Permit Information
Permit NumberBLD07-02677
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 1655 S VINNELL ST
Project Name 
Customer Number 
ePlanReviewNo
Description
SC Office - (Shell & Core) - To construct a new 5,250 square foot, one story, wood framed office shell and core building, including a 180 sq. ft. wood trellis and related site improvements. The core areas include to restrooms with a separate shower room, a fire riser room and mechanical room on the west side of the building and a unisex restroom centrally located near the east side of the building. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval1/14/20101/14/20101/14/2010 DONE
DetailsTiffany Lowery
Third Notice BLD9/22/20089/22/200810/30/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice5/30/20085/30/20088/11/2008 DONE
DetailsMike Jordan
BLD-Final5/30/20085/30/20085/30/2008PPASS
DetailsMike Jordan
Keith Phone #: ###-####
DOC - Permit Finaled5/30/20085/30/20085/30/2008PPASS
DetailsMike Jordan
Letter of compliance issued.
BLD-Final5/29/20085/30/20085/30/2008AFAIL
DetailsMike Jordan
Keith, please call 30 minutes prior; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Needs to install grab bars in ada roll in shower, lower seat at shower as well.
FIRE-Final Inspection5/28/20085/29/20085/29/2008PPASS
DetailsTroy Cobbley
Fire life safety completed. KR
FIRE-Alarm Testing5/28/20085/29/20085/29/2008PPASS
DetailsTroy Cobbley
Fire life safety completed. See fir08-00201 for fire alarm testing. KR
FIRE-Final Inspection5/27/20085/28/20085/28/2008AFAIL
DetailsTroy Cobbley
Life safety completed . Can not final shell permit until sprinkler flow switch is repaired. KR
BLD-Energy code compliance3/31/20083/31/20083/31/2008PPASS
DetailsMike Jordan
keith Phone #: ###-####
BLD-Framing/Rough-in3/31/20083/31/20083/31/2008PPASS
DetailsMike Jordan
keith Phone #: ###-####. All issues reolved. ok to insul.
BLD-Framing/Rough-in3/28/20083/28/20083/28/2008PFAIL
DetailsMike Jordan
Keith; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Needs to repair cut top plates and studs, fireblock mech. chase.
BLD-Framing/Rough-in3/25/20083/26/20083/26/2008AFAIL
DetailsMike Jordan
keith Phone #: ###-####. No approved plans, needs fire insp. and mech.
BLD-Other2/5/20082/5/20082/5/2008PPART
DetailsMike Jordan
keith Note: shear nail Phone #: ###-####. Exterior shear only. Need documentation from engineer noting staples ok for roof diaphragm. Also simpson CS16 straps not yet installed.
BLD-Footing12/21/200712/21/200712/21/2007PPASS
DetailsMike Jordan
steve Phone #: ###-####
BLD-Footing12/20/200712/20/200712/20/2007PPART
DetailsMike Jordan
BLD-Footing12/19/200712/21/200712/20/2007PCANC
DetailsMike Jordan
steve Phone #: ###-####
(F) Reprint permit  12/19/2007  
Inspector's copy Bld permit  12/18/2007 DONE
Inspection Record Card- Bld  12/18/2007 DONE
Telephone call  12/18/2007 DONE
left vm for wes steele at ###-#### -permit ready and fees given - also need ACHD receipt
Permit Ready to Issue  12/18/2007 DONE
Issue PAID IN FULL permit  12/18/2007 DONE
Plan assigned to (JCM)10/11/2007 12/17/2007 PASS
12/17/2007 13:34:20 JCM - activity updated through activity BLDA022 from case BLD07-02677.
Routing - PUBLIC WORKS12/14/2007 12/17/2007 PASS
Routing - PLAN CHECK12/17/2007 12/17/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/17/2007 DONE
Routing PW Solid Waste12/17/2007 12/14/2007 PASS
Routing - PLAN CHECK12/13/2007 12/14/2007 PASS
Plan Reviewer's activity  12/14/2007 PASS
Reviewed and approved revised plans with attached plan clarifications. JCM
Routing - PLAN CHECK12/12/2007 12/13/2007  
Plan resubmittals received  12/13/2007 DONE
received 1 transmittal,1 drainage easement,1 dumpster easement,and 2 copies of sheets 3,5,SN . inserted by Travis with Dave Evans Construction ///DLD
Telephone call  12/13/2007 DONE
Spoke with Travis, Dave Evan construction, regarding the dedicated Fire Service supply line to be installed. Travis confirmed the Fire service will have a dedicated service. An emailed site plan has been recieved showing the service line.
Additional plans submitted  12/13/2007 DONE
Recieved pdf showing dedicated fire service line.
Routing - FIRE12/13/2007 12/13/2007 PASS
Attached updated IFC review comments to plans.
Routing - FIRE12/10/2007 12/12/2007 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  12/12/2007 FAIL
Failed P.W., Plan Check, and Fire.
Routing - PLAN CHECK12/6/2007 12/10/2007 FAIL
Plan resubmittals requested  12/10/2007 DONE
E-mailed the architect and applicant a copy of the plan review requesting revisions. JCM
Routing PW Sewer Rating12/4/2007 12/6/2007 PASS
Routing - PUBLIC WORKS11/28/2007 12/6/2007 FAIL
Routing PW Solid Waste12/4/2007 12/5/2007 FAIL
No trash enclosure is located on the parcel and not cross access agreement has been provided.

Peter McCullough ###-####
Plan resubmittals received  12/4/2007  
Received two copies of O & M Manuals; taken to Brian Murphy
Routing PW Drainage12/4/2007 12/4/2007 PASS
Plan resubmittals received  12/4/2007 DONE
received 1 transmittal sheet, and 2 copies of Operation and Maintance Manual taken to Johh M.
Routing - PLAN CHECK11/20/2007 11/28/2007  
Routing - PLUMBING11/13/2007 11/20/2007 PASS
per plans and 2003 upc
Plan resubmittals received  11/13/2007  
Recieved and inserted by Travis with Dave Evans Construction 1 cover letter, 2 copies of sheets 2, 3, 4, 9a, 9b, 9c, 2 new Envelope Compliance Certificate, 1 new certificate of value and taken back to John Menard///11/13/07 @ 9:40am BAS
Received Certificate of Value  11/13/2007  
Received revised cert of value
Routing - PLAN CHECK10/30/2007 11/13/2007  
John M
Routing - PLANNING10/30/2007 10/30/2007 PASS
Andrea T.
Routing - PLUMBING10/22/2007 10/30/2007 PASS
per plans and 2003 upc
Routing - Erosion and Sediment10/19/2007 10/22/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS10/11/2007 10/19/2007 FAIL
Routing PW Drainage10/12/2007 10/19/2007 FAIL
DetailsBrian Murphy
Need crossdrainage access agreement, O AND M, show existing systems
Routing PW Sewer Design10/19/2007 10/19/2007 PASS
Routing PW Street Lights10/19/2007 10/19/2007 PASS
Routing PW Sewer Rating10/19/2007 10/19/2007 PASS
Routing PW Solid Waste10/19/2007 10/19/2007 FAIL
Need to have a trash enclosure & container on the parcel. Can not use the adjacent parcels container.
Routing - PLANNING Land Div10/11/2007 10/12/2007 PASS
Plans ACCEPTED BY PLAN TECH  10/11/2007  
Plan routing begun/NEW & ADDTN  10/11/2007  
Application received  10/11/2007