Second Notice BLD | 4/23/2008 | 4/23/2008 | 6/5/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 3/12/2008 | 4/23/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 3/12/2008 | | DONE |
|
|
|
|
BLD-Final | 3/7/2008 | 3/7/2008 | 3/7/2008 | P | PASS |
Jim Sly
|
|
|
All inspections are complete pending Dena Gambrel''s approval this morning. Call me if you have any questions of if the gate is locked. Phone #: ###-#### Internet Inspection Request from: Mark Bowen OK for Perm Occ.
|
Code Occupancy Approval | 3/7/2008 | 3/7/2008 | 3/7/2008 | P | PASS |
Dena Gambrel
|
|
|
|
Code Occupancy Approval | 3/4/2008 | 3/4/2008 | 3/4/2008 | P | FAIL |
Dena Gambrel
|
|
|
2-4-08 1304 No landscape plans on location. Informed Mark and a correction notice was left on location.
|
FIRE-Final Inspection | 3/3/2008 | 3/3/2008 | 3/3/2008 | P | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
FIRE-Final Inspection | 2/3/2008 | 2/4/2008 | 2/4/2008 | A | FAIL |
Troy Cobbley
|
|
|
The exit discharge lighting needs to be provided as per the originally approved plans. Also the gate through the fence needs to meet the requirments of chapter 10 access controlled egress doors since it has a magnet/security system partially installed.
|
FIRE-Final Inspection | 2/3/2008 | 2/4/2008 | 2/3/2008 | A | CANC |
Troy Cobbley
|
|
|
Ready after 9:00 am Phone #: ###-#### Internet Inspection Request from: Mark Bowen Inspection cancelled from web by: Mark Bowen
|
BLD-Framing/Rough-in | 1/24/2008 | 1/25/2008 | 1/25/2008 | A | PASS |
Tom Arcoraci
|
|
|
Mark Bowen ###-####
|
BLD-Concrete | 1/8/2008 | 1/8/2008 | 1/8/2008 | P | PASS |
Tom Arcoraci
|
|
|
Interior concrete slab for bathroom floor. Phone #: ###-#### Internet Inspection Request from: Mark Bowen
|
(F) Reprint permit | | | 1/3/2008 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/3/2008 | | DONE |
|
|
|
picked up and paid for plan mod
|
Plan assigned to (JCM) | 11/14/2007 | 11/14/2007 | 1/2/2008 | | PASS |
John Menard
|
|
|
1/2/2008 13:44:07 JCM - activity updated through activity BLDA022 from case BLD07-02328.
|
Routing - PLAN CHECK | 12/10/2007 | | 1/2/2008 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/2/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/2/2008 | | DONE |
|
|
|
|
Telephone call | | | 1/2/2008 | | DONE |
|
|
|
t/c w dana kaufman at ###-#### - permit ready and fees given
|
Override - Parcel Holds | | | 1/2/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 1/2/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/21/2007 | | |
|
|
|
Received two copies of response letter and pages EN.0, A1.1, A2.1, A3.1, MC1.0, MC1.1, M1.0, M2.0; taken to John Menard
|
Routing - FIRE | 12/5/2007 | | 12/10/2007 | | PASS |
|
|
|
Attached updated review comments to plans.
|
1st review completed | | | 12/10/2007 | | FAIL |
|
|
|
Failed plan check.
|
Routing - PLAN CHECK | 11/15/2007 | | 12/5/2007 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 12/5/2007 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PUBLIC WORKS | 12/5/2007 | | 12/5/2007 | | PASS |
|
|
|
|
Plan Modification Accepted | | | 11/14/2007 | | |
|
|
|
plan modification expected for bld07-02328 for the redisign of adding interior partitions to create 8 x 10 office, 8 x 10 supply room & 8 x 10 bathroom on sheets A2.1 shower detail. routed to John Menard
|
BLD-Conference | 10/9/2007 | 10/11/2007 | 10/11/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/9/2007 at 5:27:56 PM. Contact: ###-####. needs to resubmit for bath room addition
|
BLD-Footing | 10/9/2007 | 10/10/2007 | 10/10/2007 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/9/2007 at 12:36:19 PM. Contact: ###-####.
|
(F) Reprint permit | | | 9/27/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/26/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/20/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/20/2007 | | DONE |
|
|
|
t/c w dana kauffman at ###-#### - permit ready and fees given - also need ACHD receipt
|
Permit Ready to Issue | | | 9/20/2007 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 8/30/2007 | 8/30/2007 | 9/19/2007 | | PASS |
|
|
|
9/19/2007 16:20:58 JCM - activity updated through activity BLDA022 from case BLD07-02328.
|
Routing - FIRE | 9/15/2007 | | 9/19/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
1st review completed | | | 9/19/2007 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/19/2007 | | 9/19/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/12/2007 | | 9/15/2007 | | PASS |
|
|
|
John M.
|
Plan Reviewer's activity | | | 9/15/2007 | | PASS |
|
|
|
Plans approved with red lined notes.
|
Routing - PLANNING | 9/11/2007 | | 9/12/2007 | | PASS |
|
|
|
Approved per DRH07-00377.
|
Routing - PLUMBING | 9/4/2007 | | 9/11/2007 | | PASS |
|
|
|
no plumbing
|
Plan resubmittals received | | | 9/11/2007 | | DONE |
|
|
|
received (2) page letter from insight arch--letter taken to John Menard
|
Routing - Erosion and Sediment | 8/31/2007 | | 9/4/2007 | | PASS |
|
|
|
ESC waiver request approved with attached conditions.
|
Routing - PUBLIC WORKS | 8/30/2007 | | 8/31/2007 | | PASS |
|
|
|
|
Routing PW Drainage | 8/30/2007 | | 8/31/2007 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | | | 8/31/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 8/31/2007 | | 8/31/2007 | | PASS |
|
|
|
|
Routing PW Solid Waste | | | 8/31/2007 | | PASS |
|
|
|
Addition of green house to existing facility.
|
Routing - PLANNING Land Div | 8/30/2007 | | 8/30/2007 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/30/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/30/2007 | | DONE |
|
|
|
|
Application received | | | 8/27/2007 | | |
|
|
|
|