BLD-Final | 1/6/2010 | 1/7/2010 | 1/7/2010 | A | PASS |
Mike Jordan
|
|
|
Mike- let me know when you sign this off-thanks Barb Phone #: ###-####. Spoke with Tony Young about previous final inspection. Should be ok for perm occ.
|
FIRE-Final Inspection | 1/6/2010 | 1/7/2010 | 1/7/2010 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Permanent Occupancy UNPAID FEE | | | 1/7/2010 | | DONE |
Barbara Stitt
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/6/2010 | | DONE |
Barbara Stitt
|
|
|
Change status to Issue so Troy Cobbley could document some fire information that was required///1-6-10 BAS
|
ACHD Occupancy Approval | 10/15/2009 | 10/15/2009 | 10/15/2009 | | DONE |
Barbara Stitt
|
|
|
Email approval from Nan with ACHD 10-9-09 BAS
|
Permanent Occupancy UNPAID FEE | | | 10/15/2009 | | DONE |
Barbara Stitt
|
|
|
|
PubWorks Occupancy Approval | 10/9/2009 | 10/9/2009 | 10/9/2009 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 10/9/2009 | 10/9/2009 | 10/9/2009 | | DONE |
Susan Riggs
|
|
|
|
FIRE-Final Inspection | 6/16/2008 | 6/17/2008 | 6/17/2008 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the fire dept access is paved. The contractor provided verification that the road could support 75,000lbs as per the IFC
|
BLD-Final | 6/16/2008 | 6/17/2008 | 6/17/2008 | A | PART |
Tony Young
|
|
|
ron - late morning please Phone #: ###-#### temp ok pending others
|
Temporary Occupancy UNPAID FEE | | | 6/17/2008 | | DONE |
Cathy Weisshaupt
|
|
|
|
FIRE-Final Inspection | 6/10/2008 | 6/11/2008 | 6/11/2008 | A | FAIL |
Troy Cobbley
|
|
|
The smoke alarms and the fire extinguishers are ok but I need the revised site plan showing the modified fire dept. access to this building since sprinkler protection is not being installed.
|
Code Occupancy Approval Temp | 5/28/2008 | 5/28/2008 | 5/28/2008 | P | DONE |
Scott M.Brown
|
|
|
BOND POSTED FOR LANDSCAPE + $150,359. TEMP SIGNED.
|
BLD-Energy code compliance | 5/15/2008 | 5/16/2008 | 5/16/2008 | A | PASS |
Mike Jordan
|
|
|
kenny - insulation Phone #: ###-####
|
BLD-Framing/Rough-in | 5/14/2008 | 5/15/2008 | 5/15/2008 | A | PASS |
Mike Jordan
|
|
|
Kenny; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Framing/Rough-in | 4/11/2008 | 4/11/2008 | 4/11/2008 | P | PART |
Mike Jordan
|
|
|
Ron, shear nail, please; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. exterior shear only.
|
BLD-Foundation | 2/20/2008 | 2/20/2008 | 2/20/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/20/2008 at 6:37:20 AM. Contact: ###-####.
|
BLD-Footing | 2/19/2008 | 2/19/2008 | 2/19/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/19/2008 at 7:03:33 AM. Contact: ###-####. wip. footing subgrade has dried.
|
BLD-Aging Inspection | 2/4/2008 | 2/4/2008 | 2/4/2008 | | PASS |
Mike Jordan
|
|
|
wip. Delays due to weather.
|
Issue PAID IN FULL permit | | | 11/1/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/25/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/25/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/25/2007 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 9/6/2007 | 9/6/2007 | 10/22/2007 | | PASS |
|
|
|
10/22/2007 16:18:39 SRZ - activity updated through activity BLDA022 from case BLD07-02226.
|
Routing - PLAN CHECK | 10/17/2007 | | 10/22/2007 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 10/22/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/22/2007 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/16/2007 | | |
|
|
|
Received 1 cover transmittal, 2 copies of responce letter from Houston-Bugatsch, 2 copies of A1.0, A2.0, A2.1, A4.1, A4.2, A4.4, A4.5, A5.0, A6.0, S2.0 and inserted into plans then taken to Sam Zahorka///10/16/07 @ 3:18pm BAS
|
Routing - PLANNING | 10/11/2007 | | 10/11/2007 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/10/2007 | | 10/11/2007 | | PASS |
|
|
|
|
Routing PW Solid Waste | 10/10/2007 | | 10/10/2007 | | PASS |
|
|
|
|
Routing - FIRE | 10/8/2007 | | 10/10/2007 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Routing - PLAN CHECK | 10/10/2007 | | 10/10/2007 | | PEND |
|
|
|
|
Plan resubmittals received | | | 10/9/2007 | | DONE |
|
|
|
Recieved revised site plan sheet #1. (2) copies reflecting new 28 foot inside/ 48 foot outside turning radii.
|
Routing - PLAN CHECK | 10/4/2007 | | 10/8/2007 | | PEND |
|
|
|
Pending corrections. (SRZ)
|
1st review completed | | | 10/4/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 9/28/2007 | | 10/4/2007 | | FAIL |
|
|
|
Faxed and emailed architect resubmittal items.
|
Routing - PLAN CHECK | 9/7/2007 | | 9/28/2007 | | FAIL |
|
|
|
Plan correction list mailed to the Architect. (SRZ)
|
1st review completed | | | 9/28/2007 | | FAIL |
|
|
|
|
Routing - PLUMBING | 9/6/2007 | | 9/7/2007 | | PASS |
|
|
|
|
Routing - PLANNING | 9/7/2007 | | 9/7/2007 | | FAIL |
|
|
|
DRH05-00318-Sarah Shaefer
CUP05-00018-Susan Riggs
|
Plan assigned to (M_P) | 8/16/2007 | 8/16/2007 | 9/6/2007 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/4/2007 | | 9/6/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing PW Street Lights | | | 9/4/2007 | | PASS |
|
|
|
|
Routing PW Drainage | | | 9/4/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 9/4/2007 | | 9/4/2007 | | PASS |
|
|
|
|
Routing PW Solid Waste | | | 9/4/2007 | | FAIL |
|
|
|
Show trash enclosure details- (dimensions, height, gates)
|
Routing - PUBLIC WORKS | | | 9/4/2007 | | FAIL |
|
|
|
|
Routing PW Sewer Design | 8/29/2007 | | 8/31/2007 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 8/28/2007 | | 8/29/2007 | | PEND |
|
|
|
Multi family project - City Engineer signed off on July 18 2007
Final plat not yet recorded
SUB05-00012 & CAR05-00006
|
Recd Pcfee & Taken To Pln CK | | | 8/23/2007 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/22/2007 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/22/2007 | | |
|
|
|
|
Application received | | | 8/16/2007 | | |
|
|
|
|