Third Notice BLD | 9/22/2008 | 9/22/2008 | 3/9/2009 | | DONE |
Patricia Smith
|
|
|
Second Notice has not been responded to.
|
Telephone call | | | 2/26/2009 | | DONE |
|
|
|
t/c w chris at steed construction - he said they did not do the work on this project - that we should contact mark rivers at 368-000
|
Telephone call | | | 2/26/2009 | | DONE |
|
|
|
left vm for mark rivers at ###-#### to call me regarding the final values on this project
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/21/2008 | 8/11/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/21/2008 | | |
|
|
|
|
BLD-Final | 5/11/2008 | 5/12/2008 | 5/12/2008 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/11/2008 at 9:23:41 PM. Contact: ###-####. signed on temp occ.,, but now see that all trades are signed off in comp. system,, final/perm. cof o is ok
|
FIRE-Final Inspection | 5/11/2008 | 5/12/2008 | 5/12/2008 | A | PASS |
Forrest France
|
|
|
Noted corrections have been completed, minor adjustments to duct sample tube orientation done while on site, fire life safety finaled.
|
Temporary Occupancy UNPAID FEE | | | 5/12/2008 | | DONE |
|
|
|
|
Code Occupancy Approval | 5/9/2008 | 5/9/2008 | 5/9/2008 | P | PASS |
Michael Garner
|
|
|
Site inspection completed - work has been completed according to approved plans
|
BLD-Final | 5/9/2008 | 5/9/2008 | 5/9/2008 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/9/2008 at 9:37:22 AM. Contact: ###-####. needs fire c/n items completed and finaled
|
FIRE-Final Inspection | 5/9/2008 | 5/9/2008 | 5/9/2008 | A | FAIL |
Troy Cobbley
|
|
|
Provide tags for the three fire extinguishers. Provide remote annunciators as discussed for the duct smoke detectors. The duct smoke detectors are mounted in the 90 degree elbows of the return air ducting. A manometer test will be required or the ducting modified to the 6 to 10 duct widths as per NFPA 72. All other items checked out ok.
|
FIRE-Final Inspection | 5/8/2008 | 5/8/2008 | 5/8/2008 | P | NR |
Forrest France
|
|
|
Not ready at this time per phone call from contractor, to be rescheduled as discussed.
|
FIRE-Conference | 4/14/2008 | 4/14/2008 | 4/14/2008 | P | DONE |
Forrest France
|
|
|
On site conference regarding door hardware, duct detectors and project fire code review notes.
|
BLD-Conference | 4/14/2008 | 4/14/2008 | 4/14/2008 | P | PART |
Tony Young
|
|
|
andy Phone #: ###-#### conf w/ 430 on doors, landings, etc
|
BLD-Framing/Rough-in | 4/10/2008 | 4/10/2008 | 4/10/2008 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/10/2008 at 7:08:34 AM. Contact: ###-####. walls ok to cover
|
BLD-Framing/Rough-in | 4/3/2008 | 4/3/2008 | 4/3/2008 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/3/2008 at 6:52:06 AM. Contact: ###-####. braces under mech rooftop units
|
BLD-Conference | 3/20/2008 | 3/20/2008 | 3/20/2008 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/20/2008 at 5:55:59 AM. Contact: ###-####. draft stop ?s,, can do on existing ponywall framing,, other misc ?s,, ok
|
Plan assigned to (CJW) | 3/13/2008 | | 3/18/2008 | | PASS |
Carl Westfall
|
|
|
3/18/2008 08:07:52 CJW - activity updated through activity BLDA022 from case BLD07-02423.
|
Routing - PLAN CHECK | 3/17/2008 | | 3/18/2008 | | DONE |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/18/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/18/2008 | | |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 3/18/2008 | | |
|
|
|
Carl Westfall brought plans to Marsha S. stating that ACHD is not required.. Had Nan Hills with ACHD fax me the paperwork. (See scanned document). put plans in drawer
|
Telephone call | | | 3/18/2008 | | |
|
|
|
talked to steed const at ###-#### that permit is ready
|
Telephone call | | | 3/18/2008 | | |
|
|
|
talked to mark rivers at 368-000 that permit is ready & need gc form
|
Issue PAID IN FULL permit | | | 3/18/2008 | | DONE |
|
|
|
|
Routing - PLANNING | 3/14/2008 | | 3/17/2008 | | PASS |
Sarah Schafer
|
|
|
The planters or barriers required adjacent to the doors swinging out into the public sidewalk shall be planters and shall be coordinated with CCDC and Design Review staff.
|
Routing - PLAN CHECK | 3/13/2008 | | 3/14/2008 | | PASS |
Carl Westfall
|
|
|
Drawings pulled back from the permits desk to insert revised drawings.
|
Plan resubmittals received | | | 3/13/2008 | | |
|
|
|
received transmittal from jensen belts asso. & temporary license agreement (9 ) pages. also "2" sets of plans with 2 sheets each of C-1, & 1 sheet of ST-1--plans taken to Carl Westfall
|
Telephone call | | | 12/12/2007 | | DONE |
|
|
|
t/c w stan cole at ###-#### - permit ready and fees given - also need ACHD receipt
|
Permit Ready to Issue | | | 12/12/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/11/2007 | | 12/11/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/11/2007 | | DONE |
|
|
|
|
Routing - PLANNING | 12/6/2007 | | 12/11/2007 | | PASS |
Sarah Schafer
|
|
|
Approved per the revised site plans dated received December 7, 2007. The gravel parking lot on the previous site plan can not be approved in that zone. No parking is allowed on the adjacent parcel until an approved improved parking area goes through the Design Review process.
|
Plan assigned to (CJW) | 9/7/2007 | | 12/11/2007 | | PASS |
|
|
|
12/11/2007 10:40:37 CJW - activity updated through activity BLDA022 from case BLD07-02423.
|
Telephone call | | | 12/6/2007 | | DONE |
|
|
|
Spoke with Jason Martin from Steed Construction. The addition on these plans is the "gravel parking lot" to the northwest of the property. The "gravel parking lot" is not allowed without other approvals. If they can remove the lot from this building permit, I could go ahead and sign off on the plans and work with them on receiving approvals for parking. Jason will be calling the architect and will be getting back to me.
|
Routing - PLAN CHECK | 11/29/2007 | | 12/6/2007 | | PASS |
|
|
|
(11-30-07) Talked to the Mechanical Engineer. According to him, he was told by the contractor that the West room would be an assembly occupany. The submitted drawings show it as open office. He said he would consult with the Architect and advise. (12-6-07) Outside air for the West room was reduced to office occupancy quantities. The drawings were approved after the 4th resubmittal review.
|
Plan resubmittals received | | | 12/4/2007 | | |
|
|
|
received 1 response letter and 2 copies of sheets M0.1,M1.1,M1.2 taken to Carl W.
|
Routing - FIRE | 11/27/2007 | | 11/29/2007 | | PASS |
Scott Arellano
|
|
|
Attached updated fire review comments to plans.
|
Routing - PLAN CHECK | 10/17/2007 | | 11/27/2007 | | FAIL |
|
|
|
Finished the resubmittal review. One item not resolved. E-mailed the architect asking for a resolution.
|
Plan resubmittals received | | | 11/20/2007 | | DONE |
|
|
|
received 1 plan review report, 1 response to plan review report,1 temporary license agreement application form,1 ADA County Highway Dist receipt and 2 copies of sheets A2.1,A3.0,P1.2,EN1.0,M0.1,M1.1,M1.2,E0.0,E0.1,E2.1P,E2.1L,E2.2P,E3.1 taken to Carl W.
|
Routing - PUBLIC WORKS | 10/17/2007 | | 10/17/2007 | | DONE |
|
|
|
Sent back for service sink fees.
|
Routing - PLAN CHECK | 9/28/2007 | | 10/17/2007 | | FAIL |
|
|
|
Completed the 1st resubmittal review. Additional changes required. See the 2nd plan review report.
|
Plan resubmittals received | | | 10/12/2007 | | |
|
|
|
Received transmittal and letter addressed to George Slane, transmittal and response letter to Carl Westfall, and two copies of pages A0.0, A1.0, A2.0, A2.1, A2.2, A2.3, A2.4, A3.0, A4.0, EN1.0, M0.0, M0.1, M1.1, P0.0, P0.1, P1.1, P1.2; taken to Carl W.
|
1st review completed | | | 9/28/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 9/26/2007 | | 9/28/2007 | | FAIL |
|
|
|
Faxed and emailed resubmittal items to architect.
|
Routing - PLAN CHECK | 9/13/2007 | | 9/26/2007 | | FAIL |
|
|
|
The IBC plan review was started on September 24, 2007 and was finished on September 26, 2007. Revised drawings were required. See the plan review report.
|
Routing - PLANNING | 9/12/2007 | | 9/13/2007 | | PASS |
|
|
|
Sarah Schafer (minor exterior modifications) Exterior modifications were minor enough to sign off on as a buidling permit.
|
Routing PW Street Lights | | | 9/12/2007 | | PASS |
|
|
|
STREET LIGHTING WILL BE UNDER FUTURE PERMIT
|
Routing - PUBLIC WORKS | 9/7/2007 | | 9/12/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 9/10/2007 | | 9/10/2007 | | PASS |
|
|
|
|
Routing PW Drainage | 9/10/2007 | | 9/10/2007 | | PASS |
|
|
|
|
Application received | | | 9/7/2007 | | |
|
|
|
|
Pending Assignment by MYS | 9/7/2007 | | 9/7/2007 | | DONE |
|
|
|
9/7/2007 12:24:36 MYS - activity updated through activity BLDA172 from case BLD07-02423.
|
Plans ACCEPTED BY PLAN TECH | | | 9/7/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/7/2007 | | DONE |
|
|
|
|