Permit NumberBLD07-02307
StatusFinaled
Name K2 CONSTRUCTION
Site Address 4600 S APPLE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(MOTIVE POWER) To remodel the interior of an existing 4,890 sq.ft. office / restroom area with minor exterior remodel associated with an existing industrial site per approved plans. To perform selective interior demolition; construct interior non-combustible frame walls to create relocated training rooms, private office, break/work area and open office for 42 new built in desks; infill existing openings in perimeter walls and add 4 new 5' x 2' windows in north wall; upgrade doors, landings and hardware to comply for accessibility; to upgrade existing restrooms for accessibility by enlarging the Womens restroom to add a second water closet in an accessible stall and modifying the Mens restroom to add an accessible water closet in a stall and a urinal and add two new water closets; install suspended accoustical ceiling grid, interior finishes, accordion door and millwork; and to upgrade electrical, plumbing & mechanical. Note: This site and all buildings were constructed in Ada County and annexed into Boise City on 12/29/04. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/23/20084/23/20085/21/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice3/18/20083/18/20084/23/2008 DONE
DetailsJim Storey
BLD-Final3/17/20083/18/20083/18/2008PPASS
DetailsJim Storey
harvey Phone #: ###-####
DOC - Permit Finaled3/18/20083/18/20083/18/2008PPASS
DetailsJim Storey
FIRE-Final Inspection3/17/20083/18/20083/18/2008APASS
DetailsForrest France
Fire life safety inspection passed, incorrect sample tube placement at two duct detectors repaired while on site, weak battery at the EM light in the electrical room to be replaced as agreed.
BLD-Framing/Rough-in3/14/20083/14/20083/14/2008PPASS
DetailsJim Storey
harvey Phone #: ###-#### ceilling ok for cover.
BLD-Framing/Rough-in1/28/20081/29/20081/29/2008APASS
DetailsJim Storey
Harvey; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Conference12/26/200712/27/200712/27/2007PPASS
DetailsJim Storey
Need to schedule a conference with Jim Storey on this remodel and the exterior fire walls. Currently all walls are opened up and want his input. Contact the Super. Harvey Day ####-#### Phone #: ###-#### Internet Inspection Request from: Stacie Irish revied plan and walked job site.
Issue PAID IN FULL permit  11/7/2007 DONE
Plan resubmittals received  10/31/2007 DONE
Pick up new sheet and inserted into plans.
PLANS/APPL TAKEN TO FRONT DESK  10/31/2007 PASS
Inspection Record Card- Bld  10/31/2007 DONE
Telephone call  10/31/2007 DONE
left message w leslie for rocky towle a ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  10/31/2007 DONE
Telephone call  10/31/2007 DONE
rocky towle had the general contractor (K-2 Const.) for this permit call and give their rce#
Plan assigned to (DRS)9/14/2007 10/31/2007 PASS
10/31/2007 07:12:37 DRS - activity updated through activity BLDA022 from case BLD07-02307.
Routing - PLAN CHECK10/30/2007 10/31/2007 PASS
Received two full size copies of missing original Locomotive Repair Shop building for our records, to include the existing office/restroom areas being remodeled. Plans taken to permit desk to issue.
Plan resubmittals requested  10/30/2007 DONE
Phone message and e-mail to Rocky Towle concerning missing plans.
Routing - PLAN CHECK10/16/2007 10/30/2007 FAIL
Required floor plan for existing structure for our records was not provided. Phone call and e-mail to Rocky Towle concerning missing plans.
Plan resubmittals received  10/24/2007  
Received 1 cover transmittal, 1 response letter dated 10/22/07 from Rocky Towle (6pgs), 2 copies of sheets A0.0, A.01, A1.0, A1.1, A2.1, A3.1, A6.1, A7.1, EN1.0 and taken to Dan Stuart's desk///10/24-07 @ 8:38am BAS
Routing - FIRE10/11/2007 10/16/2007 PASS
Attached IFC review comments to plans.
1st review completed  10/16/2007 FAIL
Plan resubmittals requested  10/11/2007 DONE
Faxed and e-mailed copy of plan review items needing to be addressed to Rocky Towle, design Resources.
Routing - PLAN CHECK9/19/2007 10/11/2007 FAIL
Resubmittals required. Routing to fire code analyst.
Routing - PLANNING9/17/2007 9/19/2007 PASS
Sarah Schafer (minor exterior changes to building)
Routing - PUBLIC WORKS9/14/2007 9/19/2007 PASS
Routing PW Sewer Rating9/17/2007 9/17/2007 PASS
Telephone call  9/17/2007 DONE
Rocky Towell - called concerning plan routing.
Pending Assignment by MYS8/28/2007 9/14/2007 DONE
9/14/2007 16:17:13 MYS - activity updated through activity BLDA168 from case BLD07-02307.
Recd Pcfee & Taken To Pln CK  8/28/2007 DONE
Plans ACCEPTED BY PLAN TECH  8/28/2007  
Application received  8/23/2007