Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-02331
StatusFinaled
Name GREG CONTOS LLC
Site Address 208 W JEFFERSON ST
Project NameCONTOS OFFICE
Customer Number 
ePlanReviewNo
Description
THE OWNER IS NOT PROVIDING A CONTRACTOR REGISTRATION NUMBER BECAUSE I AM EXEMPT PER IDAHO STATE CODE 54-5205. (CONTOS OFFICE - PHASE II BLDG) To convert a 1,324 sq.ft. one story dwelling for office use. There is also a 440 sq. ft. mechanical service basement, all per approved plans and DRH06-00482. Parking lot paved under previous permit BLD07-00222. Work includes select interior demolition; to upgrade structural integrity of roof & floor systems per engineering and plans; remodel of existing restroom and surrounding walls to create a fully accessible unisex facility; install accessible breakroom sink/counter in break area and an accessible drinking fountain; to construct a new ramp and landings from parking lot to provide an accessible route to the area of primary function, to include handrails, guards, accessible doors, hardware, restroom & drinking fountain; to upgrade electrical, mechanical & plumbing. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD9/22/20089/22/20083/18/2009 DONE
DetailsPatricia Smith
Second Notice has not been responded to.
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 6/10/20088/11/2008 DONE
BLD-Final6/9/20086/10/20086/10/2008PPASS
DetailsDave Hannah
Greg Phone #: ###-#### ok for perm occ
Permanent Occupancy  6/10/2008  
BLD-Final6/5/20086/5/20086/6/2008PPART
DetailsDave Hannah
Greg Phone #: ###-#### ok for temp but needs to fix ada restroom
FIRE-Final Inspection6/4/20086/5/20086/5/2008APASS
DetailsForrest France
Life safety inspection completed acceptable, noted security chain at the Jefferson street side entrance door to be removed prior to structural final as agreed.
CHANGE STATUS TO (ISS)  5/29/2008 DONE
Changed back to issue as wrong key was hit by mistake ///dld
Code Occupancy Approval  5/29/2008 PASS
DetailsWm. Michael Meloy
Compliance met.
BLD-Framing/Rough-in4/15/20084/16/20084/16/2008APASS
DetailsDave Hannah
greg - please call 1/2 hr prior to inspection Phone #: ###-####
BLD-Conference2/27/20082/28/20082/28/2008APASS
DetailsDave Hannah
greg Phone #: ###-#### Note: please call him approx 1/2 hr prior to conference
Issue PAID IN FULL permit  1/9/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/14/2007 PASS
Print Occupancy Form  12/14/2007 DONE
Telephone call  12/14/2007 DONE
t/c w brad marczuk at ###-#### - permit ready and fees given - also need rce# and ACHD receipt
Permit Ready to Issue  12/14/2007 DONE
Plan assigned to (DRS)9/18/2007 12/14/2007 PASS
12/14/2007 07:01:30 DRS - activity updated through activity BLDA022 from case BLD07-02331.
Routing - PLAN CHECK11/1/2007 12/14/2007 PASS
New Sheet 'S1" with dimensioned layout for concrete pads and columns provided and inserted into plans. Plans to permit desk to issue.
Plan resubmittals received  12/13/2007  
received response letter and two copies of page S1; taken to Dan Stuart
Telephone call  12/10/2007 DONE
Call to Eric wolfe concerning dimensioning of plans showing placement requirements of footings, columns, beams etc. for correct layout. Said he scaled plans submitted by architect.
Telephone call  12/10/2007 DONE
Called Brad Marczuk concerning dimensioning of plans. Left voice message of question and ask him to return my call.
Plan resubmittals received  12/6/2007  
Received response letter three copies of structural calculations and pages G1.1 (cover sheet), G1.1 (exiting & code), L-1, SP-1, A1, A3, A5, S0, S1, S2; taken to Dan S.
1st review completed  11/2/2007 FAIL
Routing - FIRE11/1/2007 11/2/2007 PASS
Attached IFC review comments to plans.
Routing PW Solid Waste  11/1/2007 PASS
was passed on 9-21-07 by solid waste. computer sign off was skipped; lw
Routing - PLANNING10/31/2007 11/1/2007 PASS
Sarah Schafer DRH06-00482 Approved per the DR.
Routing - PLAN CHECK9/25/2007 10/31/2007 FAIL
Resubmittals required. Plan review e-mailed to architect. plans routed to fire code analyst for review.
Plan resubmittals requested  10/31/2007 DONE
Architect e-mailed copy of plan review.
Routing - Erosion and Sediment9/24/2007 9/25/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS9/18/2007 9/24/2007 PASS
Routing PW Drainage9/19/2007 9/21/2007 PASS
Routing PW Street Lights9/22/2007 9/21/2007 PASS
Routing PW Sewer Rating9/22/2007 9/21/2007 PASS
Pending Assignment by MYS8/29/2007 9/18/2007 DONE
9/18/2007 15:56:13 MYS - activity updated through activity BLDA168 from case BLD07-02331.
Plans ACCEPTED BY PLAN TECH  8/29/2007  
Recd Pcfee & Taken To Pln CK  8/29/2007  
Application received  8/27/2007