Permit Information
Permit NumberBLD07-02405
StatusFinaled
Name JIM KISSLER LLC
Site Address 1907 S BROADWAY AVE
Project NameGarfield Place- SHELL
Customer Number 
ePlanReviewNo
Description
Garfield Place (Office Shell & Core) - to construct a new 10,520 square foot, two story, wood framed, office shell and core building and related site improvements. The finished core areas include two finished stairways, an elevator, elevator machine room, mechanical room and janitor closet. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/22/200812/22/20081/23/2009 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD9/22/20089/22/200812/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice8/11/20088/11/20089/22/2008 DONE
DetailsJim Storey
BLD-Other8/11/20088/11/20088/11/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/11/2008 at 9:58:23 AM. Contact: ###-####.
DOC - Permit Finaled8/11/20088/11/20088/11/2008PPASS
DetailsJim Storey
BLD-Conference8/8/20088/8/20088/8/2008PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 8/8/2008 at 8:09:20 AM. Contact: ###-####.contractor is going to recall this,, 301 call 415 prior to going out,, ok for TI bld 08-01542 occ.
FIRE-Conference8/6/20088/7/20088/7/2008ADONE
DetailsForrest France
Remainder of building shell life safety issues are finished.
BLD-Conference8/6/20088/6/20088/6/2008PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/6/2008 at 7:05:48 AM. Contact: ###-####.
BLD-Conference6/30/20087/1/20087/1/2008ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/30/2008 at 3:15:11 PM. Contact: ###-####.
BLD-Conference6/19/20086/19/20086/19/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/19/2008 at 7:09:47 AM. Contact: ###-####.
BLD-Final6/4/20086/5/20086/5/2008PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/4/2008 at 7:13:55 PM. Contact: ###-####. ok for ti occ.
FIRE-Final Inspection6/4/20086/5/20086/5/2008PPASS
DetailsForrest France
Building shell life safety inspection completed acceptable with the exception of missing fire lane signage to be installed today. Remainder of fire life safety issues including the 2nd floor area of refuge and elevator recall to be tested and approved in conjunction with and prior to tenant occupancy permit finals.
Code Occupancy Approval6/2/20086/3/20086/3/2008APASS
DetailsWm. Michael Meloy
pat child Phone #: ###-####
Code Occupancy Approval  6/2/2008 FAIL
DetailsWm. Michael Meloy
Inspection on May 30, 2008, found the rear enclosure not finished, but needing stucco. OK to bond for $1,100.00. for temp occupancy.
BLD-Framing/Rough-in5/29/20085/30/20085/30/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/28/2008 at 4:41:54 PM. Contact: ###-####.
BLD-Framing/Rough-in5/28/20085/29/20085/29/2008PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/28/2008 at 4:41:54 PM. Contact: ###-####. out of time rolled over.
PubWorks Occupancy Approval5/30/20085/30/20085/29/2008 DONE
Project complete and signed final occupancy D. Erskine
BLD-Framing/Rough-in5/27/20085/28/20085/28/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/27/2008 at 4:12:18 PM. Contact: ###-####.ceilling ok pending ele aproval.
FIRE-Conference5/23/20085/23/20085/23/2008PDONE
DetailsForrest France
Discussion with contractor regarding project schedule and building permit shell and tenant permit approvals prior to elevator completion.
BLD-Conference5/21/20085/22/20085/22/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/21/2008 at 4:55:17 PM. Contact: ###-####.
BLD-Framing/Rough-in4/23/20084/24/20084/24/2008APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/23/2008 at 4:05:53 PM. Contact: ###-####. hard lid framing ok
(F) Reprint permit  4/23/2008 DONE
CHANGE STATUS TO (ISS)  4/23/2008 DONE
picked up and paid for plan modification
OVERRIDE  4/18/2008  
Plan assigned to (JCM)4/8/20084/8/20084/18/2008 PASS
DetailsJohn Menard
4/18/2008 08:26:50 JCM - activity updated through activity BLDA022 from case BLD07-02405.
Routing - PLAN CHECK4/11/2008 4/18/2008 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  4/18/2008  
Inspection Record Card- Bld  4/18/2008 DONE
Plan Reviewer's activity  4/18/2008 PASS
DetailsJohn Menard
Reviewed and approved plan modification to add floor drains at the second floor exterior walkway. JCM
Telephone call  4/18/2008 DONE
left vm for david glancey at ###-#### - permit ready and fees given
Permit Ready to Issue  4/18/2008 DONE
Routing - PLUMBING4/11/2008 4/11/2008 PASS
DetailsBill VanDegrift
per plans and 2003 upc 2" horizontal drain ok
CHANGE STATUS TO (ISS)  4/9/2008 DONE
Plan Modification Accepted  4/8/2008  
plan modification excepted for bld07-02405 for the redesign of -added florr drains to exterior deck/walkway on sheets A1.2, P1.1. routed to John Menard.
BLD-Framing/Rough-in4/2/20084/2/20084/2/2008PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/2/2008 at 5:58:37 AM. need to fire stop.
BLD-Framing/Rough-in3/27/20083/28/20083/28/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/27/2008 at 10:13:35 AM. Contact: ###-####. truss bracing ok
BLD-Framing/Rough-in3/24/20083/24/20083/24/2008PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/24/2008 at 6:46:46 AM. Contact: ###-####.
BLD-Framing/Rough-in3/20/20083/20/20083/20/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/20/2008 at 8:41:33 AM. Contact: ###-####.
BLD-Framing/Rough-in3/17/20083/18/20083/18/2008APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/17/2008 at 6:06:52 AM. Contact: ###-####. remove wall heater from p/l wall. misc. framing conections/ fire blk at ceilling line. ok to insulate.
BLD-Framing/Rough-in3/11/20083/12/20083/12/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/11/2008 at 2:00:58 PM. Contact: ###-####. first floor framing ok/ bolts and mlb king stud to header/ strap top plates for continous aplaction. fire wall gyp being instaled as per accepted joint aplacation at joist locations in p/l walls and encloser walls back of elvator.
BLD-Footing3/12/20083/13/20083/12/2008ACANC
DetailsJim Storey
Contact: ###-####.
BLD-Framing/Rough-in3/7/20083/10/20083/10/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/7/2008 at 5:15:23 PM. Contact: ###-####. exterior stucco ok to cover.
BLD-Framing/Rough-in3/5/20083/6/20083/6/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/5/2008 at 11:01:44 AM. Contact: ###-####. ok to start interior cover of p/l wall to create rating and start stair encloser wall on ti side.
BLD-Framing/Rough-in3/3/20083/4/20083/4/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/3/2008 at 3:35:16 PM. Contact: ###-####.se and nw brace panel nailling ok under fur out arch. feacher.
BLD-Framing/Rough-in2/27/20082/27/20082/27/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/27/2008 at 10:12:06 AM. Contact: ###-####.roof deck straps and naiolling ok/ insulation ok.
BLD-Framing/Rough-in2/25/20082/26/20082/25/2008ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/25/2008 at 7:14:18 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Feb 25 2008 6:07PM.
BLD-Conference2/19/20082/20/20082/20/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/19/2008 at 8:56:47 AM. Contact: ###-####. fire wall at struc. members ok for pre gyp.
BLD-Conference2/12/20082/13/20082/13/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/12/2008 at 5:51:25 PM. Contact: ###-####.aproved es report for 1 hour assembly fra-103/ es 1254 and 1318. sent to be archived with aproved docs.
BLD-Conference2/5/20082/6/20082/6/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/5/2008 at 4:37:49 PM. Contact: ###-####. enginreering for roof suport to be submited/ floor protection as per aproved submital from plan review.
BLD-Footing12/14/200712/14/200712/14/2007PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/14/2007 at 10:17:18 AM. Contact: ###-####. placed with si reports pending
BLD-Foundation12/11/200712/12/200712/12/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/11/2007 at 4:47:06 PM. Contact: ###-####.placed with si
BLD-Footing12/6/200712/6/200712/6/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/6/2007 at 7:56:27 AM. Contact: ###-####.pwsi
BLD-Footing12/4/200712/5/200712/5/2007APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/4/2007 at 8:27:02 AM. Contact: ###-####. si on site ok pending report after sampling and testing of concrete.
(F) Reprint permit  11/14/2007  
Issue PAID IN FULL permit  11/13/2007 DONE
Telephone call  11/6/2007 DONE
left vm for dave glancey at ###-#### - permit ready and fees given - also need ACHD receipt and RP name
Permit Ready to Issue  11/6/2007 DONE
Routing - PLAN CHECK11/5/2007 11/5/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/5/2007 DONE
Inspection Record Card- Bld  11/5/2007 DONE
Routing - PUBLIC WORKS10/25/2007 11/5/2007 PASS
Routing PW Drainage  11/5/2007 PASS
Plan assigned to (JCM)9/5/2007 11/5/2007 PASS
11/5/2007 14:10:53 JCM - activity updated through activity BLDA022 from case BLD07-02405.
Plan resubmittals received  11/2/2007  
Received five copies of page C2.0; inserted by arch/eng rep, plans taken back to Brian Murphy
Routing - PLAN CHECK10/23/2007 10/25/2007  
Routing - FIRE10/19/2007 10/23/2007 PASS
Attached updated review comments to plans.
Plan Reviewer's activity  10/19/2007 PASS
Reviewed and approved structural and nonstructural resubmitted revisions. JCM
Routing - PLAN CHECK10/5/2007 10/19/2007 PASS
Plan resubmittals received  10/18/2007  
Received transmittal, memo, letter form Stapley Engineering with calculations, United Water Flow sheet, and two copies of pages S0.1, S1.1, S2.1, S2.2, S5.1, S7.1, S7.2, S7.3, G1.1, A1.1, A1.2, A5.3, A6.3, A6.4, A8.2, EN1.1, C1.0, C2.0, C3.0, C4.0, E2.1S, E2.2S, E3.1; inserted by arch. rep. and taken back to John Menard
1st review completed  10/5/2007 FAIL
Routing - FIRE10/2/2007 10/5/2007 FAIL
Faxed and emailed resubmittal items to architect.
Routing - PLAN CHECK9/28/2007 10/2/2007  
John M.
Plan resubmittals requested  10/2/2007 DONE
E-mailed the architect a copy of the plan review requesting revisions.
Routing - PLANNING  9/28/2007 PASS
Approved per DRH07-00288 and DRH07-00384. Andrea T
Routing - PLUMBING9/20/2007 9/27/2007 PASS
Pipe 4" RDL on east end of blding shown as note #11 sheet P1.0 to infiltration swale note#11 on sheet c2.0 as intended but not shown.
Routing - Erosion and Sediment9/18/2007 9/20/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS9/10/2007 9/18/2007 FAIL
Routing PW Street Lights9/14/2007 9/18/2007 PASS
Routing PW Sewer Design  9/14/2007 PASS
Routing PW Solid Waste9/14/2007 9/14/2007 PASS
Plan resubmittals received  9/14/2007  
received 1 transmittal letter, and 5 copys of sheet C2.0 inserted into plans and returned to P W ///DLD
Plan resubmittals requested  9/13/2007 DONE
Faxed the architect a copy of the structural comments requesting revisions. JCM
Routing Off Site - STRUCTURAL9/5/2007 9/13/2007 FAIL
Called Action Couriers for pick up - Received comment list from the consulting structural engineer requesting revisions. JCM
Routing PW Drainage9/11/2007 9/12/2007 FAIL
DetailsBrian Murphy
ROOF DRAINS POND FORE BAY.
Routing PW Sewer Rating9/11/2007 9/11/2007 PASS
Routing - PLANNING Land Div9/5/2007 9/10/2007 PASS
per DAA -
documents for original parcel -
Plans ACCEPTED BY PLAN TECH  9/5/2007  
Plan routing begun/NEW & ADDTN  9/5/2007  
Application received  9/5/2007