Third Notice BLD | 6/6/2008 | 6/6/2008 | 10/22/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 4/23/2008 | 4/23/2008 | 6/6/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 2/15/2008 | 4/23/2008 | | DONE |
|
|
|
|
BLD-Final | 2/14/2008 | 2/15/2008 | 2/15/2008 | A | PASS |
Mike Jordan
|
|
|
Ronnie Phone #: ###-####. ok for perm occ.
|
Permanent Occupancy | | | 2/15/2008 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/14/2008 | 2/14/2008 | 2/14/2008 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Framing/Rough-in | 2/7/2008 | 2/8/2008 | 2/8/2008 | P | PASS |
Mike Jordan
|
|
|
Above ceiling inspection please-Ronnie Phone #: ###-####. Ceiling grid ok. CISCA 0-2 tyoe system installed. Also recieved revised drawing from architect reflecting actual work done.
|
BLD-Framing/Rough-in | 1/25/2008 | 1/28/2008 | 1/28/2008 | A | FAIL |
Mike Jordan
|
|
|
ronnie Phone #: ###-####. N eeds to provide ceiling grid system to be installed. No pop rivets allowed. Architect to provide additional drawings for work done to reflect approved plans, work being done does not reflect scope of work. c/n posted. Store front framing ok pending elec ri insp.
|
BLD-Aging Inspection | 1/8/2008 | 1/8/2008 | 1/8/2008 | | PASS |
Mike Jordan
|
|
|
Spoke to general contractor, plans should be picked up in next couple of days and work will be started.
|
Issue PAID IN FULL permit | | | 10/9/2007 | | DONE |
|
|
|
|
MISC ACTIONS | | | 10/9/2007 | | |
|
|
|
Received UPS package from Hardcastle Construction with check and packaging to mail them the plans. I called Hardcastle and told him package not big enough for plan sets, he said would send UPS rep. here tomarrow to pick up with new bigger packaging.
|
Print Occupancy Form | | | 10/3/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/3/2007 | | DONE |
|
|
|
t/c w tim pleger at 1-###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 10/3/2007 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/2/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/14/2007 | | 10/2/2007 | | PASS |
|
|
|
|
Plan assigned to (R_H) | 9/1/2007 | | 10/2/2007 | | PASS |
|
|
|
10/2/2007 13:59:16 RMH - activity updated through activity BLDA022 from case BLD07-02131.
|
Plan resubmittals received | | | 10/1/2007 | | |
|
|
|
Received transmittal, response letter, three copies of structural calcs, and three copies of pages T, SP1, SP2, D1, A1, A1.1, A2, A2.1, A3, A4, A4.1, A5, M1, M2, M3, E1, E2, E3, E4, S1, S2; taken to Ron Hill
|
1st review completed | | | 9/14/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 9/10/2007 | | 9/14/2007 | | PASS |
|
|
|
IFC Review
|
Case Summary (BLD) | | | 9/10/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/5/2007 | | 9/10/2007 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 9/1/2007 | | 9/5/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 8/17/2007 | | 9/1/2007 | | DONE |
|
|
|
9/1/2007 11:49:18 MYS - activity updated through activity BLDA175 from case BLD07-02131.
|
Plans ACCEPTED BY PLAN TECH | | | 8/17/2007 | | |
|
|
|
|
Plan resubmittals received | | | 8/17/2007 | | DONE |
|
|
|
received 3 copies of replacement cover sheet; inserted in plans
|
Recd Pcfee & Taken To Pln CK | | | 8/14/2007 | | DONE |
|
|
|
|
Application received | | | 8/14/2007 | | |
|
|
|
called applicant and told him need one copy of cover sheet not stamped "preliminary not for construction" prior to beginning routing
|