(F) Reprint permit | | | 10/6/2008 | | |
|
|
|
|
Second Notice BLD | 4/23/2008 | 4/23/2008 | 5/15/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 3/7/2008 | 3/7/2008 | 4/23/2008 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 3/6/2008 | 3/7/2008 | 3/7/2008 | A | PASS |
Jim Sly
|
|
|
ron Phone #: ###-#### C/C issued
|
DOC - Permit Finaled | 3/7/2008 | 3/7/2008 | 3/7/2008 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 3/3/2008 | 3/4/2008 | 3/4/2008 | A | PART |
Mike Jordan
|
|
|
ron Phone #: ###-####. Will sign off as soon as shell and core is signed off. Need letter from special insp. agency for shell and core construction.
|
FIRE-Final Inspection | 3/3/2008 | 3/3/2008 | 3/3/2008 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 2/27/2008 | 2/28/2008 | 2/28/2008 | A | FAIL |
Troy Cobbley
|
|
|
The shell permit has not been finaled yet. The on site contact did not have drawings or notes for the shell permit so I could not perform an inspection. The building address needs to be installed so that it faces the named street. When shell permit is finaled and the address provided this tenant permit life safety inspection can be passed..
|
BLD-Other | 2/15/2008 | 2/19/2008 | 2/19/2008 | A | PASS |
Jim Sly
|
|
|
ron Note: ceiling grid Phone #: ###-####
|
BLD-Conference | 2/14/2008 | 2/14/2008 | 2/14/2008 | P | NR |
Jim Sly
|
|
|
Need all req finals after shell/core final.
|
BLD-Conference | 2/14/2008 | 2/14/2008 | 2/14/2008 | P | CANC |
Jim Sly
|
|
|
Notified Ron that shell needs to be finaled B 4 TI can be finaled.
|
BLD-Energy code compliance | 12/26/2007 | 12/27/2007 | 12/27/2007 | P | PASS |
Jim Sly
|
|
|
ron Phone #: ###-####
|
BLD-Framing/Rough-in | 12/21/2007 | 12/21/2007 | 12/21/2007 | P | PASS |
Jim Sly
|
|
|
ron Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/13/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/1/2007 | | 11/2/2007 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 11/2/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/2/2007 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/2/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/2/2007 | | DONE |
|
|
|
|
Telephone call | | | 11/2/2007 | | DONE |
|
|
|
left vm for joe bruce at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 11/2/2007 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 10/16/2007 | | 11/2/2007 | | DONE |
|
|
|
|
Routing - FIRE | 10/31/2007 | | 11/1/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
1st review completed | | | 11/1/2007 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/17/2007 | | 10/31/2007 | | PASS |
|
|
|
Per redlines and plan review report.
|
Routing - PUBLIC WORKS | 10/16/2007 | | 10/17/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 10/16/2007 | | 10/16/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 10/3/2007 | | 10/16/2007 | | DONE |
|
|
|
10/16/2007 10:51:15 MYS - activity updated through activity BLDA185 from case BLD07-02614.
|
Plans ACCEPTED BY PLAN TECH | | | 10/4/2007 | | |
|
|
|
|
Application received | | | 10/3/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/3/2007 | | DONE |
|
|
|
|