Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD07-02466
StatusFinaled
Name LEGACY HOMES OF IDAHO LLC
Site Address 2294 W WINTER CAMP DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit to construct a 4278 sq.ft. multilevel single family dwelling (2950 sq.ft main floor / 1328 sq.ft. daylight basement), with a 189 sq.ft. covered front porch, a 185 sq.ft. covered rear patio, a 280 sq.ft. raised deck, and a 1819 sq.ft. attached garage. This lot is within the hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible area will be maintained. HILLSIDE FOUNDATION DESIGNS. Dwellings; townhouse units; additions to same and detached structures constructed in areas falling under the purview of the "Boise City Hillside Ordinance", shall have foundation designs signed and sealed by a professional engineer licensed by the State of Idaho, and qualified in the engineering specialty involved. (Boise City Code 4-02-44) Approval is based on approved plans, engineering, soils report, redlinning, rescheck, and plan review report. Zoning approval by Sue Hansen for an R-1B zone.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/24/20083/25/20083/25/2008APASS
DetailsTony Young
nat Phone #: ###-####
house ok,, POOL IS NOT!!!
DOC - Permit Finaled3/25/20083/25/20083/25/2008PPASS
DetailsTony Young
c of o issued
BLD-Grading Inspection3/24/20083/24/20083/24/2008PDONE
DetailsTerry Records
Final grading and drainage approved
BLD-Grading Inspection3/20/20083/20/20083/20/2008PDONE
DetailsTerry Records
Final grading and drainage approved
FIRE-Final Inspection3/18/20083/18/20083/18/2008PCANC
DetailsTroy Cobbley
nat Phone #: ###-#### Wrong inspection type called in. I contacted Nate.
BLD-Final3/14/20083/14/20083/14/2008PFAIL
DetailsTony Young
nate Phone #: ###-####
walk through only,, c/n posted,, also still need hillside
BLD-Final3/13/20083/14/20083/14/2008ANR
DetailsTony Young
nate Phone #: ###-####
need hill side 1st
BLD-Final3/11/20083/12/20083/12/2008ANR
DetailsTony Young
nate Phone #: ###-####
need hill side signoff 1st
BLD-Energy code compliance1/4/20081/7/20081/7/2008APASS
DetailsTony Young
Doug ###-####
BLD-Framing/Rough-in1/3/20081/4/20081/4/2008APASS
DetailsTony Young
doug Phone #: ###-####
BLD-Framing/Rough-in1/2/20081/2/20081/2/2008PNR
DetailsTony Young
Jason; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
on site walk through,, need trades,, seal pack
BLD-Framing/Rough-in12/20/200712/21/200712/21/2007PPART
DetailsTony Young
jason Phone #: ###-####
exterior stapling ok, verify int HDs later
BLD-Footing11/19/200711/20/200711/20/2007APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 11/19/2007 at 11:36:31 PM. Contact: ###-####.
retaining walls ok
BLD-Footing11/15/200711/15/200711/15/2007APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 11/15/2007 at 12:21:51 AM. Contact: ###-####.
retaining wall ftgs
BLD-Foundation11/6/200711/6/200711/6/2007PPART
DetailsDave Hannah
ryan Phone #: ###-#### crew about 95% complete
BLD-Footing10/28/200710/29/200710/29/2007APART
DetailsTony Young
Scheduled by a contractor via Hello! on 10/28/2007 at 8:49:05 PM. Contact: ###-####.
wip on new wall design,, ok to pour after
BLD-Footing10/26/200710/26/200710/29/2007PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 10/25/2007 at 11:02:16 PM. Contact: ###-####.
BLD-Footing10/25/200710/26/200710/26/2007ANR
DetailsTony Young
Scheduled by a contractor via Hello! on 10/25/2007 at 11:02:16 PM. Contact: ###-####.
conf only,, need revision from engineer on design due to elevation of dig
PubWorks Subgrade Approval10/25/200710/25/200710/25/2007 DONE
Footing subgrade approved by the geotechnical engineer
Telephone call  10/4/2007 DONE
t/c w nate sampson at ###-#### - permit ready and fees given
Permit Ready to Issue  10/4/2007 DONE
Issue PAID IN FULL permit  10/4/2007 DONE
Plan assigned to (TLW)10/3/2007 10/3/2007 DONE
Case Summary (BLD)  10/3/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/3/2007 DONE
Plan Reviewer's activity  10/3/2007 DONE
Only Issueing one set of plans. Stuck Orange sticker to plans, and notified applicant.
Inspection Record Card- Bld  10/3/2007 DONE
Routing - PLAN CHECK9/18/2007 10/3/2007 PASS
Foundation plan has redlines from the engineer to correct it. Typically these changes need made to the plan, however, applicant was given specific permission by Plan review staff that engineers redlines were sufficent. Passed based on attached engineering.
Routing - Erosion and Sediment9/17/2007 9/18/2007 PASS
ESC plan approved with attached conditions.
Routing - FIRE9/18/2007 9/18/2007 PASS
No fire sprinklers required. (Eyrie Canyon Sub #2)
Routing - PLANNING9/17/2007 9/17/2007 PASS
routed to Sue Hansen CFH07-00033
Routing - PUBLIC WORKS9/13/2007 9/13/2007 PASS
Routing - PUBLIC WORKS GRADING9/12/2007 9/13/2007 PASS
Approved as Category 1 by CFH07-00033
Application received  9/12/2007  
Routing - Addressing9/12/2007 9/12/2007 PASS