BLD-Framing/Rough-in | 10/4/2007 | 10/4/2007 | 10/4/2007 | P | PART |
Jim Sly
|
|
|
dumitru Phone #: ###-#### Posts, beams, and joists appear OK.
|
BLD-Footing | 9/21/2007 | 9/24/2007 | 9/24/2007 | A | PASS |
Tom Arcoraci
|
|
|
###-#### Lance//note: they have eliminated the roof from the project
|
Routing Walk-In (BLD) | 9/21/2007 | 9/21/2007 | 9/21/2007 | A | PASS |
|
|
|
(PERMIT MODIFIED 9.21.07 REMOVING ROOF STRUCTURE FROM DECK)
|
Case Summary (BLD) | | | 9/21/2007 | | DONE |
|
|
|
|
Inspector's copy Bld permit | | | 9/21/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/21/2007 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/20/2007 | 9/20/2007 | 9/20/2007 | A | CANC |
|
|
|
Will return later with letter from original contractor to switch permit to owners name.
|
(F) Reprint permit | | | 9/20/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/20/2007 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 8/31/2007 | 8/31/2007 | 8/31/2007 | P | DONE |
|
|
|
8/31/2007 15:36:46 CTC - activity updated through activity BLDI252 from case BLD07-02386.
|
Routing Walk-In (BLD) | 8/31/2007 | 8/31/2007 | 8/31/2007 | P | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/31/2007 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/31/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/31/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/31/2007 | | DONE |
|
|
|
|
Application received | | | 8/31/2007 | | |
|
|
|
|