BLD-Final | 5/22/2008 | 5/22/2008 | 5/22/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/22/2008 at 7:58:35 AM. Contact: ###-####.
|
DOC - Permit Finaled | 5/22/2008 | 5/22/2008 | 5/22/2008 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 1/16/2008 | 1/17/2008 | 1/17/2008 | A | PASS |
Mike Jordan
|
|
|
jerry - insulation Phone #: ###-####. All energy code issues resolved. ok to cover.
|
BLD-Framing/Rough-in | 1/14/2008 | 1/15/2008 | 1/15/2008 | A | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/14/2008 at 4:23:10 PM. Contact: ###-####. Framing issues corrected. Needs to complete airseal package at tub downstairs, and all electrical boxes at ceiling. Also needs more baffels for attic ventilation.
|
BLD-Framing/Rough-in | 1/4/2008 | 1/7/2008 | 1/7/2008 | A | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/4/2008 at 12:18:24 PM. Contact: ###-####. Complete nairseal package, provide 1/2" ASTM A307 bolts on scab pice on A03 truss as noted on engineering, Provide 5 rows of nailing on bottom chord of D3 truss as noted on engineering. c/n posted. ok to insul.
|
BLD-Foundation | 11/14/2007 | 11/14/2007 | 11/14/2007 | P | PASS |
Mike Jordan
|
|
|
sebastin Phone #: ###-####. Interior column pad footing in garage ok.
|
BLD-Foundation | 11/13/2007 | 11/13/2007 | 11/13/2007 | P | FAIL |
Mike Jordan
|
|
|
Stem wall; Sebastian at ###-####. column pad footing for garage not as per plan. Needs to be removed and placed as per plan. Will also require reinspection. Jonathan with Welch custom homes was notified.
|
BLD-Footing | 11/8/2007 | 11/9/2007 | 11/9/2007 | P | PART |
Mike Jordan
|
|
|
sabanez Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/5/2007 | | DONE |
|
|
|
|
Telephone call | | | 11/2/2007 | | DONE |
|
|
|
t/c w jonathan welch at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 11/2/2007 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/2/2007 | | |
|
|
|
|
Routing Walk-In (BLD) | 10/24/2007 | 10/24/2007 | 11/1/2007 | P | DONE |
|
|
|
11/1/2007 14:05:13 PEP - activity updated through activity BLDA022 from case BLD07-02639.
|
Case Summary (BLD) | | | 11/1/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/1/2007 | | |
|
|
|
|
Routing - PLAN CHECK | 10/15/2007 | | 11/1/2007 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/15/2007 | | 10/15/2007 | | PASS |
|
|
|
|
Routing - PLANNING | 10/12/2007 | | 10/15/2007 | | PASS |
|
|
|
Okay per revised plans; 30' rear yard setback required. 15' setback required on southern property line, as shown on revised site plan.
|
Routing - PLANNING | 10/5/2007 | | 10/9/2007 | | FAIL |
|
|
|
Routed to Cody R. (CUP06-00073)
Received Plans on 10/8/07. Failed Review. A 30' setback is required along the eastern property line. Spoke w/ Jonathan Welch at 8:45 a.m. Requested 2-full size and 1-reduced site plan.
|
Routing - Addressing | 10/5/2007 | | 10/5/2007 | | PASS |
|
|
|
|
Application received | | | 10/5/2007 | | |
|
|
|
|