Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/4/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 6/30/2008 | 6/30/2008 | 8/11/2008 | | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 6/30/2008 | 6/30/2008 | 6/30/2008 | P | PASS |
Jim Storey
|
|
|
|
Case Summary (BLD) | | | 6/26/2008 | | |
|
|
|
|
BLD-Aging Inspection | 6/16/2008 | 6/16/2008 | 6/16/2008 | | PART |
Jim Storey
|
|
|
pending others
|
PubWorks Occupancy Approval | 6/11/2008 | 6/11/2008 | 6/9/2008 | | DONE |
|
|
|
Signed permanent occupancy R. Rokovitz.
|
BLD-Foundation | 3/7/2008 | 3/10/2008 | 3/10/2008 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/7/2008 at 4:32:59 PM. Contact: ###-####. pad ft for storage bld wip to cover with si.
|
Inspection Record Card- Bld | | | 1/25/2008 | | DONE |
|
|
|
|
Telephone call | | | 1/25/2008 | | DONE |
|
|
|
lft vm with sam holliger ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 1/25/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/25/2008 | | DONE |
|
|
|
|
Routing - PLANNING | 1/23/2008 | | 1/24/2008 | | PASS |
Matthew A Halitsky
|
|
|
This approval does not include the front entrance changes per DRH07-00417.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/24/2008 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 9/17/2007 | | 1/24/2008 | | PASS |
Tim L. Woodard
|
|
|
1/24/2008 14:44:52 MYS - activity updated through activity BLDA022 from case BLD07-02493.
|
Plan resubmittals received | | | 1/23/2008 | | |
|
|
|
Received 1 cover transmittal and 2 copies of the following sheets-TI, GRD-1, GRD-2, DRN, DT-1, SWP3 and taken to Brian Murphy's desk 1-23-08 @ 3:43pm BAS
|
Routing - PUBLIC WORKS GRADING | 1/14/2008 | | 1/23/2008 | | PASS |
Beverly Hall
|
|
|
|
Plan resubmittals received | | | 1/23/2008 | | |
|
|
|
Received 1 cover transmittal and 5 copies of sheets TI, GRD-1, GRD-2, DRN, DT-1,SWP3 and inserted into bld07-02493 and bld07-02932 and taken to Brian Murphy///1-23-08 @ 1:50pm BAS
|
Application received | | | 1/23/2008 | | DONE |
|
|
|
|
Routing PW Drainage | 1/23/2008 | | 1/23/2008 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 1/23/2008 | | 1/23/2008 | | PASS |
Beverly Hall
|
|
|
|
Plan resubmittals received | | | 1/8/2008 | | |
|
|
|
Originally hand delivered to Public Works 4th floor on 12/27/07 and brought to me on 12/31/07--Received 1 cover transmital 2 copies of drainage report, 2 copies of storm water facilities, 5 copies of sheets TI, GRD-1, GRD-2, DRN, DT-1, SWPP3 and taken to Tim Woodard///1/8/08 @ 3:05pm BAS
|
Routing - PLAN CHECK | 12/19/2007 | | 1/4/2008 | | PEND |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 10/16/2007 | | 12/19/2007 | | PEND |
|
|
|
routed to todd tucker for further review
|
Routing - PLANNING Land Div | 12/19/2007 | | 12/19/2007 | | PASS |
Todd Tucker
|
|
|
The Condo Plat was amended to reflect the building plans. Revised condo plat was placed in file (SUB07-00021).
|
1st review completed | | | 10/16/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 10/11/2007 | | 10/16/2007 | | PASS |
|
|
|
Attached IFC comments to plans.
|
Routing - PLAN CHECK | 9/27/2007 | | 10/11/2007 | | PASS |
|
|
|
Tim Woodard--Passed not looked at for accessibility.
|
Routing - Erosion and Sediment | 9/26/2007 | | 9/27/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 9/18/2007 | | 9/26/2007 | | FAIL |
|
|
|
|
Routing PW Drainage | 9/18/2007 | | 9/26/2007 | | FAIL |
Brian Murphy
|
|
|
NO DRAINAGE REPORT NO GEOTECH
|
Routing PW Sewer Rating | 9/26/2007 | | 9/26/2007 | | PASS |
|
|
|
|
Routing - Addressing | 9/18/2007 | | 9/18/2007 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 9/17/2007 | | 9/18/2007 | | FAIL |
|
|
|
Prior to issuance of a building permit, a revised condominium drawing showing the change to Unit #1 on the Market Street Warehouse Condominiums shall be submitted to PDS Subdivision Staff. Prior to Final Approval of the ramp, the Condominium must be recorded. Talked to Wes Steele on 9/18/07.
|
Plans ACCEPTED BY PLAN TECH | | | 9/17/2007 | | |
|
|
|
|
Pending Assignment by MYS | 9/17/2007 | | 9/17/2007 | | DONE |
|
|
|
9/17/2007 11:45:40 LEG - activity updated through activity BLDA185 from case BLD07-02493.
|
Application received | | | 9/14/2007 | | |
|
|
|
|
Routing - PLANNING | 1/4/2007 | | 1/9/2007 | | FAIL |
|
|
|
DRH07-00417 Matt H.
Conditions of DR approval not met.
|