First Notice | 2/22/2008 | 2/22/2008 | 3/11/2008 | | DONE |
Mike Jordan
|
|
|
|
Routing - PUBLIC WORKS | 8/17/2007 | | 3/11/2008 | | PASS |
Cathy Brown
|
|
|
|
BLD-Final | 2/22/2008 | 2/22/2008 | 2/22/2008 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 2/22/2008 | 2/22/2008 | 2/22/2008 | P | PASS |
Mike Jordan
|
|
|
Received letter from special insp. agency. No issues were noted. Letter of compliance was issued for shell and core.
|
BLD-Final | 2/21/2008 | 2/21/2008 | 2/21/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/21/2008 at 7:55:22 AM. Contact: ###-####. Everything ok, Need final letter from special insp. agency prior to issuing letter of compliance for shell and core.
|
BLD-Energy code compliance | 2/21/2008 | 2/21/2008 | 2/21/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/21/2008 at 7:54:40 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/21/2008 | 2/21/2008 | 2/21/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/21/2008 at 7:53:42 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/20/2008 | 2/20/2008 | 2/20/2008 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/20/2008 at 7:06:00 AM. Contact: ###-####.
|
BLD-Energy code compliance | 2/20/2008 | 2/20/2008 | 2/20/2008 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/20/2008 at 7:06:41 AM. Contact: ###-####.
|
BLD-Final | 2/20/2008 | 2/20/2008 | 2/20/2008 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/20/2008 at 7:08:13 AM. Contact: ###-####.
|
FIRE-Final Inspection | 2/18/2008 | 2/19/2008 | 2/19/2008 | A | PASS |
Troy Cobbley
|
|
|
LIfe safety passed. I will verify addresses when the tenant improvements are done since each space has the potential to be a separate street address. The same for door hardware.
|
Code Occupancy Approval | 2/19/2008 | 2/19/2008 | 2/19/2008 | A | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL CARD SIGNED OFF
|
FIRE-Final Inspection | 2/7/2008 | 2/8/2008 | 2/8/2008 | A | FAIL |
Troy Cobbley
|
|
|
The relocated fire hydrant to the southwest of the building does not meet the min. 18" from the ceter of the outlet to the ground requirement in NFPA 24 7.3.3. Also a new fire hydrant has been added roughly 30'-0" to the northeast of the building. This hydrant is not shown on the grading plans.
|
BLD-Framing/Rough-in | 12/4/2007 | 12/5/2007 | 12/5/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/4/2007 at 5:25:59 PM. Contact: ###-####. Exterior shear, nailing for roof diaphragm and all hardware.
|
BLD-Foundation | 10/24/2007 | 10/24/2007 | 10/24/2007 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/24/2007 at 7:49:24 AM. Contact: ###-####.
|
BLD-Energy code compliance | 10/24/2007 | 10/24/2007 | 10/24/2007 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/24/2007 at 7:49:24 AM. Contact: ###-####.
|
BLD-Footing | 10/15/2007 | 10/16/2007 | 10/16/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/15/2007 at 10:17:30 AM. Contact: ###-####. footing for trash enclosure.
|
BLD-Footing | 10/10/2007 | 10/10/2007 | 10/10/2007 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/10/2007 at 10:58:30 AM. Contact: ###-####. two interior column pad footings. ok. Also reviewed special insp. reports. ok.
|
BLD-Footing | 10/4/2007 | 10/5/2007 | 10/5/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/4/2007 at 10:26:57 AM. Contact: ###-####. wip on stemwalls, also reviewed special insp. report for footings, ok.
|
BLD-Footing | 10/2/2007 | 10/3/2007 | 10/3/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/2/2007 at 11:59:24 AM. Contact: ###-####.wip, footings will have special insp. Footing subgrade approved by geotech engineer as per contractor. Noted to contractor to have report on site for next insp.
|
(F) Reprint permit | | | 9/28/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/27/2007 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 8/16/2007 | 8/16/2007 | 9/26/2007 | | PASS |
|
|
|
9/26/2007 09:47:09 JCM - activity updated through activity BLDA022 from case BLD07-02145.
|
Routing - PLAN CHECK | 9/25/2007 | | 9/26/2007 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 9/26/2007 | | DONE |
|
|
|
Prepared plans for issue and routed to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/26/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/26/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/26/2007 | | DONE |
|
|
|
Called Ari w/Rimrock Dev. ###-#### and left voice message that permit is ready, fees and need GC, RCE, RP, ACHD
|
Routing - FIRE | 9/24/2007 | | 9/25/2007 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Routing - PLAN CHECK | 9/19/2007 | | 9/24/2007 | | |
|
|
|
|
Plan resubmittals received | | | 9/21/2007 | | |
|
|
|
Received 1 cover transmittal and 2 copies of sheet C1.2 and inserted into the plans by architects office and taken back to John Menards office afterwards///9/21/07 @ 2:15pm BAS
|
Routing - PUBLIC WORKS | 9/18/2007 | | 9/19/2007 | | PASS |
|
|
|
|
Routing PW Solid Waste | 9/18/2007 | | 9/19/2007 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/14/2007 | | 9/18/2007 | | |
|
|
|
|
Routing PW Drainage | 9/18/2007 | | 9/18/2007 | | PASS |
|
|
|
|
1st review completed | | | 9/14/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 9/11/2007 | | 9/14/2007 | | FAIL |
|
|
|
Emailed and Faxed resubmittal item to architect.
|
Routing - PLAN CHECK | 9/7/2007 | | 9/11/2007 | | PASS |
|
|
|
John Menard
|
Plan Reviewer's activity | | | 9/11/2007 | | PASS |
|
|
|
Plan reviewed and approved with attached clarification list for nonstructural items and reviewed and approved structural revised plans and calculations. JCM
|
Plan resubmittals received | | | 9/10/2007 | | DONE |
|
|
|
received 1 response, 3 structural calcs,and 3 copys of sheets S0.1,S1.1,S3.1,S4.1,C1.0 plans inserted into plans and taken to John M.
|
Routing - PLANNING | 8/29/2007 | | 9/7/2007 | | PASS |
|
|
|
DRH06-00094 Sarah S.
|
Routing - PLUMBING | 8/27/2007 | | 8/29/2007 | | PASS |
|
|
|
Per plans and specs and 2003 UPC
|
Routing Off Site - STRUCTURAL | 8/16/2007 | | 8/28/2007 | | FAIL |
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 8/28/2007 | | DONE |
|
|
|
Faxed the architect a copy of structural plan review requesting revisions.
|
Routing - Erosion and Sediment | 8/24/2007 | | 8/27/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing PW Sewer Rating | 8/20/2007 | | 8/24/2007 | | PASS |
|
|
|
|
Routing PW Solid Waste | 8/20/2007 | | 8/24/2007 | | FAIL |
|
|
|
Enclosure not accessible to solid waste trucks if parking lot is occupied. Angle enclosure to the North 20-30 degrees.
|
Routing PW Environmental | 8/24/2007 | | 8/24/2007 | | PASS |
|
|
|
WestBoise Sewer Dist. common grease line shown thru shell and core with 1500 gal GI in place.
|
Routing PW Drainage | 8/20/2007 | | 8/22/2007 | | FAIL |
Brian Murphy
|
|
|
Need to show this was approved as a pad site otherwise it is new redevelopment.
|
Routing PW Street Lights | 8/20/2007 | | 8/22/2007 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 8/16/2007 | | 8/17/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 8/15/2007 | | 8/16/2007 | | DONE |
|
|
|
8/16/2007 10:06:04 LEG - activity updated through activity BLDA166 from case BLD07-02145.
|
Telephone call | | | 8/16/2007 | | |
|
|
|
called Action Couriers for pick up
|
Plans ACCEPTED BY PLAN TECH | | | 8/16/2007 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/16/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/16/2007 | | DONE |
|
|
|
|
Application received | | | 8/15/2007 | | |
|
|
|
|