Permit Information
Permit NumberBLD07-02576
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO
Site Address 199 N CAPITOL BLVD Unit: 300
Project NameWASHINGTON MUTUAL BLDG
Customer Number 
ePlanReviewNo
Description
(RETAIL WEST - WASHINGTON MUTUAL CAPITOL PLAZA BUILDING - STE 300) This building is fire sprinklered for high-rise. To create a 1,745 square foot office tenant space on the 3rd story of a high-rise building. Work is to include interior nonbearing walls, interior doors, interior windows, millwork, and finishes. Barriers will be constructed on the terrace for egress reasons. In addition, to create an entrance into a separate future tenant space from the existing common corridor. Work is to include a 20 minute door and sidelight assembly in a 1-hr corridor wall. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD6/6/20086/6/20086/25/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Telephone call  6/25/2008 DONE
DetailsCathy Brown
lft vm with michael ###-#### regarding the final values
Second Notice BLD4/23/20084/23/20086/6/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 2/27/20084/23/2008 DONE
(F) Reprint permit  3/3/2008 DONE
Permanent Occupancy  2/27/2008 DONE
BLD-Final2/25/20082/26/20082/26/2008APASS
DetailsDave Hannah
kevin Phone #: ###-#### ok for perm occ
FIRE-Final Inspection2/20/20082/20/20082/20/2008APASS
DetailsForrest France
Fire life safety is acceptable pending installation of door hardware and signage at the east terrace door per review comments-to be complete prior to structural final as discussed. PFE has been certified, remainder of life safety items okayed.
BLD-Final2/19/20082/19/20082/20/2008PNR
DetailsDave Hannah
kevin Phone #: ###-#### needs fire sign offs
FIRE-Final Inspection2/19/20082/19/20082/19/2008PNR
DetailsForrest France
Need fire alarm permit final.
BLD-Final2/14/20082/19/20082/19/2008ACANC
DetailsDave Hannah
kevin Phone #: ###-#### cancelled and resc afternoon
FIRE-Final Inspection2/14/20082/15/20082/15/2008PFAIL
DetailsForrest France
Need amendments to the fire alarm system completed and remainder of finishes in place for fire life safety acceptance.
BLD-Framing/Rough-in2/4/20082/4/20082/4/2008PPART
DetailsDave Hannah
kevin Phone #: ###-#### ok to cover ceiling
BLD-Framing/Rough-in1/17/20081/17/20081/17/2008PPART
DetailsDave Hannah
kevin Phone #: ###-#### coorador door and old shaft ok to cover
BLD-Framing/Rough-in1/2/20081/3/20081/4/2008APART
DetailsDave Hannah
Kevin; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt floor fire stopping ok
BLD-Framing/Rough-in12/21/200712/24/200712/24/2007APASS
DetailsDave Hannah
Kevin; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to cover walls
BLD-Framing/Rough-in12/21/200712/21/200712/21/2007PFAIL
DetailsDave Hannah
kevin Phone #: ###-#### needs to fire proof holes in floor
BLD-Conference12/10/200712/11/200712/11/2007APASS
DetailsDave Hannah
Keven PLease call 10 min before going out Phone #: ###-####
Issue PAID IN FULL permit  11/14/2007 DONE
Print Occupancy Form  11/7/2007 DONE
Telephone call  11/7/2007 DONE
t/c w margie kennedy at ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  11/7/2007 DONE
1st review completed  11/6/2007 PASS
Routing - PLAN CHECK11/6/2007 11/6/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/6/2007 DONE
Plan assigned to (CJW)10/4/2007 11/6/2007 PASS
11/6/2007 16:03:55 CJW - activity updated through activity BLDA022 from case BLD07-02576.
Routing - FIRE11/5/2007 11/6/2007 PASS
Attached IFC review comments to plans.
Routing - PLAN CHECK10/5/2007 11/5/2007 PASS
The IBC plan review was started on October 31, 2007 and was finished on November 5, 2007. The drawings were approved with "red lines". See the plan review report.
Routing - PUBLIC WORKS10/4/2007 10/5/2007 PASS
Routing PW Sewer Rating10/5/2007 10/5/2007 PASS
Pending Assignment by MYS9/28/2007 10/4/2007 DONE
10/4/2007 12:33:12 MYS - activity updated through activity BLDA172 from case BLD07-02576.
Plans ACCEPTED BY PLAN TECH  10/1/2007  
Application received  9/28/2007  
Recd Pcfee & Taken To Pln CK  9/28/2007