BLD-Final | 3/18/2016 | 3/18/2016 | 3/18/2016 | A | PASS |
Dave Hannah
|
|
|
as per Dave H-building final passed
|
DOC - Permit Finaled | | | 3/18/2016 | | DONE |
|
|
|
as per DAve H-ok to doc final for him
|
Letter of compliance/Occupancy | | | 3/18/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/18/2016 | | DONE |
|
|
|
as per Dave H-change status to iss
|
DOC - Permit Expired | 8/2/2010 | 8/2/2010 | 8/3/2010 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/2/2010 | 8/2/2010 | 8/2/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 5/27/2008 | 5/27/2008 | 5/27/2008 | P | PART |
Tony Young
|
|
|
paul Phone #: ###-#### most part looks ok,, need struct engineer to verify as built and look at end wall loading at purlins for ok or add point load support
|
BLD-Framing/Rough-in | 5/19/2008 | 5/20/2008 | 5/20/2008 | P | PART |
Dave Hannah
|
|
|
paul Phone #: ###-#### center and north 1/3rd of floor ok to cover
|
BLD-Framing/Rough-in | 5/5/2008 | 5/5/2008 | 5/5/2008 | P | PART |
Dave Hannah
|
|
|
paul lingard Phone #: ###-#### south end of second floor ok to cover
|
Inspection Record Card- Bld | | | 4/29/2008 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 4/29/2008 | | DONE |
|
|
|
|
Telephone call | | | 4/29/2008 | | DONE |
|
|
|
called Paul Shaffer permit ready and fee given
|
Issue PAID IN FULL permit | | | 4/29/2008 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 8/24/2007 | 8/24/2007 | 4/28/2008 | | PASS |
Ron Hill
|
|
|
4/28/2008 13:52:24 RMH - activity updated through activity BLDA022 from case BLD07-02308.
|
Routing - PLAN CHECK | 8/24/2008 | | 4/28/2008 | | PASS |
Ron Hill
|
|
|
|
Case Summary (BLD) | | | 4/28/2008 | | DONE |
|
|
|
|
1st review completed | | | 4/28/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/28/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/16/2008 | | |
|
|
|
Received 1 cover transmittal, 2 copies of structural calcs from Lochsa Engineering, 3 copies of sheet S-1 and taken to Ron Hill 4-16-08 @ 4:52pm BAS
|
Plan resubmittals received | | | 9/28/2007 | | |
|
|
|
received letter of transmittal for hummel arch (4) pages - took paperwork to Ron Hill
|
Pending Assignment by MYS | 8/23/2007 | | 8/24/2007 | | DONE |
|
|
|
8/24/2007 08:33:33 LEG - activity updated through activity BLDA175 from case BLD07-02308.
|
Plans ACCEPTED BY PLAN TECH | | | 8/24/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/24/2007 | | |
|
|
|
|
Application received | | | 8/23/2007 | | |
|
|
|
|