CHANGE STATUS TO (FNL) | | | 3/9/2009 | | DONE |
Barbara Stitt
|
|
|
Letter of complaince issued 3-6-09 BAS
|
BLD-Final | 3/5/2009 | 3/6/2009 | 3/6/2009 | A | PART |
Tom Arcoraci
|
|
|
Daryl Phone #: ###-#### ok pending pz and pw
|
FIRE-Final Inspection | 3/5/2009 | 3/6/2009 | 3/6/2009 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
PubWorks Occupancy Approval | 3/6/2009 | 3/6/2009 | 3/6/2009 | | DONE |
Barbara Stitt
|
|
|
Per phone call from Dan Erskine this is approved by him effective 3-6-09 no card on site for him to sign///3-6-09 @ 11:00am BAS
|
Zoning Approval | 3/6/2009 | 3/6/2009 | 3/6/2009 | | DONE |
Josh Wilson
|
|
|
|
Inspection Record Card- Bld | | | 3/6/2009 | | DONE |
|
|
|
|
Letter of compliance | | | 3/6/2009 | | DONE |
Barbara Stitt
|
|
|
|
Override - People Holds | | | 3/6/2009 | | |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 2/27/2009 | 3/2/2009 | 3/2/2009 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with sams permission until the curb painting for the fire dept access has been done. It could not be done yet because the curbing needed to cure prior to painting. All other life safety items are ok.
|
Override - People Holds | | | 2/27/2009 | | |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 2/24/2009 | 2/25/2009 | 2/25/2009 | A | FAIL |
Troy Cobbley
|
|
|
See the correction notice left at the job site for items needing addressed.. Per a conversation with Scott the remote FDC and PIV arer not required. I measured the distance from the existing fire hydrant to the now wall mounted PIV and FDC and the distance is roughly 250'-0" which is ok with Scott.
|
Plan Reviewer's activity | | | 2/17/2009 | | DONE |
|
|
|
FD Road temporary access letter received.
|
PRINT Activities | | | 2/5/2009 | | DONE |
|
|
|
|
Meeting | | | 2/4/2009 | | DONE |
Mark Senteno
|
|
|
Met w/GC Darryl. Discussed his request to allow a TOC w/Fire Dept access unpaved until batch plant reopens at the end of February 2009. Roadway needs to be maintained to provide a driveable surface that will support vehicle weight up to 75,000 pounds. He is to submit letter to me for signature to document this commitment prior to Fire approval for TOC.
2/17/2009 - Received letter dated 2/12/2009 from Steve Christensen, owner of building, committing to provide and maintain a non-paved fire department roadway surface capable of supporting the required 75,000 lb load and to have the roadway paved and ready for "final" inspection by 3/15/2009. Acceptable to allow this condition for a TOC. Letter attached under Doc's. M. Senteno.
|
BLD-Final | 1/23/2009 | 1/23/2009 | 1/23/2009 | A | NR |
Jim Storey
|
|
|
need fire/pw/p&z/achd pending sign offs
|
BLD-Aging Inspection | 1/21/2009 | 1/21/2009 | 1/21/2009 | | PASS |
Jim Storey
|
|
|
finals by others in progress.
|
BLD-Energy code compliance | 10/30/2008 | 10/30/2008 | 10/30/2008 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 10/30/2008 | 10/30/2008 | 10/30/2008 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 8/27/2008 | 8/27/2008 | 8/27/2008 | | PART |
Jim Storey
|
|
|
need aproved plans.
|
CHANGE STATUS TO (ISS) | | | 7/30/2008 | | DONE |
Marsha Smylie
|
|
|
already issued previously- a plan mod
|
(F) Reprint permit | | | 7/30/2008 | | DONE |
Marsha Smylie
|
|
|
|
Telephone call | | | 7/28/2008 | | DONE |
|
|
|
t/c w eileen davidson at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/28/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/21/2008 | | 7/25/2008 | | |
John Menard
|
|
|
|
Plan assigned to (JCM) | 4/16/2008 | | 7/25/2008 | | PASS |
John Menard
|
|
|
7/25/2008 14:07:04 JCM - activity updated through activity BLDA022 from case BLD07-02372.
|
Plan resubmittals received | | | 7/25/2008 | | DONE |
John Menard
|
|
|
Received faxed energy envelope compliance from the architect. Inserted into plans. JCM
|
Routing - PLANNING | 7/25/2008 | | 7/25/2008 | | PASS |
Sarah Schafer
|
|
|
|
Routing - PLAN CHECK | 7/25/2008 | | 7/25/2008 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2008 | | DONE |
John Menard
|
|
|
|
Inspection Record Card- Bld | | | 7/25/2008 | | DONE |
Cathy Brown
|
|
|
|
Inspection Record Card- Bld | | | 7/25/2008 | | DONE |
Cathy Brown
|
|
|
|
Routing - FIRE | 7/17/2008 | | 7/21/2008 | | PASS |
Scott Arellano
|
|
|
Attached modified IFC comments to plans
|
Plan resubmittals requested | | | 7/17/2008 | | DONE |
|
|
|
E-mailed the architect a copy of the plans review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 4/18/2008 | | 4/25/2008 | | FAIL |
John Menard
|
|
|
Called action Courier for pick up 4-18-08 @ 3:10pm BAS - Received comment list from the consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 4/25/2008 | | DONE |
John Menard
|
|
|
Faxed the contractor a copy of the structural reveiw requesting revisions. JCM
|
Plan Modification Accepted | | | 4/17/2008 | | |
Marsha Smylie
|
|
|
plan modification excepted for bld07-02372 for the redesign of c m c to stick frame- metal and stucco exterior on sheets A-1, A-2, A-3. routed to John Menard.
|
BLD-Foundation | 3/28/2008 | 3/28/2008 | 3/28/2008 | P | PASS |
Jim Storey
|
|
|
daryl - wall Phone #: ###-####
|
BLD-Footing | 3/25/2008 | 3/26/2008 | 3/26/2008 | A | PASS |
Jim Storey
|
|
|
darrell Phone #: ###-####
|
(F) Reprint permit | | | 3/26/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/25/2008 | | DONE |
Darla L Downs
|
|
|
|
Ready Permit EXTENDED | | | 2/21/2008 | | |
|
|
|
|
Telephone call | | | 2/19/2008 | | DONE |
|
|
|
called Steve Christensen at ###-#### and told him permit is ready, fee and need ACHD & that the permit will expire & will apply for an extension
|
Routing - PLAN CHECK | 11/9/2007 | | 12/14/2007 | | |
|
|
|
|
Routing - PLUMBING | 12/14/2007 | | 12/14/2007 | | PASS |
|
|
|
grease and hazardous liquids interceptor shown on original submitted plans. interceptor detail shown on P0.2 but no interceptor or piping shown on resubmitted plans. did you delete this item from construction?
|
Routing - PLAN CHECK | 12/14/2007 | | 12/14/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/14/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/14/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/14/2007 | | DONE |
|
|
|
|
Telephone call | | | 12/14/2007 | | DONE |
|
|
|
called Steve ###-#### and told him permit is ready, fee and need ACHD
|
Permit Ready to Issue | | | 12/14/2007 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 9/4/2007 | | 12/14/2007 | | PASS |
|
|
|
12/14/2007 11:49:22 JCM - activity updated through activity BLDA022 from case BLD07-02372.
|
Plan resubmittals received | | | 12/13/2007 | | |
|
|
|
received 2 copies of sheets P1.0,C-1,C-2 inserted by Steve christensen Plans taken back to John M.
|
Routing - PLUMBING | 11/9/2007 | | 11/9/2007 | | FAIL |
|
|
|
Call architect and advised revised plans did not address requested revisions. GV
|
Plan resubmittals received | | | 11/8/2007 | | |
|
|
|
received 3 copies of sheet P1.0 inserted by Steven E Christsen and taken back to John M.
|
Routing - PLUMBING | 10/24/2007 | | 10/25/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 10/22/2007 | | 10/24/2007 | | PASS |
|
|
|
Attached revised IFC review comments to plans. Faxed revised IFC review comments to architect.
|
Routing - PLAN CHECK | 10/17/2007 | | 10/22/2007 | | |
|
|
|
|
Plan resubmittals received | | | 10/19/2007 | | |
|
|
|
Received 1 cover transmittal and 2 copies of sheets A1.0 inserted into plans by Steve Christensen and taken back to john Menard///10/19/07 @ 12:59pm BAS
|
Routing - FIRE | 10/12/2007 | | 10/17/2007 | | FAIL |
|
|
|
Faxed updated resubmittal items to architect. Attached updated review comments to plans.
|
Routing - PUBLIC WORKS | 10/10/2007 | | 10/12/2007 | | PASS |
|
|
|
|
Routing PW Drainage | 10/9/2007 | | 10/12/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 10/12/2007 | | 10/12/2007 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/9/2007 | | 10/10/2007 | | |
|
|
|
|
Plan resubmittals received | | | 10/10/2007 | | |
|
|
|
Received five copies of pages C-1, C-2, and three copies of drainage calculations; inserted by permit tech LEG and taken back to John Menard
|
Routing - PLAN CHECK | 9/20/2007 | | 10/9/2007 | | |
|
|
|
|
Plan Reviewer's activity | | | 10/9/2007 | | PASS |
|
|
|
Reviewed and approved structural revisions. JCM
|
Routing - FIRE | 10/9/2007 | | 10/9/2007 | | FAIL |
|
|
|
Faxed resubmittal items and updated review comments to architect.
|
Plan resubmittals received | | | 10/8/2007 | | DONE |
|
|
|
received 1 response to Scott Arellano , 1 united water sheet, 1 calc with ( 5 sheets) and 2 copys of sheets A-1.0,S2.1,S3.1 resubmittals inserted into plans by Eileen Davidson from Architecture Interior Design Landscape Planning and plans taken back to John M.
|
1st review completed | | | 9/20/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 9/15/2007 | | 9/20/2007 | | FAIL |
|
|
|
Faxed resubmittal items to architect. Attached IFC comments to plans.
|
Plan resubmittals requested | | | 9/19/2007 | | DONE |
|
|
|
Faxed the architect a copy of the structural review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 9/4/2007 | | 9/18/2007 | | FAIL |
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Plan Reviewer's activity | | | 9/15/2007 | | PASS |
|
|
|
Reviewed and approved with red lined notes and revised energy envelope calculation. JCM
|
Routing - PLAN CHECK | 9/13/2007 | | 9/15/2007 | | PASS |
|
|
|
John Menard
|
Routing - PLANNING | 9/11/2007 | | 9/13/2007 | | PASS |
|
|
|
Pass - approvals were in the County.
|
Routing - PLUMBING | 9/6/2007 | | 9/11/2007 | | FAIL |
|
|
|
vents fron sand and oil interceptor to vent seperate from sanitary sewer. provide location of septic tank and piping. sheet p1.0 indecates 2" C.W. to building, sheet c-2 shows 1" water service. if rpvb is to be used provide a floor drain at backflow location.
|
Routing - Erosion and Sediment | 9/5/2007 | | 9/6/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 9/4/2007 | | 9/5/2007 | | FAIL |
|
|
|
|
Routing PW Drainage | 9/4/2007 | | 9/5/2007 | | FAIL |
Brian Murphy
|
|
|
NOTES,PERC RATE, ROOF.
|
Routing PW Street Lights | 9/5/2007 | | 9/5/2007 | | PASS |
|
|
|
|
Routing PW Sewer Design | 9/5/2007 | | 9/5/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 9/5/2007 | | 9/5/2007 | | PASS |
|
|
|
|
Routing PW Solid Waste | 9/5/2007 | | 9/5/2007 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 9/4/2007 | | |
|
|
|
|
Routing - PLANNING Land Div | 9/4/2007 | | 9/4/2007 | | PASS |
|
|
|
King Industrial park sub
|
Plans ACCEPTED BY PLAN TECH | | | 9/4/2007 | | |
|
|
|
|
Pending Assignment by MYS | 8/30/2007 | | 9/4/2007 | | DONE |
|
|
|
9/4/2007 08:59:03 JCM - activity updated through activity BLDA166 from case BLD07-02372.
|
Telephone call | | | 9/4/2007 | | DONE |
|
|
|
called Action Couriers for pick up
|
Application received | | | 8/30/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/30/2007 | | |
|
|
|
|
Plan resubmittals received | | | | | |
John Menard
|
|
|
Received 2 copies of sheets A2.0 and A3.0 and inserted into plans then returned to John Menard's desk 7-24-08 @ 12:25pm BAS
|