Permit Information
Permit NumberBLD07-02416
StatusFinaled
Name FG & PC LLC
Site Address 2912 N COLE RD
Project NameHawthorne Park Four Plex
Customer Number 
ePlanReviewNo
Description
(Hawthorne Park- Four Plex) To construct a new 4,336 sq.ft. two story, four unit apartment building, each unit is two bedrooms, has a separate entry, and is two stories. The Type "B" units have two option "A" bathrooms. They are 1,084 sq.ft. and located at grade level. The two up-stair units are not required to be accessible and are also 1,084 sq.ft. All construction per the approved plans and attached comment list. Section 4-02-31 of Boise City Code was used to determine compliance with fire sprinkler requirements. **TLW**DRH07-00270-Andrea Tuning & CUP07-00079-Joshua Johnson
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 7/9/20087/10/2008 DONE
Permanent Occupancy  7/9/2008 DONE
DetailsTisha Gallop
BLD-Footing5/28/20085/29/20085/28/2008APASS
DetailsTom Arcoraci
arthur Phone #: ###-####
(F) Reprint permit  5/16/2008  
BLD-Final5/9/20085/12/20085/12/2008APASS
DetailsTom Arcoraci
Brandy; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
Code Occupancy Approval5/9/20085/9/20085/12/2008PPASS
DetailsCarol Montgomery
Meets compliance. Pass.
Temporary Occupancy UNPAID FEE  5/12/2008  
BLD-Final4/24/20084/25/20084/25/2008ANR
DetailsTom Arcoraci
chester Phone #: ###-####
FIRE-Final Inspection4/24/20084/24/20084/24/2008PPASS
DetailsTroy Cobbley
fire life safety passed. The smoke detector shown in the kitchen area in the lower level units is not required per scott arlenno.
Print Occupancy Form  4/11/2008  
BLD-Energy code compliance3/4/20083/4/20083/4/2008PPART
DetailsTom Arcoraci
###-#### - randy
BLD-Framing/Rough-in2/29/20082/29/20082/29/2008PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 2/29/2008 at 9:10:52 AM. Contact: ###-####.
BLD-Conference2/6/20082/6/20082/6/2008PPASS
DetailsTom Arcoraci
jake Phone #: ###-#### cn issued
BLD-Other2/4/20082/5/20082/5/2008APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 2/4/2008 at 3:32:05 PM. Contact: ###-####.
BLD-Conference1/31/20082/1/20082/1/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/31/2008 at 2:53:43 PM. Contact: ###-####.
BLD-Foundation1/4/20081/4/20081/4/2008PPASS
DetailsTom Arcoraci
lito Phone #: ###-####
BLD-Footing1/3/20081/3/20081/3/2008PPART
DetailsTony Young
leto Phone #: ###-####
correction to make 24" ftgs,, wip,, dirt mounds in way of checking setbacks
Issue PAID IN FULL permit  11/28/2007 DONE
Telephone call  11/21/2007 DONE
left mess for matt rhees at ###-#### that permit is ready & need r/p & gc
Permit Ready to Issue  11/21/2007  
Plan assigned to (TLW)9/6/2007 11/20/2007 DONE
Routing - PLUMBING11/15/2007 11/20/2007 PASS
Passed by Lee Rice per: Stamp and signature on plans
Routing - Erosion and Sediment9/17/2007 11/20/2007 CANC
Talked with Steve Webb appears plans were skipped passed ESC and routed directly to planning.
Routing - Erosion and Sediment11/20/2007 11/20/2007 PASS
ESC plan approved with attached conditions.
Routing - PLAN CHECK11/20/2007 11/20/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/20/2007 DONE
Print Occupancy Form  11/20/2007 DONE
Routing - PLAN CHECK10/9/2007 11/14/2007 PASS
Resubmittals recieved with all corrections.
Plan resubmittals received  11/9/2007 DONE
received 1 transmittal,2 project letters and 2 copies of sheets A0.0,A2.0,A3.0,A5.0,A8.0,A9.0,P1.0,M1.0,E1.0 taken to Tim W.
1st review completed  10/9/2007 FAIL
Routing - FIRE10/3/2007 10/9/2007 PASS
Attached IFC review comments to plans.
Routing - PLAN CHECK  10/4/2007 FAIL
Correction List attached in documents
Routing - PLANNING  9/18/2007 PASS
Routed to Plan Check
Routing - PUBLIC WORKS9/7/2007 9/17/2007 PASS
Routing PW Sewer Rating9/14/2007 9/17/2007 PASS
Routing PW Street Lights9/10/2007 9/14/2007 PASS
Routing PW Drainage9/7/2007 9/10/2007 PASS
Routing PW Solid Waste9/7/2007 9/10/2007 PASS
Routing - PLANNING Land Div9/6/2007 9/7/2007 PASS
combo lot with original lot of record - ok's by TT - JJ
Application received  9/6/2007  
Plans ACCEPTED BY PLAN TECH  9/6/2007  
Plan routing begun/NEW & ADDTN  9/6/2007 DONE