Third Notice BLD | 9/22/2008 | 9/22/2008 | 12/18/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Case Summary (BLD) | | | 11/17/2008 | | |
|
|
|
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/21/2008 | 8/11/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/21/2008 | | DONE |
Cathy Weisshaupt
|
|
|
|
BLD-Final | 4/21/2008 | 4/21/2008 | 4/21/2008 | P | PASS |
Dave Hannah
|
|
|
brandon Phone #: ###-#### ok for perm occ
|
BLD-Final | 12/27/2007 | 12/28/2007 | 12/31/2007 | P | PART |
Dave Hannah
|
|
|
rick Phone #: ###-#### ok for temp occ c/n on site
|
FIRE-Final Inspection | 12/27/2007 | 12/28/2007 | 12/28/2007 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed, noted manual flush bolts at the inactive door leaf from the conference room must be removed or provide automatic style prior to structural final.
|
Temporary Occupancy | 12/28/2007 | 3/27/2008 | 12/28/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/26/2007 | 12/27/2007 | 12/27/2007 | A | FAIL |
Forrest France
|
|
|
Need the project related fire alarm and sprinkler permits finaled prior to BLD life safety approval, noted items from the previous visit including hardware at the east exit door are corrected, EM lights and exit signage tested okay, job is not in condition for life safety final at this time.
|
BLD-Framing/Rough-in | 12/20/2007 | 12/21/2007 | 12/21/2007 | A | PART |
Dave Hannah
|
|
|
rick Phone #: ###-#### last of the ceiling grid ok to cover
|
BLD-Framing/Rough-in | 12/14/2007 | 12/17/2007 | 12/19/2007 | A | PART |
Dave Hannah
|
|
|
Rick; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ceiling grid second section ok to cover walls and soffit last section ok to cover
|
BLD-Framing/Rough-in | 11/15/2007 | 11/16/2007 | 11/16/2007 | A | PASS |
Dave Hannah
|
|
|
rick Phone #: ###-#### ok to cover walls
|
BLD-Framing/Rough-in | 11/13/2007 | 11/13/2007 | 11/14/2007 | P | PART |
Dave Hannah
|
|
|
rick - 1st floor Phone #: ###-#### ok to cover walls
|
Issue PAID IN FULL permit | | | 10/2/2007 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 8/30/2007 | 8/30/2007 | 9/24/2007 | | PASS |
|
|
|
9/24/2007 10:06:35 RMH - activity updated through activity BLDA022 from case BLD07-02356.
|
Case Summary (BLD) | | | 9/24/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/24/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/24/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/21/2007 | | 9/24/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/24/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/24/2007 | | DONE |
|
|
|
left vm for craig slocum at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 9/24/2007 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/19/2007 | | |
|
|
|
Received 3 copies of sheets A2.2 and S1.1 and taken Ron Hill///9/19/07 @ 1:29am BAS
|
Routing - PLAN CHECK | 9/6/2007 | | 9/13/2007 | | FAIL |
|
|
|
Resubmittals failed called architect, needs two hour fire assembly for floor infill. 9/13/07
|
Plan resubmittals received | | | 9/12/2007 | | |
|
|
|
Received transmittal, copy of Boise City Plan Review Report, three copies of Structural Calculation, and three copies of pages S1.1, A2.1, A2.3, A9.4; taken to Ron Hill
|
Routing - FIRE | 9/4/2007 | | 9/6/2007 | | PASS |
|
|
|
Attached IFC review to plans.
|
1st review completed | | | 9/6/2007 | | FAIL |
|
|
|
|
Case Summary (BLD) | | | 9/4/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/1/2007 | | 9/4/2007 | | FAIL |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/30/2007 | | |
|
|
|
|
Application received | | | 8/29/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/29/2007 | | DONE |
|
|
|
|