Permanent Occupancy | | | 5/3/2010 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Final Inspection | 3/26/2009 | 3/26/2009 | 3/26/2009 | A | PASS |
Forrest France
|
|
|
Fire life safety approved, see inspection comments 6/18.
|
BLD-Final | 6/26/2008 | 6/27/2008 | 6/27/2008 | P | PASS |
Mike Jordan
|
|
|
Zach Phone #: ###-####. All issues resolved. OK for perm occ.
|
BLD-Final | 6/18/2008 | 6/18/2008 | 6/19/2008 | P | FAIL |
Dave Hannah
|
|
|
Zach- call 30 min prior to going Phone #: ###-#### needs to fix draft stop and get shell finaled
|
FIRE-Final Inspection | 6/17/2008 | 6/18/2008 | 6/18/2008 | A | PASS |
Forrest France
|
|
|
Corrections verified for compliance, noted building plan modification accepted per revision dated 6/16, fire life safety finaled.
|
CHANGE STATUS TO (ISS) | | | 6/17/2008 | | DONE |
Barbara Stitt
|
|
|
Approved plan modification
|
(F) Reprint permit | | | 6/17/2008 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (JCM) | 6/16/2008 | | 6/17/2008 | | PASS |
John Menard
|
|
|
6/17/2008 09:43:22 JCM - activity updated through activity BLDA022 from case BLD07-02391.
|
Plan Reviewer's activity | | | 6/17/2008 | | DONE |
John Menard
|
|
|
Reviewed and approved plan modification to delete the 1,075 square foot tenant finish at the northwest end of the building. This area will be a future finish under a separate tenant improvement. JCM
|
Routing - PLAN CHECK | 6/16/2008 | | 6/17/2008 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2008 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 6/16/2008 | | |
John Menard
|
|
|
Plan modification accepted for BLD07-02391-not building out 1,102 sq ft of lease space on the southwest corner of the building. Submitted A2.0 and routed to John Menard///6-16-08 BAS
|
FIRE-Final Inspection | 6/9/2008 | 6/10/2008 | 6/10/2008 | A | PART |
Forrest France
|
|
|
The exit sign/EM light and PFE have been installed per correction notice, final pending plan modification for now unfinished portions of the building including the east HVAC duct detector which is not powered at this time.
|
FIRE-Final Inspection | 6/6/2008 | 6/6/2008 | 6/6/2008 | P | FAIL |
Troy Cobbley
|
|
|
Resubmit plans showing the scope of work changing or finish building the interior walls. Provide an emergency light/exit sign at the exit door to the finished tenant as per the plans. Provide a fire extinguisher in the hall as per the plans. Provide power to the south duct smoke detector so it can be tested. The north smoke detector tested ok.
|
FIRE-Final Inspection | 5/28/2008 | 5/28/2008 | 5/28/2008 | P | FAIL |
Troy Cobbley
|
|
|
The fire extinguishers had not been installed, no address was installed and no one was one site to test the duct smoke detectors. Basically no inspection was performed.
|
BLD-Framing/Rough-in | 4/17/2008 | 4/17/2008 | 4/17/2008 | P | PART |
Dave Hannah
|
|
|
derrick - ceiling grid Phone #: ###-#### ok to cover ceiling
|
BLD-Framing/Rough-in | 4/16/2008 | 4/16/2008 | 4/17/2008 | P | PART |
Dave Hannah
|
|
|
derrick - ceiling grid Phone #: ###-#### meeds mec defusers wired up ok to start
|
BLD-Framing/Rough-in | 3/10/2008 | 3/10/2008 | 3/10/2008 | P | PASS |
Dave Hannah
|
|
|
DERICK Phone #: ###-#### ok to insulate
|
BLD-Foundation | 12/24/2007 | 12/26/2007 | 12/26/2007 | A | CANC |
Dave Hannah
|
|
|
brian please call 1 hour brfore going out Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/19/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/5/2007 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 9/4/2007 | | 10/22/2007 | | PASS |
|
|
|
10/22/2007 11:59:09 JCM - activity updated through activity BLDA022 from case BLD07-02391.
|
Routing - PLAN CHECK | 10/22/2007 | | 10/22/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/22/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/22/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/22/2007 | | DONE |
|
|
|
left message w oscar for larry knopp at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 10/22/2007 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 9/5/2007 | | 10/19/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 9/5/2007 | | 10/19/2007 | | PASS |
|
|
|
|
Routing - FIRE | 9/28/2007 | | 10/3/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
Plan resubmittals received | | | 10/3/2007 | | DONE |
|
|
|
Received 1 response,and 2 copys of sheets A3.0,A4.0,A5.0,A6.0,A6.1 Inserted into plans by Oscer and returned to Fire///dld
|
1st review completed | | | 10/3/2007 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 9/28/2007 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 9/26/2007 | | 9/28/2007 | | FAIL |
|
|
|
John Menard
|
Routing - PLUMBING | | | 9/24/2007 | | PASS |
|
|
|
|
Routing PW Sewer Design | 9/11/2007 | | 9/17/2007 | | FAIL |
|
|
|
Public sewer proposed. Sanitary sewer plans need to be submitted to Public Works Dept. for approval.
|
Routing - PLANNING Land Div | | | 9/5/2007 | | PASS |
|
|
|
annexed 12/03
|
Application received | | | 9/4/2007 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/4/2007 | | |
|
|
|
|