Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD07-02354
StatusFinaled
Name SAUCERMAN CONSTRUCTION
Site Address 9272 PIERCE PARK RD
Project NamePIERCE PARK HORSE ARENA
Customer Number 
ePlanReviewNo
Description
Pierce Park Horse Arena - To construct a new 15,000 square foot, one story, pre-engineered metal building and related site improvements. This building will be used as a horse riding arena and will contain a large riding arena along with restrooms, utility room and a horse washing area. This building will be fire sprinkled with a dry system with a 50,000 gallon onsite water storage tank. The arena panels are to be arranged in a manner that will not block the required egress paths from the building. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval1/14/20101/14/20101/14/2010 DONE
DetailsTiffany Lowery
PubWorks Occupancy Approval1/14/20101/14/20101/14/2010 DONE
DetailsTiffany Lowery
Second Notice BLD8/11/20088/11/20089/4/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 7/23/20088/11/2008 DONE
BLD-Final7/21/20087/23/20087/23/2008APASS
DetailsDave Hannah
Please call when on your way out. Thanks! Phone #: ###-#### Internet Inspection Request from: Greg Hayes
Permanent Occupancy UNPAID FEE  7/23/2008 DONE
DetailsBarbara Stitt
FIRE-Final Inspection7/21/20087/22/20087/22/2008APASS
DetailsTroy Cobbley
Life safety passed. Structural inspector to please verify that the "Maximum Occupant Load" signs have been placed at the exits.
Plan assigned to (JCM)6/16/20086/16/20086/18/2008 PASS
DetailsJohn Menard
6/18/2008 07:58:24 JCM - activity updated through activity BLDA022 from case BLD07-02354.
Routing - PLAN CHECK6/18/2008 6/18/2008 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  6/18/2008 DONE
DetailsJohn Menard
Telephone call  6/18/2008 DONE
DetailsTisha Gallop
Called Marc Otto (arch. rep) and told him modified plan sheet approved and need to take to on site. No fees.
CHANGE STATUS TO (ISS)  6/18/2008 DONE
DetailsTisha Gallop
approved modified sheet
Routing - FIRE6/16/2008 6/17/2008 PASS
DetailsSam Rogers
Approved resubmitted plans showing modified piping and alarm monitoring details for the fire water tank; revised design provides limited domestic use, with a "dedicated" reserve for the required fire flow volume. Plan sheet to be re-issued for inspection purposes.
Routing - PLAN CHECK6/16/2008 6/16/2008 PASS
DetailsJohn Menard
Fire water storage tank - No building review required. JCM
Additional plans submitted  6/16/2008  
received modified, fire, tank, piping diagram & letter of transmittal from Patrick McKeegan==plans taken to John Menard
Code Occupancy Approval6/10/20086/10/20086/10/2008PPASS
DetailsMichael Garner
site inspection complete - work completed according to approved plans and permits - PASS
Additional plans submitted  6/4/2008 PASS
Received revised water tank piping sketch (81/2"x11") dated 5-29-08 submitted by Patick McKeegan, showing a high level domestic water discharge pipe, at 12.89' elevation, thereby reserving the lower 45,000 gallon portion for fire use only. Plans also specify fire alarm supervisory monitoring of: 1) water level at 12" below the domestic discharge outlet, 2) tank water temperature set at 40F, and 3) valve tamper on tank discharge PIV. No fire alarm permit exists at the current time. Doc attached.
BLD-Wall cover5/7/20085/7/20085/7/2008PPASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Shane Treasure
interior rooms ok
BLD-Framing/Rough-in5/1/20085/1/20085/1/2008PPASS
DetailsTony Young
Framing on interior rooms Phone #: ###-#### Internet Inspection Request from: Shane Treasure
BLD-Framing/Rough-in4/30/20084/30/20085/1/2008PCANC
DetailsTony Young
Framing on interior rooms Phone #: ###-#### Internet Inspection Request from: Shane Treasure
BLD-Framing/Rough-in4/30/20085/1/20085/1/2008ACANC
DetailsTony Young
Framing on interior rooms Phone #: ###-#### Internet Inspection Request from: Shane Treasure
BLD-Footing4/17/20084/18/20084/18/2008APART
DetailsTony Young
Good afternoon, the requested inspection is for the Water Tank Footings. Please call with any questions - ###-####. Thanks! Phone #: ###-#### Internet Inspection Request from: Greg Hayes
ok pendig S. I. REPORT
PubWorks Subgrade Approval4/16/20084/16/20084/16/2008 DONE
DetailsTerry Records
Geotech has approved the footing subgrade for the watertank
BLD-Other4/7/20084/7/20084/7/2008PCANC
DetailsTony Young
This inspection is for the plumbing at the water tank. We have roughed in the two existing 2" water lines to the new tank. Phone #: ###-#### Internet Inspection Request from: Greg Hayes
already done
BLD-Other4/7/20084/7/20084/7/2008PCANC
DetailsTony Young
This inspection is for the plumbing at the water tank. We have roughed in the two existing 2" water lines to the new tank. Phone #: ###-#### Internet Inspection Request from: Greg Hayes Inspection cancelled from web by: Greg Hayes
BLD-Other4/7/20084/7/20084/7/2008PCANC
DetailsTony Young
This inspection is for the plumbing at the water tank. We have roughed in the two existing 2" water lines to the new tank. Phone #: ###-#### Internet Inspection Request from: Greg Hayes Inspection cancelled from web by: Greg Hayes
BLD-Other4/7/20084/7/20084/7/2008PCANC
DetailsTony Young
This inspection is for the plumbing at the water tank. We have roughed in the two existing 2" water lines to the new tank. Phone #: ###-#### Internet Inspection Request from: Greg Hayes Inspection cancelled from web by: Greg Hayes
BLD-Other4/7/20084/7/20084/7/2008PCANC
DetailsTony Young
This inspection is for the plumbing at the water tank. We have roughed in the two existing 2" water lines to the new tank. Phone #: ###-#### Internet Inspection Request from: Greg Hayes Inspection cancelled from web by: Greg Hayes
BLD-Other4/7/20084/7/20084/7/2008PCANC
DetailsTony Young
This inspection is for the plumbing at the water tank. We have roughed in the two existing 2" water lines to the new tank. Phone #: ###-#### Internet Inspection Request from: Greg Hayes Inspection cancelled from web by: Greg Hayes
BLD-Other4/7/20084/7/20084/7/2008PCANC
DetailsTony Young
This inspection is for the plumbing at the water tank. We have roughed in the two existing 2" water lines to the new tank. Phone #: ###-#### Internet Inspection Request from: Greg Hayes Inspection cancelled from web by: Greg Hayes
Routing - FIRE3/19/2008 3/25/2008 PASS
DetailsSam Rogers
Engineering evaluation of the new tank and existing well supply by J. L. O'Neal, P.F.E. was reviewed by D. Hanneman, Fire Marshal, and found acceptable as an approved alternative design for this specific temporary situation. Signed documents attached to this case and faxed back to architect.
Plan resubmittals received  3/19/2008  
Receveived letter from Patrick McKeegan (arch); taken to Sam Rogers
BLD-Foundation3/6/20083/6/20083/6/2008PPASS
DetailsTony Young
Chuck Brett to pour around 2:30 pm. Thanks Shane Treasure. Phone #: ###-#### Internet Inspection Request from: Shane Treasure
end wall and last cross tie
BLD-Foundation3/5/20083/5/20083/5/2008PPASS
DetailsTony Young
Chuck Brett to pour concrete at 1PM. If you have a delay please call Shane Treasure at ###-####. Thank you. Phone #: ###-#### Internet Inspection Request from: Shane Treasure
north end wall and cross over tie ok
BLD-Footing2/28/20082/29/20082/29/2008PPART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Shane Treasure
cross tie
BLD-Footing2/28/20082/28/20082/28/2008PPART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Shane Treasureon cross wip over ftg
wip
BLD-Footing2/27/20082/27/20082/28/2008PPART
DetailsMike Jordan
Chuck Brett to place concrete at 1 PM. Phone #: ###-#### Internet Inspection Request from: Shane Treasure
cross tie ok,, pend S. I report
BLD-Foundation2/21/20082/22/20082/22/2008PPART
DetailsDave Hannah
Requested by Chuck Brett(West Reginal) Phone #: ###-#### Internet Inspection Request from: Shane Treasure second half ok to pour
BLD-Footing2/19/20082/19/20082/19/2008APART
DetailsTony Young
Sub is pouring at 9AM. Thanks Shane Treasure
Phone #: ###-#### Internet Inspection Request from: Shane Treasure
ok as noted on plans,, also pending special inspection report
Telephone call  2/13/2008 DONE
telcon from Gregg Hayes, Proj Mgr with Saucerman Const. ###-#### with questions regarding fire tank submittal. I explained tank design and installation needs to meet NFPA 22 and water supply (an existing well pump) needs to meet NFPA 20 design aspects at least in principle including verification of adequacy of aquifer capacity. Tank and associated piping design plans (relative to NFPA 20 and 22) need to be stamped by a State licensed engineer qualified in fire protection design. I recommended he check with State Fire Marshal regarding State requirements for Fire Protection Contractors to see if it pertains to fire tank and associated fire protection piping installation work.
BLD-Foundation1/14/20081/15/20081/15/2008APART
DetailsTony Young
mud here at 1-chuck Phone #: ###-####
as noted on plans
BLD-Footing1/14/20081/14/20081/14/2008PCANC
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: Shane Treasure
BLD-Footing1/13/20081/14/20081/14/2008ANR
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Shane Treasure
re-sched for early pm
BLD-Footing1/11/20081/14/20081/11/2008ACANC
DetailsTony Young
We have concrete ordered for 11:00 am. Please inspect before pour. Thanks Chuck Brett. Phone #: ###-#### Internet Inspection Request from: Shane Treasure Inspection cancelled from web by: Shane Treasure
(F) Reprint permit  12/6/2007  
Issue PAID IN FULL permit  12/5/2007 DONE
Print Occupancy Form  12/3/2007  
Telephone call  12/3/2007 DONE
left vm for john reseigh at ###-#### - permit ready and fees given - also need gc name, rce#, rp name, and ACHD receipt
Permit Ready to Issue  12/3/2007 DONE
Routing - PLANNING11/29/2007 11/30/2007 PASS
DetailsSusan Riggs
Routing - PLAN CHECK11/30/2007 11/30/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/30/2007 DONE
Plan assigned to (JCM)9/4/2007 11/30/2007 PASS
11/30/2007 15:22:04 JCM - activity updated through activity BLDA022 from case BLD07-02354.
Routing - PLANNING11/8/2007 11/29/2007 PASS
Routing - PUBLIC WORKS11/27/2007 11/27/2007 PASS
Routing - PUBLIC WORKS11/21/2007 11/21/2007 FAIL
Routing PW Drainage11/21/2007 11/21/2007 PASS
Plan resubmittals received  11/8/2007 DONE
received 1 transmittal, and 3 copies of sheets C2.03,C2.05,C3.02 resubmittals inserted into plans by Chris Hobbs from W & H Pacific and returned to John M. ///dld
Routing - PLAN CHECK10/30/2007 11/8/2007  
Routing PW Sewer Rating11/2/2007 11/2/2007 PASS
Plan resubmittals received  10/30/2007  
Received two copies of pages E1.1, E1.2, E2.1, E2.2; inserted by plan tech and taken plans to John Menard
Routing - PLUMBING10/26/2007 10/30/2007 PASS
provide cross sectional equivalent on vent termination. water at horse room shall have backflow protection.
Plan resubmittals received  10/29/2007 DONE
Received signed upgrade agreement letter. Awaiting resubmittal for FD access surfacing requirements.
Routing - FIRE10/29/2007 10/29/2007 PASS
Attached updated fire comments to plans.
Routing - FIRE10/24/2007 10/26/2007 FAIL
Faxed and emailed resubmittal items to architect.
Routing - PLANNING10/23/2007 10/24/2007 FAIL
Applicant has submitted a hillside permit which is currently being reviewed. A planning action will be determined by October 29th; however there is a 10 day appeal period after that. If all goes well I can sign off plans around November 8, 2007. Susan riggs
Routing - PLAN CHECK9/21/2007 10/23/2007 PASS
Plan Reviewer's activity  10/23/2007 PASS
Reviewed and approved structural and nonstructural resubmitted revisions. JCM
Routing - PUBLIC WORKS10/23/2007 10/23/2007 FAIL
Routing PW Grading-Hillside10/23/2007 10/23/2007 FAIL
Grading for water tank on hillside has not had the Hillside and Foothills Development Application approved. It was only submitted on 10/19/07
Routing PW Sewer Rating10/23/2007 10/23/2007 FAIL
Wet Line Waiver must be received before issuing building permit. Contact Connie Baumgartner at ###-####
Plan resubmittals received  10/22/2007  
received 2 copies of response letter (2) pages each, hillside & foothills app. (6) pages each, "2" pages of response comment number 4, "1" page of response letter from civil eng. "2" sets of "5" pages of fire plan review response letter, 1 page of response letter for plumbing plan review, "2" sets from mountain view eng inc (11) pages each, "4" sets of all state tank manufacturing calcs (21) pages each, plus "2" sets of plans for water tank (7) sheets each, -----"2" sheets each of A1.1, A1.2, & A1.3--& "2" sets of plans (civil) C1.O1, C2.O1, C2.O2, C2.O3, C2.O4, C2.O5, C2.O6, C3.O1, C3.O2, C4.O1, L1.1, & L1.2--plans taken back to John Menard
1st review completed  9/25/2007 FAIL
Plan resubmittals requested  9/25/2007 DONE
E-mailed the architect a copy of the plan review requesting revisions. JCM
Plan Reviewer's activity  9/25/2007 FAIL
Plan resubmittals requested  9/21/2007 DONE
Faxed the architect a copy of the structural review requesting revisions.
Routing Off Site - STRUCTURAL9/4/2007 9/21/2007 FAIL
REceived comment list from the consulting structural engineer requesting revisions. JCM
Routing - FIRE9/18/2007 9/21/2007 FAIL
Emailed resubmittal items to Owner and architect. Faxed review comments to architect. Attached review comments to plans. *Fire department upgrade aggreement required*
Routing - PLANNING  9/18/2007 FAIL
DRH07-00291 Josh Wilson-- DR app withdrawn-- no review
CUP07-00085 Susan Riggs Plans fail to meet condition #2 which requires a hillside and foothill development permit. Terry Records has called the engineer.
Routing - PLUMBING9/11/2007 9/12/2007 FAIL
provide drawing of interior waste, vents domestic water piping and
sizing.
Routing - Erosion and Sediment9/10/2007 9/11/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS9/4/2007 9/10/2007 FAIL
Routing PW Sewer Rating9/10/2007 9/10/2007 FAIL
Signed Wet Line Waiver required.
Routing PW Solid Waste  9/10/2007 PASS
Routing PW Drainage  9/7/2007 FAIL
Grading and drainage for horse arena appears to be OK but there is no drainage information or geotech report for the water tank or access road.
Routing PW Grading-Hillside  9/7/2007 FAIL
Grading and drainage for horse arena appears to be OK but there is no drainage information or geotech report for the water tank or access road.
Routing PW Sewer Design9/4/2007 9/5/2007 PASS
Routing PW Street Lights  9/5/2007 PASS
Telephone call  9/4/2007 DONE
called Action Couriers for pick up
Routing - PLANNING Land Div8/31/2007 9/4/2007 PASS
parcel is larger than 5 acres.
Pending Assignment by MYS8/29/2007 9/4/2007 DONE
9/4/2007 08:50:51 JCM - activity updated through activity BLDA166 from case BLD07-02354.
Plan routing begun/NEW & ADDTN  8/31/2007  
Plans ACCEPTED BY PLAN TECH  8/30/2007  
Recd Pcfee & Taken To Pln CK  8/29/2007 DONE
Application received  8/29/2007  
Routing PW Grading-Hillside11/21/2007   PASS
Approved as Category 1 by cfh07-00035