ACHD Occupancy Approval | 10/15/2009 | 10/15/2009 | 10/15/2009 | | DONE |
Barbara Stitt
|
|
|
Email approval from Nan with ACHD 10-9-09 BAS
|
Permanent Occupancy | | | 10/15/2009 | | DONE |
Barbara Stitt
|
|
|
|
PubWorks Occupancy Approval | 10/9/2009 | 10/9/2009 | 10/9/2009 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 10/9/2009 | 10/9/2009 | 10/9/2009 | | DONE |
Susan Riggs
|
|
|
|
Temporary Occupancy | 6/3/2008 | 9/1/2008 | 6/3/2008 | | DONE |
Cathy Weisshaupt
|
|
|
|
BLD-Final | 5/30/2008 | 6/2/2008 | 6/2/2008 | A | PART |
Mike Jordan
|
|
|
Ron; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. temp occ granted. Will be ok for for perm occ. once public works and code enforcement has signed perm.
|
BLD-Final | 5/28/2008 | 5/29/2008 | 5/29/2008 | A | NR |
Mike Jordan
|
|
|
ron Phone #: ###-####
|
Code Occupancy Approval Temp | 5/28/2008 | 5/28/2008 | 5/28/2008 | P | DONE |
Scott M.Brown
|
|
|
BOND POSTED FOR LANDSCAPE + $150,359. TEMP SIGNED.
|
FIRE-Final Inspection | 5/2/2008 | 5/5/2008 | 5/5/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The additional smoke detector outside of the ground floor bedroom has been added.
|
FIRE-Final Inspection | 5/1/2008 | 5/2/2008 | 5/2/2008 | A | FAIL |
Troy Cobbley
|
|
|
Provide a smoke alarm immediatey outside of the bottom floor bedroom as per code and shown on the approved plans. I notified the contractor the the smoke detectors in the second floor corridor will need to be centered on all future apartments. Contractor to provide approved drawing that shows the location of the two new fire hydrants.
|
BLD-Energy code compliance | 2/28/2008 | 2/29/2008 | 2/29/2008 | A | PASS |
Mike Jordan
|
|
|
ron Phone #: ###-####
|
BLD-Framing/Rough-in | 2/27/2008 | 2/28/2008 | 2/28/2008 | A | PASS |
Mike Jordan
|
|
|
ron Phone #: ###-####
|
BLD-Other | 2/4/2008 | 2/4/2008 | 2/4/2008 | P | PART |
Mike Jordan
|
|
|
ron - note: shear Phone #: ###-####. Exterior shear only.
|
BLD-Foundation | 12/5/2007 | 12/5/2007 | 12/5/2007 | P | PART |
Mike Jordan
|
|
|
kenny Phone #: ###-####
|
BLD-Foundation | 11/30/2007 | 11/30/2007 | 11/30/2007 | P | PART |
Mike Jordan
|
|
|
manual Phone #: ###-####. wip.
|
BLD-Footing | 11/29/2007 | 11/29/2007 | 11/29/2007 | P | PASS |
Mike Jordan
|
|
|
manual Note: foundation wall Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/1/2007 | | |
|
|
|
|
Telephone call | | | 10/25/2007 | | DONE |
|
|
|
t/c w robert unger at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 10/25/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/24/2007 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 9/6/2007 | 9/6/2007 | 10/22/2007 | | PASS |
|
|
|
10/22/2007 15:41:13 SRZ - activity updated through activity BLDA022 from case BLD07-02188.
|
Routing - PLAN CHECK | 10/17/2007 | | 10/22/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/22/2007 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/16/2007 | | |
|
|
|
Received 1 cover transmittal, 2 copies of responce letter from Houston-Bugatsch, 2 copies of A1.0, A2.0, A2.1, A4.1, A4.2, A4.4, A4.5, A5.0, A6.0, S2.0 and inserted into plans then taken to Sam Zahorka///10/16/07 @ 3:18pm BAS
|
Routing - PUBLIC WORKS | 10/10/2007 | | 10/11/2007 | | PASS |
|
|
|
|
Routing - PLANNING | 10/11/2007 | | 10/11/2007 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/4/2007 | | 10/10/2007 | | PEND |
|
|
|
|
Routing PW Solid Waste | 10/10/2007 | | 10/10/2007 | | PASS |
|
|
|
|
Routing - FIRE | 9/28/2007 | | 10/4/2007 | | PASS |
|
|
|
|
1st review completed | | | 10/4/2007 | | FAIL |
|
|
|
|
1st review completed | | | 9/28/2007 | | FAIL |
|
|
|
Correction letter mailed to the Architect. (SRZ)
|
Case Summary (BLD) | | | 9/28/2007 | | |
|
|
|
|
Routing - PLAN CHECK | 9/7/2007 | | 9/28/2007 | | FAIL |
|
|
|
Correction letter mailed to the Architect. (SRZ)
|
Routing - PLUMBING | 9/6/2007 | | 9/7/2007 | | PASS |
|
|
|
|
Routing - PLANNING | 9/7/2007 | | 9/7/2007 | | FAIL |
|
|
|
DRH05-00318-Sarah Shaefer
CUP05-00018-Susan Riggs
The DR and the CU for this project have expired. The applicant will be required to resubmit all information for new public hearings.
I contacted Bob Unger to let him know. He will process the applications.
|
Plan assigned to (M_P) | 8/15/2007 | 8/15/2007 | 9/6/2007 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/4/2007 | | 9/6/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing PW Street Lights | | | 9/4/2007 | | PASS |
|
|
|
|
Routing PW Drainage | | | 9/4/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 9/4/2007 | | 9/4/2007 | | PASS |
|
|
|
|
Routing PW Solid Waste | | | 9/4/2007 | | FAIL |
|
|
|
Show trash enclosure details- (dimensions, height, gates)
|
Routing - PUBLIC WORKS | 8/29/2007 | | 9/4/2007 | | FAIL |
|
|
|
|
Routing PW Sewer Design | 8/29/2007 | | 8/31/2007 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 8/28/2007 | | 8/29/2007 | | PEND |
|
|
|
Multi family project - City Engineer signed off on July 18 2007
Final plat not yet recorded
SUB05-00012 & CAR05-00006
|
Recd Pcfee & Taken To Pln CK | | | 8/23/2007 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/22/2007 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/22/2007 | | |
|
|
|
|
Application received | | | 8/15/2007 | | |
|
|
|
|