Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-02347
StatusFinaled
Name ST LUKES REGIONAL MEDICAL CENTER LT
Site Address 300 E JEFFERSON ST
Project NameST LUKES MOB - BASEMENT
Customer Number 
ePlanReviewNo
Description
(JMOP Idaho Cardiology Associates Basement Floor) This building is fully sprinklered for allowable story increase and to nullify rated corridor requirements, per the 1991 UBC. To perform select interior demolition of the 7,560 sq. ft. basement (ground floor) to include new ventilation openings in the north side concrete wall for new mechanical equipment; to build out the 6,330 sq. ft. interior basement area with new interior walls to create an accessible egress route to all portions of the remodeled patient area check-in, preparation, testing, treatment & support areas; to modify electrical, mechanical, plumbing, sprinkler and alarm systems; add a suspended ceiling grid system, interior wall & floor finishes and millwork. Provide accessibility at portions of two check-out stations, 4-restrooms and drinking fountain, all per approved plans, red-line notes thereon and all attached plan review comments / conditions of all reviewing agencies. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD9/22/20089/22/200810/23/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 8/7/20089/22/2008 DONE
Permanent Occupancy UNPAID FEE  8/7/2008 DONE
BLD-Final4/16/20084/17/20084/17/2008APASS
DetailsDave Hannah
jay Phone #: ###-#### ok for perm occ
FIRE-Final Inspection4/8/20084/9/20084/9/2008APASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection4/2/20084/3/20084/3/2008AFAIL
DetailsForrest France
During life safety inspection notice new card access was being installed. Contractor will get with fire alarm company so the connection can be tested to the fire alarm and life safety can be finaled.KR
BLD-Final4/2/20084/3/20084/3/2008PFAIL
DetailsDave Hannah
jay Phone #: ###-####
BLD-Final4/2/20084/2/20084/2/2008PNR
DetailsDave Hannah
jay Phone #: ###-####
BLD-Wall cover1/24/20081/25/20081/25/2008APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/24/2008 at 12:01:00 PM. Contact: ###-####. ceiling grid in basement ok to cover after other trades ok
BLD-Framing/Rough-in11/14/200711/15/200711/15/2007APART
DetailsDave Hannah
jay Phone #: ###-#### ok to cover walls first phase
Issue & PRINT to be Invoiced  10/12/2007  
Routing - PLAN CHECK10/4/2007 10/8/2007 PASS
Approved as noted on and all attached plan review conditions / comments of all reviewing agencies. Plans to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  10/8/2007 PASS
Print Pending Permit.LaserJet4  10/8/2007  
Print Pending Permit.LaserJet4  10/8/2007  
Print Pending Permit.LaserJet4  10/8/2007  
Case Summary (BLD)  10/8/2007  
Print Pending Permit.LaserJet4  10/8/2007  
Case Summary (BLD)  10/8/2007  
Print Occupancy Form  10/8/2007 DONE
Telephone call  10/8/2007 DONE
left vm for dana kauffman at ###-#### - permit ready and fees given - also need rp name
Permit Ready to Issue  10/8/2007 DONE
Plan assigned to (DRS)9/14/2007 10/8/2007 PASS
10/8/2007 06:45:16 DRS - activity updated through activity BLDA022 from case BLD07-02347.
Routing - PLANNING10/3/2007 10/4/2007 PASS
Routing - PLAN CHECK9/26/2007 10/3/2007 PEND
Resubmittal sheets inserted into plans. Plan review modified. Plans routed back to Planning for re-review.
Plan resubmittals received  10/1/2007 DONE
received 1 comments,and 2 copys of sheets AS-1,A2.0,A4.1,E2.0 taken to Dan S.
Routing - PUBLIC WORKS9/26/2007 9/26/2007 PASS
1st review completed  9/25/2007 FAIL
Routing - PLAN CHECK9/25/2007 9/25/2007 PEND
Routing back to PW for sewer fee reassessments for additional floor sink.
Routing - FIRE9/21/2007 9/25/2007 PASS
Attached IFC Review comments to plans.
Plan resubmittals received  9/24/2007  
received (2) copies ( 2) pages each from insight arch. & "2" sets of plans AO.1, A2.O, A4.O, A4.1, A5.O, ID-1.O, ID-1.1, PO.O, PO.1, P1.O, P2.O, P2.1, MO.O, M1.O, M2.O, M2.1M3.O, E2.O, E5.O, E6.1--plans taken to Dan Stuart
Routing - PLAN CHECK9/18/2007 9/21/2007 FAIL
Resubmittals required. Report to Dana Kaufman for resubmittals.
Routing - PLANNING9/19/2007 9/20/2007 FAIL
Matthew Halitsky (CZC07-00218).

Does not meet the conditions of the zoning certificate. Letter sent to applicant 9/20/2007.
Routing - PLUMBING9/18/2007 9/19/2007 PASS
no med gas. per plans and 2003 upc
Plan resubmittals requested  9/18/2007 DONE
Copy of review to Dana Kaufman to respond to.
Routing - Erosion and Sediment9/17/2007 9/18/2007 PASS
ESC waiver request approved with attached conditions.
Routing PW Sewer Rating9/17/2007 9/17/2007 PASS
Routing - PUBLIC WORKS9/14/2007 9/17/2007 PASS
Pending Assignment by MYS8/30/2007 9/14/2007 DONE
9/14/2007 12:33:32 MYS - activity updated through activity BLDA168 from case BLD07-02347.
Plans ACCEPTED BY PLAN TECH  8/30/2007  
Recd Pcfee & Taken To Pln CK  8/30/2007  
Application received  8/28/2007