Permit Information
Permit NumberBLD07-02488
StatusFinaled
Name KNOTHE ZIOR CASALI CONSTRUCTION LLC
Site Address 130 E MALLARD DR
Project NamePLAZA APARTMENTS
Customer Number 
ePlanReviewNo
Description
(PLAZA APARTMENTS formerly known as Parkcenter Apartments - GARAGE BEAM REPAIRS) To repair or replace structural beams and/or add supports for beams in the parking garage per engineered approved plans and all work neccessary to perform a full structural analysis, including: Removal of sheetrock, siding, and concrete slabs, and any temproary supports as required by structural engineer. Approved per engineered plans, plan review report, and structural calculations.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/14/20135/14/20135/14/2013APASS
DetailsJim Storey
Structural repairs and engineers final letter of completion under BLD11-01031.
DOC - Permit Finaled  5/14/2013 DONE
Plan Reviewer's activity  3/7/2013 DONE
DetailsTim L. Woodard
A conference was held between Jason Blais, Jim Storey, and myself to evaluate Scott Soule's Final Structural Letter (Attached to BLD11-01031) we will accept it with the understanding that Scott Soule's instructions of continual maintenance will be followed through with. If we come to find that maintenance is not be done and the issues begin to reappear we will reevaluate this decision and possibly pull the Certificate of Occupancy. TLW
BLD-Aging Inspection2/21/20132/21/20132/27/2013 DEFR
DetailsJim Storey
pending action from planreview for l/c. insp. is compliant for aproval
BLD-Aging Inspection11/13/201211/13/201211/14/2012 PASS
DetailsJim Storey
BLD-Aging Inspection8/14/20128/14/20128/17/2012 PASS
DetailsJim Storey
wip/ letter on file w BO and planreview.
BLD-Aging Inspection5/14/20125/14/20125/16/2012 PEND
DetailsJim Storey
no requist to insp.
BLD-Aging Inspection2/13/20122/13/20122/17/2012 PASS
DetailsJim Storey
letter recieved and fab of material is in progress for beam repairs. letter on file and with b.o.
BLD-Framing/Rough-in11/14/201111/15/201111/15/2011ACANC
DetailsJim Storey
9:30 apt.
BLD-Framing/Rough-in11/14/201111/14/201111/14/2011PPASS
DetailsJim Storey
dan Phone #: ###-####
BLD-Aging Inspection9/21/20119/21/20119/26/2011 PEND
DetailsTony Young
BLD-Aging Inspection6/21/20116/21/20116/22/2011 PART
DetailsJim Storey
reviewed joist ledger aplaction need engineer on site review to remove shoring.
BLD-Conference3/16/20113/16/20113/16/2011PPASS
DetailsJim Storey
doug ###-#### aptt. 3:00 will have walkthru w arch/engineer/contractor tue 3:00 pm
BLD-Aging Inspection2/28/20112/28/20113/3/2011 PEND
DetailsTony Young
Plan resubmittals received  2/3/2011 DONE
DetailsJason Blais
Received updated structural plans, updated structural calculations, and engineer visual inspection letter via email. All attached to this case and will be provided to Records. Forwarded the documents to the building plan reviewer.
Meeting  1/4/2011 DONE
DetailsJason Blais
On site meeting - attending were owner Ken Howell, Property Manager Doug Bolen, Structural Engineer Riley Mahaffey, contractor, Building Official Jason Blais, Building Inspection Supervisor Bob Archibald, Building Inspector Jim Storey, and Plans Examiner Tim Woodard. The group walked the underground parking garage and discussed structural issues and water remediation needing to occur. See 1/19/11 letter attached to this case for action needed to be taken by owner.
BLD-Aging Inspection12/28/201012/28/201012/28/2010 PASS
DetailsJim Storey
Re-open per Jason BLais & Bob Archibald Final inspection and structural engineer verification needed
Reopen Permit (ISS)  12/27/2010 DONE
DetailsBarbara Stitt
Re-open per Jason BLais & Bob Archibald Final inspection and structural engineer verification needed
Case Summary (BLD)  12/20/2010 DONE
DetailsBarbara Stitt
DOC - Permit Expired7/30/20108/4/20108/9/2010APASS
DetailsJim Storey
R105.5 Expiration.
Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.

R105.8 Responsibility.
It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
BLD-Aging Inspection7/30/20107/30/20107/30/2010 PEND
DetailsTony Young
BLD-Aging Inspection5/10/20105/10/20105/10/2010 PEND
DetailsTony Young
Case Summary (BLD)  5/15/2009 DONE
BLD-Framing/Rough-in5/12/20095/12/20095/12/2009PPASS
DetailsJim Storey
Andrew Phone #: ###-####
BLD-Framing/Rough-in5/14/20085/15/20085/15/2008APART
DetailsJim Storey
p.j. - please call 1/2 hr prior to inspection Phone #: ###-#### s-2 #4 wall aproved for cover.
BLD-Footing4/17/20084/18/20084/18/2008APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/17/2008 at 3:05:09 PM. Contact: ###-####. rebar ok need engineer to adress epoxy not insp. by si at instaltion/ pending concrete report by strata.
BLD-Conference2/22/20082/26/20082/26/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/22/2008 at 8:20:22 AM. Contact: ###-####. meet with engineer/ken howl/ and contractor/ have investagation demo in progress will reconven when ready.
BLD-Aging Inspection2/1/20082/1/20082/6/2008 NR
DetailsJim Storey
talked with contractor office. they said they would call back as to if they where going to proceed with the work or not. owner of building had a hold on the project was the understanding that i recieved and did not get a return call to confirm.
Telephone call  10/30/2007 DONE
Recieved phone call from Ken Hall about plan review report. He offered infromation about the history of the building. He claims They have had problems with the water infiltration since day one, he stated they have conducted several projects to patch the leaks in the rubber membrain, he also said he realized there was more leaks and is still making efforts to repair them. He was calling about the disagreement of the extent of the damages. He believes the damages are isolated and does not feel it is neccissary to remove all the sheet rock from the cieling. I explained I don't feel comfortable with that and am adimate about removing all the sheet rock to examain the full extent of damages. I directed him to George Slain with any further questions.(Oct 30, 2007 @ 9:15a.m.)
Telephone call  10/29/2007 DONE
Recieved call from Ken Hall(oct 26, 2007 @ 4:32 pm. Return phone call at 9:45 am on oct 29, 2007. Left message that building was not declared a dangerous building. It was defined as one for plan review purposes. Also informed him to call with any additional questions or concerns.
Issue PAID IN FULL permit  10/24/2007 DONE
Plan assigned to (TLW)9/28/2007 10/22/2007 DONE
Routing - PLAN CHECK10/22/2007 10/22/2007 PASS
Passed with conditions/ notice of dangerous building attached to front of plans and within plan review report.
Print Pending Permit.LaserJet4  10/22/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/22/2007 DONE
Case Summary (BLD)  10/22/2007 DONE
Inspection Record Card- Bld  10/22/2007 DONE
Telephone call  10/22/2007 DONE
t/c w mark sanders at ###-#### - permit ready and fees given
Permit Ready to Issue  10/22/2007 DONE
Routing - PLAN CHECK9/28/2007 10/18/2007 FAIL
1st review completed  10/18/2007 FAIL
Pending Assignment by MYS9/14/2007 9/28/2007 DONE
9/28/2007 12:03:18 MYS - activity updated through activity BLDA185 from case BLD07-02488.
Plans ACCEPTED BY PLAN TECH  9/17/2007  
Application received  9/14/2007  
Recd Pcfee & Taken To Pln CK  9/14/2007 DONE