PubWorks Occupancy Approval | 11/13/2009 | 11/13/2009 | 11/13/2009 | | DONE |
Tiffany Lowery
|
|
|
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/27/2008 | 8/11/2008 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 5/27/2008 | | DONE |
|
|
|
|
Code Occupancy Approval | 4/8/2008 | 4/8/2008 | 4/8/2008 | P | PASS |
Dena Gambrel
|
|
|
|
Code Occupancy Approval Temp | 3/11/2008 | 3/11/2008 | 3/11/2008 | P | PASS |
Dena Gambrel
|
|
|
3-11-08 1400 TEMP ONLY. Need an updated landscape plan submitted and approved for the changes in grass areas and plants used. Need to stripe one more parking area for handicape parking, install the above ground handicape sign, and install two wheel stops in the handicape parking area.
|
BLD-Aging Inspection | 3/4/2008 | 3/4/2008 | 3/4/2008 | | PASS |
Jim Storey
|
|
|
card was on site at last insp.all signed for perm.
|
BLD-Final | 12/20/2007 | 12/20/2007 | 12/20/2007 | P | PASS |
Jim Storey
|
|
|
henry Phone #: ###-####
|
FIRE-Final Inspection | 12/17/2007 | 12/17/2007 | 12/18/2007 | P | PASS |
Forrest France
|
|
|
Life safety inspection passed.
|
FIRE-Final Inspection | 12/12/2007 | 12/14/2007 | 12/14/2007 | P | NR |
Forrest France
|
|
|
Not ready...KR
|
BLD-Other | 12/13/2007 | 12/13/2007 | 12/13/2007 | P | PASS |
Jim Storey
|
|
|
ceilling ok
|
BLD-Framing/Rough-in | 12/12/2007 | 12/13/2007 | 12/13/2007 | A | CANC |
Jim Storey
|
|
|
henry - ceiling Phone #: ###-#### called and wanted to be rolled to pm
|
BLD-Energy code compliance | 11/19/2007 | 11/19/2007 | 11/19/2007 | P | PASS |
Jim Storey
|
|
|
henry - insulation Phone #: ###-####
|
BLD-Framing/Rough-in | 11/8/2007 | 11/9/2007 | 11/9/2007 | P | PASS |
Jim Storey
|
|
|
Scott at ###-####
|
BLD-Other | 11/1/2007 | 11/2/2007 | 11/2/2007 | P | PASS |
Jim Storey
|
|
|
exterior wall sheeting/nailing inspection please--henry; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt exterior sheer nailling ok to cover.
|
Plan resubmittals received | | | 10/26/2007 | | |
|
|
|
Received transmittal and two copies of sheets A2.01, A2.02, A2.03; ok to log in as resubmittals per Tim W.; plans taken to Tim W.
|
BLD-Foundation | 10/18/2007 | 10/18/2007 | 10/18/2007 | P | PASS |
Jim Storey
|
|
|
henry Phone #: ###-####
|
BLD-Footing | 10/15/2007 | 10/16/2007 | 10/16/2007 | A | PASS |
Jim Storey
|
|
|
henry Phone #: ###-#### ft ok epoxy ok with si. si to cover concrete insp,
|
Issue PAID IN FULL permit | | | 10/1/2007 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 9/26/2007 | | 9/28/2007 | | PASS |
|
|
|
|
Routing PW Drainage | 9/26/2007 | | 9/28/2007 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 9/28/2007 | | 9/28/2007 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 9/28/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/28/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/28/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/28/2007 | | DONE |
|
|
|
t/c w chris anderson at ###-#### - permit ready and fees given - also need gc name, rce# and rp name
|
Permit Ready to Issue | | | 9/28/2007 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 9/11/2007 | | 9/28/2007 | | DONE |
|
|
|
Sent to fire. Passed per plan review report, approved plan, and requested redline.
|
Plan resubmittals received | | | 9/27/2007 | | |
|
|
|
received letter from achd (3) pages, letter of transmittal from rudeen & asso., (2) letter from tealey's land surveying//Also (3) sheets of AO.OO, (3) sheets of C02.O1, & C-2.O2--plans taken to Brian Murphy
|
Routing - PLAN CHECK | 9/17/2007 | | 9/26/2007 | | PEND |
|
|
|
Plan resubmittals recieved and plan was routed to Public Works.
|
Plan resubmittals received | | | 9/26/2007 | | |
|
|
|
Received transmittal, two copies of Drainage Report and O & M, five copies of pages C-2.01, C-2.02; inserted by architect rep.; plans taken back to Tim Woodard
|
1st review completed | | | 9/17/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 9/12/2007 | | 9/17/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
Case Summary (BLD) | | | 9/12/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/5/2007 | | 9/12/2007 | | PASS |
|
|
|
At engineers requested redlined in column under girder. Calculation for column is on sheet 7 of engineering.
|
Plan assigned to (JCM) | 8/27/2007 | | 9/11/2007 | | NA |
|
|
|
Reassigned to Tim Woodard at Jenifer's request.
|
Routing - PLANNING | 9/4/2007 | | 9/5/2007 | | PASS |
|
|
|
Approved per DRH07-00113.
|
Routing - PLUMBING | 8/29/2007 | | 9/4/2007 | | PASS |
|
|
|
|
Routing PW Drainage | 8/27/2007 | | 8/29/2007 | | FAIL |
Brian Murphy
|
|
|
infiltration swale or basin?
|
Routing PW Sewer Design | 8/29/2007 | | 8/29/2007 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 8/29/2007 | | 8/29/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 8/27/2007 | | 8/29/2007 | | FAIL |
|
|
|
|
Routing - PLANNING Land Div | 8/27/2007 | | 8/27/2007 | | PASS |
|
|
|
Parcel is larger than 5 acres
|
Plans ACCEPTED BY PLAN TECH | | | 8/27/2007 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/27/2007 | | |
|
|
|
|
Pending Assignment by MYS | 8/23/2007 | | 8/27/2007 | | DONE |
|
|
|
8/27/2007 08:53:02 JCM - activity updated through activity BLDA166 from case BLD07-02303.
|
Plan resubmittals received | | | 8/27/2007 | | |
|
|
|
received 1 transmittal from pc engineering & "4" sets of plans including each sheet of MO.OO, MO.O1, M1.OO, M1.O1, M2.OO, M2.O1, M3.OO, PO.OO, P2.OO, P2.O1. plans taken to Jason Blais.
8/28/07 Forwarded two copies of above sheets to John Menard.
|
Routing PW Sewer Rating | 8/27/2007 | | 8/27/2007 | | PASS |
|
|
|
|
Application received | | | 8/23/2007 | | |
|
|
|
|
Third Notice BLD | 9/22/2008 | 9/22/2008 | | | |
|
|
|
Second Notice has not been responded to.
|