-Other | 7/22/2008 | 7/22/2008 | 7/22/2008 | P | PART |
Mike Jordan
|
|
|
ben - drywall taping Phone #: ###-####. 2hr. fire barrier wall, final layer, west side. Still need to verify firecaulking on west side.
|
BLD-Other | 7/17/2008 | 7/18/2008 | 7/18/2008 | A | PART |
Mike Jordan
|
|
|
ben Note:fire wall please call 1/2 hr prior to inspection Phone #: ###-####. 2hr. wall, 2nd layer east side, 1st layer west side.
|
BLD-Other | 7/16/2008 | 7/16/2008 | 7/16/2008 | P | PART |
Mike Jordan
|
|
|
ben Note: fire wall Phone #: ###-####. 1st. layer of 2hr. wall, east side only.
|
BLD-Energy code compliance | 7/14/2008 | 7/15/2008 | 7/16/2008 | A | PASS |
Mike Jordan
|
|
|
ben - exterior insulation Phone #: ###-####
|
BLD-Framing/Rough-in | 7/14/2008 | 7/14/2008 | 7/16/2008 | P | PASS |
Mike Jordan
|
|
|
ben Phone #: ###-####. All issues resolved.
|
BLD-Framing/Rough-in | 7/10/2008 | 7/10/2008 | 7/10/2008 | P | PART |
Dave Hannah
|
|
|
Ben Phone #: ###-#### ok to insulate still need to see truss engineering strape overcut and under lapped splices in top plates finish rocking 2hr wall and fire cualk pins and flase around fire dampers
|
BLD-Framing/Rough-in | 7/9/2008 | 7/9/2008 | 7/9/2008 | P | NR |
Mike Jordan
|
|
|
ben Phone #: ###-####.Needs mech ri insp.
|
BLD-Wall cover | 6/5/2008 | 6/5/2008 | 6/5/2008 | P | PART |
Mike Jordan
|
|
|
Ben Phone #: ###-####. 2nd layer of 2hr. wall at attic only.
|
BLD-Wall cover | 6/2/2008 | 6/2/2008 | 6/2/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/2/2008 at 8:32:50 AM. Contact: ###-####. 1st layer of 2hr firewall at attic area only.
|
BLD-Other | 5/28/2008 | 5/28/2008 | 5/28/2008 | P | PART |
Mike Jordan
|
|
|
ben note: fire wall Phone #: ###-####
|
FIRE-Final Inspection | 5/28/2008 | 5/28/2008 | 5/28/2008 | P | CANC |
Troy Cobbley
|
|
|
ben Note: fire wall Phone #: ###-####
|
BLD-Other | 5/9/2008 | 5/12/2008 | 5/12/2008 | A | PART |
Mike Jordan
|
|
|
Ben, exterior wall sheathing; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Exterior shear nail only.
|
BLD-Other | 5/7/2008 | 5/8/2008 | 5/8/2008 | P | PART |
Mike Jordan
|
|
|
ben - exterior sheeting shear Phone #: ###-####. Shear nail for roof diaphragm.
|
Plan resubmittals received | | | 4/8/2008 | | DONE |
|
|
|
Plan Modifications recieved.
|
Routing - FIRE | 4/8/2008 | | 4/8/2008 | | PASS |
Scott Arellano
|
|
|
Plan modification approved by Mark Senteno.
|
BLD-Other | 4/7/2008 | 4/7/2008 | 4/7/2008 | P | NR |
Mike Jordan
|
|
|
ben - prep for slab on grade Phone #: ###-####. wire mesh not yet in place, comnc. will hacve special insp, messh will be verified by special insp.
|
BLD-Footing | 1/28/2008 | 1/29/2008 | 1/29/2008 | A | PART |
Mike Jordan
|
|
|
ben - rebar Phone #: ###-####. wip. Perimeter stemwalls ok. Installing reinforcement at attachement to existing bldg. ok for conc. pend. approval of special insp. conc. placement cancelled for today.
|
BLD-Footing | 1/24/2008 | 1/25/2008 | 1/25/2008 | A | CANC |
Jim Sly
|
|
|
ben Phone #: ###-#### Special insp required........OK pending Geotech special inspections, tests, and approvals.
|
Issue PAID IN FULL permit | | | 12/27/2007 | | DONE |
|
|
|
|
Telephone call | | | 11/14/2007 | | DONE |
|
|
|
t/c w amber at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 11/14/2007 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 11/9/2007 | | 11/13/2007 | | PASS |
|
|
|
received response letter & structural calcs (7) pages & "1" sheet of S-101-for AHJ---called action courier for pickup
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/13/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/13/2007 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 10/5/2007 | | 11/13/2007 | | PASS |
|
|
|
11/13/2007 13:45:14 RMH - activity updated through activity BLDA022 from case BLD07-02123.
|
Routing - PLAN CHECK | 10/9/2007 | | 11/13/2007 | | PASS |
|
|
|
|
Plan resubmittals received | | | 11/7/2007 | | |
|
|
|
received 1 transmittal,1 response,2 structural calcs,and 3 copies of sheet S-101 taken to Ron H.
|
Routing Off Site - STRUCTURAL | 10/22/2007 | | 10/30/2007 | | FAIL |
|
|
|
Called Action Courier for pick up 10/22/07 @ 8:31am BAS
10/30/07 - Review from outside engineer requires resubmittals.
|
Routing - PUBLIC WORKS | 10/9/2007 | | 10/9/2007 | | PASS |
|
|
|
|
Routing PW Solid Waste | 10/9/2007 | | 10/9/2007 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 10/9/2007 | | 10/9/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Plan assigned to (M_P) | 8/16/2007 | 8/16/2007 | 10/5/2007 | | DONE |
|
|
|
Plans have been assigned to Ron Hill.
|
Plan Reviewer's activity | | | 10/5/2007 | | |
|
|
|
Plans have been assigned to Ron Hill.
|
Routing - PLAN CHECK | 9/21/2007 | | 10/5/2007 | | |
|
|
|
Plans have been assigned to Ron Hill.
|
Plan resubmittals received | | | 10/3/2007 | | |
|
|
|
received 1 transmittal,1 wall & interior partitions 1 memo,1 response,3 review comments,3 structural calcs,3 copys of sheets SL-1.1,A-1.1,A-2.1,A-3.1,A-4.1,A-7.1,P0.2,M1.0,P0.3,P1.0,P1.1 AND 9 COPYS OF SHEET S-101 taken to Mike P.
|
Routing - Erosion and Sediment | 9/20/2007 | | 9/21/2007 | | FAIL |
|
|
|
The RP listed on the application is not certified by Boise City. Returned to Plan Review.
|
Routing - PUBLIC WORKS | 9/6/2007 | | 9/20/2007 | | FAIL |
|
|
|
|
Routing PW Drainage | 9/6/2007 | | 9/20/2007 | | PASS |
|
|
|
|
Routing PW Solid Waste | 9/20/2007 | | 9/20/2007 | | FAIL |
|
|
|
Permanent trash enclosure and dumpster are not shown on the plans.
|
Routing - PLAN CHECK | 9/5/2007 | | 9/6/2007 | | |
|
|
|
Routing to P.W.
|
Plan resubmittals received | | | 9/6/2007 | | |
|
|
|
Received transmittal, one Geotechnical Report, and two copies of site plan and drainage plan; inserted into plans
|
1st review completed | | | 9/5/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 8/31/2007 | | 9/5/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
Routing - PLANNING | 8/27/2007 | | 9/3/2007 | | PASS |
|
|
|
Diane P.
|
Routing - PLAN CHECK | 8/27/2007 | | 8/31/2007 | | PASS |
|
|
|
Plan review completed, sent correction report to the architect. Additional informaiton is required to be submitted and reviewed prior to issuing permit.
|
Routing Off Site - STRUCTURAL | 8/16/2007 | | 8/31/2007 | | FAIL |
|
|
|
Called Action Couriers for pick up
|
Routing - PLUMBING | 8/22/2007 | | 8/27/2007 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 8/21/2007 | | 8/22/2007 | | FAIL |
|
|
|
Contractor has been identified but rp listed on application is not certified.
|
Routing - PUBLIC WORKS | 8/16/2007 | | 8/21/2007 | | FAIL |
|
|
|
|
Routing PW Street Lights | 8/20/2007 | | 8/21/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 8/16/2007 | | 8/21/2007 | | PASS |
|
|
|
|
Routing PW Environmental | 8/21/2007 | | 8/21/2007 | | PASS |
|
|
|
1000 gallon grease interceptor size is ok for small kitchen operation.
|
Routing PW Solid Waste | 8/21/2007 | | 8/21/2007 | | FAIL |
|
|
|
Enclosure for dumpsters must be shown with dimensions. Minimum inside dimensions are 11' wide by 8' deep, with doors opening at least 120 degrees. Show location of existing dumpsters.
Contact: Peter McCullough, Public Works, ###-####
|
Routing PW Sewer Design | 8/16/2007 | | 8/20/2007 | | PASS |
|
|
|
|
Routing PW Drainage | 8/16/2007 | | 8/17/2007 | | FAIL |
Brian Murphy
|
|
|
failed O&M, SWALE ON PRPERTYLINE , Perc tests.
|
Pending Assignment by MYS | 8/14/2007 | | 8/16/2007 | | DONE |
|
|
|
8/16/2007 08:31:53 LEG - activity updated through activity BLDA170 from case BLD07-02123.
|
Plans ACCEPTED BY PLAN TECH | | | 8/16/2007 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/16/2007 | | |
|
|
|
|
Routing - PLANNING Land Div | 8/16/2007 | | 8/16/2007 | | PASS |
|
|
|
existing building, previous permits OK daa/jej
|
Application received | | | 8/14/2007 | | |
|
|
|
|
PubWorks Occupancy Approval | 10/15/2008 | 10/15/2008 | | | |
|
|
|
|