Permit Information
Permit NumberBLD07-02401
StatusFinaled
Name SUNSET RIDGE CONSTRUCTION
Site Address 10096 W FAIRVIEW AVE Unit: 160
Project NameFairview Office Park Bldg #3
Customer Number 
ePlanReviewNo
Description
(ENTRUST OF IDAHO - Fairview Office Park- Bldg #3) This building is NOT fire sprinklered. To perform interior tenant improvement work within a 1,859 square foot building. The building shell was constructed under permit BLD04-01644. Work is to include interior nonbearing walls, one restroom accessible to the disabled, interior doors, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 12/9/200912/7/2009 DONE
Third Notice 11/14/200911/25/2009 DONE
faxed
Second Notice 10/31/200911/4/2009 DONE
First Notice 10/4/200910/21/2009 DONE
Permanent Occupancy  9/24/2009 DONE
BLD-Final9/1/20099/1/20099/1/2009PPASS
DetailsJim Sly
OK for Perm Occ.
FIRE-Final Inspection8/31/20099/1/20099/1/2009APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection8/28/20098/28/20098/28/2009PFAIL
DetailsTroy Cobbley
Provide the re-arranged main exit hardware and annual inspections for both of the fire extinguishers.
BLD-Final8/27/20098/28/20098/28/2009ANR
DetailsJim Sly
Larry please call 30 min before going out Phone #: ###-####
Need fire final
Telephone call  4/21/2009 DONE
DetailsBarbara Stitt
Spoke with Jon Galane @ ###-####-he informed me that they were going to be requesting an extension to the temp occupancy. He told me that they are waiting on ceiling grids-then HVAC and Electrical would be calling in for finals; Flooring will be late June early July. I asked him to write a letter to Jenifer Gilliland explaining the status of the project and requesting an extension. She would make a decision based on the information and inform him of her decision.
Temporary Occupancy UNPAID FEE  1/29/2009 DONE
DetailsBarbara Stitt
per Jenifer extend temp occupancy-see scanned documents
Second Notice BLD9/22/20089/22/200812/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
Temporary Occupancy10/22/20081/26/200910/28/2008 DONE
Temporary Occupancy was extended an addition 90 days because progress was made towards completion of outstanding items (a framing inspection occurred). New Expiration date is January 20, 2009. jlg.
BLD-Framing/Rough-in10/8/200810/9/200810/9/2008PPASS
DetailsJim Sly
larry Note: please call 1/2 hr prior to inspection Phone #: ###-####
First Notice 8/4/20089/22/2008 DONE
Temporary Occupancy8/4/20087/22/20087/22/2008 DONE
DetailsJenifer Gilliland
The original 90 day expiration date was July 24th, 2008. Temporary Occupancy is now extended to October 22, 2008 due to business difficulties cited by the owner. jlg.
Temporary Occupancy UNPAID FEE  4/25/2008 DONE
FIRE-Final Inspection4/22/20084/22/20084/22/2008PPART
DetailsTroy Cobbley
A temporary occupancy was given with mark sentennos permission for the use of the conference room. The other portions of this scope of work have not been completed. I notified the builder that the temp was only good for 90 days
BLD-Final4/22/20084/22/20084/22/2008PPART
DetailsJim Sly
larry Phone #: ###-####
OK for temp Occ......OK to use Classroom and continue to work on areas unfinished.
FIRE-Final Inspection4/7/20084/7/20084/7/2008PFAIL
DetailsTroy Cobbley
The construction was not complete. The contractor wanted a temporary occupancy for the classroom. I deferred him to dave hanniman for permission.
FIRE-Final Inspection4/4/20084/4/20084/4/2008PFAIL
DetailsTroy Cobbley
Three messages were left on the phone and a business card left on site but there was no access to the project. No inspection performed.
BLD-Conference11/30/200711/30/200711/30/2007PDONE
DetailsJim Sly
larry Note: please call 1/2 hr prior to conference Phone #: ###-####
Questions being answered by Architect
BLD-Framing/Rough-in10/26/200710/26/200710/26/2007PPASS
DetailsJim Sly
tony Phone #: ###-####
Issue PAID IN FULL permit  10/9/2007 DONE
Telephone call  10/5/2007 DONE
t/c w cindy king at ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  10/5/2007 DONE
Routing - PLAN CHECK10/1/2007 10/4/2007 PASS
Case Summary (BLD)  10/4/2007 DONE
Print Pending Permit.LaserJet4  10/4/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/4/2007 DONE
Print Occupancy Form  10/4/2007 DONE
Plan assigned to (TLW)9/18/2007 10/4/2007 DONE
Sent entire Plan review report to Cindy King then Routed to fire 9.27.07 TLW
Routing - FIRE9/27/2007 10/1/2007 PASS
Attached IFC review comments to plans.
1st review completed  10/1/2007 PASS
Routing - PLAN CHECK9/19/2007 9/27/2007 PASS
Passed with Red Lines. See Plan Review Report
Routing - PUBLIC WORKS9/18/2007 9/19/2007 PASS
Routing PW Sewer Rating9/19/2007 9/19/2007 PASS
Pending Assignment by MYS9/5/2007 9/18/2007 DONE
9/18/2007 16:17:42 MYS - activity updated through activity BLDA185 from case BLD07-02401.
Application received  9/5/2007  
Plans ACCEPTED BY PLAN TECH  9/5/2007  
Recd Pcfee & Taken To Pln CK  9/5/2007 DONE