Third Notice BLD | 9/22/2008 | 9/22/2008 | 12/18/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 7/10/2008 | 8/11/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/10/2008 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 6/19/2008 | 6/20/2008 | 6/20/2008 | P | PASS |
Tony Young
|
|
|
Rob- Phone #: ###-####
|
FIRE-Final Inspection | 6/19/2008 | 6/20/2008 | 6/20/2008 | A | PASS |
Troy Cobbley
|
|
|
fire life safety passed
|
FIRE-Final Inspection | 6/19/2008 | 6/19/2008 | 6/19/2008 | P | FAIL |
Troy Cobbley
|
|
|
Remove the thumbturn, provide indicator and sticker as discussed at the west main exit. All other items are passed.
|
Code Occupancy Approval | 6/19/2008 | 6/19/2008 | 6/19/2008 | P | PASS |
Michael Garner
|
|
|
site inspection complete - I found that the work has been completed according to approved plans and permits - PASS
|
BLD-Aging Inspection | 5/13/2008 | 5/13/2008 | 5/16/2008 | | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 5/14/2008 | 5/14/2008 | 5/14/2008 | P | PART |
Jim Sly
|
|
|
rob Phone #: ###-#### OK to cover inside/outside walls and ceiling ( main floor area) of 1hr stair enclosure.
|
BLD-Framing/Rough-in | 5/8/2008 | 5/9/2008 | 5/9/2008 | A | PART |
Mike Jordan
|
|
|
rob Phone #: ###-####. Ok to rock hardlids at 1st floor ceiling. 1hr. assemblies for exit corridor enclosure has many issues. Noted unprotected openings in ceiling assembly, wall assembly and additional conduit that penetrates exit corridor and does not serve corridor. Also requested UL approved assembly for floor/ceiling assembly at 1hr. corridor, 1st. floor. told contractor not to proceed in this area.
|
BLD-Framing/Rough-in | 5/7/2008 | 5/7/2008 | 5/7/2008 | P | PART |
Dave Hannah
|
|
|
Rob; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to one side needs to fire block and finish one hr around stairs
|
CHANGE STATUS TO (ISS) | | | 2/15/2008 | | |
|
|
|
already issued ( a plan mod)
|
(F) Reprint permit | | | 2/15/2008 | | |
|
|
|
|
Telephone call | | | 2/11/2008 | | DONE |
|
|
|
Called left message with Cathy S. (###-####) permit ready anf fee due.
|
Inspection Record Card- Bld | | | 2/11/2008 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 2/11/2008 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 2/1/2008 | 2/1/2008 | 2/5/2008 | | PASS |
Carl Westfall
|
|
|
2/5/2008 16:39:50 CJW - activity updated through activity BLDA022 from case BLD07-02455.
|
Routing - PLAN CHECK | 2/4/2008 | | 2/5/2008 | | PASS |
Carl Westfall
|
|
|
Plan modification approved.
|
Routing - PUBLIC WORKS | 2/5/2008 | | 2/5/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PLANNING | 2/5/2008 | | 2/5/2008 | | PASS |
|
|
|
New exterior wall infill approved if it matched the previously approved exterior wall infills. CJW
|
Routing - PLAN CHECK | 2/5/2008 | | 2/5/2008 | | DONE |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2008 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 2/1/2008 | | |
|
|
|
plans modification excepted for BLD07-02455 for the redesign to delete all work associated with second floor restrooms (demo, paint, doors, plumbing, hvac, finishes). janitor sink will be removed. revise/reconfugure second stair door location and tenant entry. new sink & base cabinet in janitor closet. infill second floor, south facing window in hall 200. the sheets being modified are A2.O, A2.1, A8.1, & P1.1 and routed plans to Carl Westfall
|
Issue PAID IN FULL permit | | | 12/18/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/5/2007 | | DONE |
|
|
|
|
Telephone call | | | 12/5/2007 | | DONE |
|
|
|
left vm for catherine sewell at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 12/5/2007 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 9/27/2007 | | 12/4/2007 | | PASS |
|
|
|
12/4/2007 15:05:29 CJW - activity updated through activity BLDA022 from case BLD07-02455.
|
Routing - FIRE | 12/3/2007 | | 12/4/2007 | | PASS |
Scott Arellano
|
|
|
Attached IFC review comments to plans.
|
Routing - PLANNING | 12/4/2007 | | 12/4/2007 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 12/4/2007 | | 12/4/2007 | | DONE |
|
|
|
Changes to the East exterior wall approved by Planning.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/4/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/2/2007 | | 12/3/2007 | | PASS |
|
|
|
The drawings were approved, with "red lines", after the resubmittal review. E-mailed a complete final report to the architect.
|
Plan resubmittals received | | | 11/28/2007 | | |
|
|
|
received transmittal sheet and review comments (2) pages & "2" sets of structural calcs (6) & "2" sets of plans including each sheet of G1.O, A2.O, A2.1, A8.1, MO.O, MO.1, P1.O, P1.1, H1.O, H2.1, E2.OD, E2.OL, E2.OMP, E2.OP, E2.OS, & E3.O--plans taken to Carl Westfall
|
Routing - FIRE | 10/29/2007 | | 11/2/2007 | | FAIL |
|
|
|
Plans routed to Carl W. until building construction design has been finalized.
|
1st review completed | | | 11/2/2007 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 9/28/2007 | | 10/29/2007 | | FAIL |
|
|
|
The IBC plan review was started on October 25, 2007 and was finished on October 29, 2007. Revised drawings were required. See the plan review report.
|
Routing - PLANNING | 9/27/2007 | | 9/28/2007 | | PASS |
|
|
|
Approver per CZC07-00246. ANT
|
Routing - PUBLIC WORKS | 9/27/2007 | | 9/27/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 9/11/2007 | | 9/27/2007 | | DONE |
|
|
|
9/27/2007 12:38:38 MYS - activity updated through activity BLDA172 from case BLD07-02455.
|
Routing PW Sewer Rating | 9/27/2007 | | 9/27/2007 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/12/2007 | | |
|
|
|
|
Application received | | | 9/11/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/11/2007 | | |
|
|
|
|