Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD07-02458
StatusFinaled
Name STOCK CONSTRUCTION MANAGEMENT
Site Address 2854 S FEATHERLY WAY
Project NameSystem Tech INC
Customer Number 
ePlanReviewNo
Description
System Tech - To construct a new 12,035 square foot office and warehouse building with a 1,400 square foot storage mezzanine and related site improvements. This building is constructed of masonry exterior walls with steel structural interior frame and roof system. This permit has been modified to included an automatic fire sprinkler system per Fire Department requirements. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD1/2/20091/2/20091/20/2009 DONE
DetailsDarla L Downs
This permit finaled on the web by Erik Holinka
First Notice 11/26/20081/2/2009 DONE
Zoning Approval11/26/200811/26/200811/26/2008 DONE
DetailsAndrea Tuning
Permanent Occupancy  11/26/2008 DONE
OVERRIDE  11/20/2008  
CHANGE STATUS TO (ISS)  11/20/2008  
already issued previously. a plan mod.
(F) Reprint permit  11/20/2008  
Telephone call  11/20/2008 DONE
Details
left vm for dan patten at ###-#### - plan mod ready and fees given
Permit Ready to Issue  11/20/2008 DONE
Details
Plan assigned to (JCM)11/13/2008 11/19/2008 DONE
DetailsJohn Menard
Routing - PLAN CHECK11/13/2008 11/19/2008 PASS
DetailsJohn Menard
Plan resubmittals received  11/19/2008 DONE
DetailsJohn Menard
Received, by architect's e-mail, stamped and sign structural calculations for the proposed plan modification. JCM
Plan Reviewer's activity  11/19/2008 PASS
DetailsJohn Menard
Reviewed and approved plan modification to add an additional 3070 man door and 12x12 overhead door at th east exterior wall. JCM
PLANS/APPL TAKEN TO FRONT DESK  11/19/2008 DONE
DetailsJohn Menard
Plan resubmittals requested  11/18/2008 DONE
DetailsJohn Menard
Called the architect to request stamped and signed structural calculations for the proposed plans modification. JCM
Plan Modification Accepted  11/13/2008 DONE
DetailsDarla L Downs
Plan Mod excepted for BLD07-02458 System Tech to add a new over head door and a new man door adjacent to the existing approved over head door. On sheets A-2.1,A-3.1,A-4.1,A-5.1,A-6.1 and see delta mark 4 for changes specific to this request. Plans routed to John M.
BLD-Final10/16/200810/17/200810/17/2008APART
DetailsMike Jordan
Scheduled via mobile device. Phone #: 5737193. ok for temp occ. Will be ok for perm occ. once zoning receives and approves new elevation detail showing additional overhead door.
FIRE-Final Inspection10/16/200810/17/200810/17/2008APASS
DetailsTroy Cobbley
Life safety passed
Temporary Occupancy10/17/20081/15/200910/17/2008 DONE
DetailsTisha Gallop
BLD-Final10/15/200810/16/200810/16/2008PNR
DetailsMike Jordan
eric, please call to make sure he''s there Phone #: ###-####
FIRE-Final Inspection10/15/200810/16/200810/16/2008AFAIL
DetailsTroy Cobbley
See the city approved plans for locations where exit discharge lighting and interior emergency lighting is inoperative. Need the project related fire alarm permit finaled as well. Scott Arleno is ok with the fire dept access through the gate on the north side of the building.
Code Occupancy Approval Temp  10/8/2008 DONE
Staff has issued the applicant a 30 day temporary occupancy. The 30 day period will allow the applicant adequate time to receive a staff level design review approval to add an overhead door and a man door to the east elevation. Once the applicant has submitted the staff level DR application, the applicant is also required to update the building plans to reflect the additional overhead door and the man door that was constructed within the east elevation. ANT 10-8-08
PubWorks Occupancy Approval9/29/20089/29/20089/29/2008 DONE
DetailsTiffany Lowery
Code Occupancy Approval  9/26/2008 FAIL
Staff arrived at the site and waited for 20 minutes for the applicant to arrive. Staff did briefly look at the site. When staff asked why the pre-finished metal shade coverings over the windows had not been installed, the applicant replied,"those will be installed later." Staff responded by stating that the awnings either had to be installed or bonded for in order for occupancy to be issued. The applicant grabbed the plans and took them into the building. Staff asked the applicant if they wanted staff to go over the entire site to let them know if there were any other chnages necessary to obtain occupancy but the applicant replied by saying that "all of that could be done once the inspection had been rescheduled. A new reinspection will be scheduled once the window shades have been installed. 9-26-08
BLD-Final9/18/20089/18/20089/18/2008PNR
DetailsMike Jordan
Eric- call 30 mins prior to going Phone #: ###-####
BLD-Framing/Rough-in8/15/20088/15/20088/18/2008PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/15/2008 at 9:13:07 AM. Contact: ###-####. Sheet rock for riser room.
BLD-Framing/Rough-in7/31/20087/31/20087/31/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/31/2008 at 8:45:57 AM. Contact: ###-####.Interior framed walls only. no grid or soffitt.
BLD-Framing/Rough-in7/15/20087/15/20087/16/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/15/2008 at 10:57:35 AM. Contact: ###-####. Wants to rock from top of wall to ceiling. Needs to contact other trade insp. for approval.
BLD-Foundation3/5/20083/5/20083/5/2008PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/5/2008 at 8:43:29 AM. Contact: ###-####. Interior column pad footings.
BLD-Foundation2/14/20082/15/20082/15/2008APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/14/2008 at 4:29:38 PM. Contact: ###-####. wip on perimeter stemwall. Need RFI from engineer for fix on vertical steel. Vertical steel placed at 8" oc. Needs to be 2#5 at 24" oc.
BLD-Foundation2/8/20082/11/20082/11/2008APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/8/2008 at 3:30:32 PM. Contact: ###-####. perimeter footing.
BLD-Foundation2/5/20082/6/20082/6/2008APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/5/2008 at 1:55:50 PM. Contact: ###-####. delay due t weather. wip on installing vert. Steel at perimeter footings. Project will have special insp.
(F) Reprint permit  1/17/2008  
Print Occupancy Form  1/16/2008 DONE
Telephone call  1/16/2008 DONE
left vm for troy at ###-#### - permit ready and fees given - also need rp - tried to call erik at ###-#### but his mail box was full and i could not leave a message
Permit Ready to Issue  1/16/2008 DONE
Issue PAID IN FULL permit  1/16/2008  
Plan assigned to (JCM)9/12/2007 1/15/2008 PASS
DetailsJohn Menard
1/15/2008 14:12:04 JCM - activity updated through activity BLDA022 from case BLD07-02458.
Routing - PLAN CHECK1/10/2008 1/15/2008 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  1/15/2008 DONE
Routing - FIRE1/9/2008 1/10/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK12/5/2007 1/9/2008 PASS
DetailsJohn Menard
Plan Reviewer's activity  1/9/2008 PASS
Reviewed and approved structural and nonstructural plan revisions. JCM
Plan resubmittals received  1/8/2008 DONE
received 1 structural calc, 1 structural corrections & response, 1 fire code correction & response,1 plan review correction & response,1 trview comments, 1 transmittal, and 2 copies of sheets 00-0.1,C-1.0,C-1.1,SL-1.1,SL-1.2,A-2.1,A-2.2,A-3.1,A-4.1,A-5.1,A-6.1,A-7.7,A-8.3,A-8.6,A-9.1,A-9.2.A-10.1,A-11.1,M0.0,M0.1,M0.2,P1.0,P1.1,P2.1,H1.0,H2.1,E0.0,E1.0,E2.0F,E2.0L,E2.0MP,E2.0P,E2.0S,E3.0,E3.1,E3.2,E4.0,E4.1,E4.2,E4.3,E4.4 (2 sheets with resubmittal sheet information. inserted into plans by Pamela Johnson from LKV Architects. plans taken back to John M.
Routing - PLUMBING11/28/2007 12/5/2007 PASS
per plans and 2003 upc
Routing - PUBLIC WORKS10/29/2007 11/28/2007 PASS
Routing PW Drainage10/29/2007 11/28/2007 PASS
Routing - PLAN CHECK10/12/2007 10/29/2007  
1st review completed  10/12/2007 FAIL
Routing - FIRE10/9/2007 10/12/2007 FAIL
Faxed and emailed resubmittal items to archtitect.
Routing - PLAN CHECK9/28/2007 10/9/2007 FAIL
Plan resubmittals requested  10/9/2007 DONE
E-mailed the architect a copy of the plan review requesting revisions. JCM
Plan resubmittals requested  10/3/2007 DONE
Faxed the architect a copy of the structural plan review requesting revisions. JCM
Plan resubmittals received  10/3/2007  
received transmittal from keith jacobs eng. & (2) pages of materials testing & insp & "5" sheets of C-1.O--plans taken to John Menard
Routing - PLANNING  9/28/2007 PASS
Approved per DRH07-00351 and DRH07-00172. ANT
Routing Off Site - STRUCTURAL9/12/2007 9/28/2007 FAIL
Called Action Couriers for pick up - Received comment list from consulting structural engineer requesting revisions.
Routing - PLUMBING9/25/2007 9/27/2007 FAIL
revise sheet C-1.0 to coordinate San Sewer stub at Featherly Way to matcxh point indicated on sheet P1.0 of San Sewer exit of Building.
Routing - Erosion and Sediment9/24/2007 9/25/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS9/14/2007 9/24/2007 FAIL
Routing PW Solid Waste  9/24/2007 PASS
Please consider enlarging trash enclosure to accommodate recycling: clearance @ gate opening must be 17' to allow automated service on two containers.
Routing PW Drainage9/19/2007 9/21/2007 FAIL
DetailsBrian Murphy
GEOTECH REPORT NO 10 FOOT SEPERATION.
Routing PW Sewer Design9/17/2007 9/19/2007 PASS
Routing PW Street Lights9/19/2007 9/19/2007 PASS
Routing PW Sewer Rating9/17/2007 9/17/2007 PASS
Routing - PLANNING Land Div9/12/2007 9/14/2007 PASS
Application received  9/12/2007  
Plans ACCEPTED BY PLAN TECH  9/12/2007  
Plan routing begun/NEW & ADDTN  9/12/2007