*(Boise Town Square Mall)**(Mall common area remodel)* To remodel the approximately 153,195 sq ft common area portion of the mall, both 1st and 2nd levels per approved plans. Work to include, removal and replacement of all existing tile flooring, new finishes on columns, replace selective lighting, refinish guardrail and handrails, install new tile finishes on existing stairs, miscellaneous related interior finishes, This building is fully fire sprinklerd and contains a smoke evacuation system, these systems are to be maintained as originally installed. RmH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection8/9/20108/9/20108/9/2010 CANC
DetailsMike Jordan
DOC - Permit Expired8/9/20108/9/20108/9/2010PPASS
DetailsMike Jordan
Life/safety issues were inspected. Permit is expired.
Case Summary (BLD)  2/1/2010 DONE
BLD-Other10/1/200810/2/200810/2/2008APART
DetailsMike Jordan
kent - handrail Phone #: ###-####. handrails height ok. Still working on two sections. Also got testing results for impact loads on glass and handrails. ok.
BLD-Aging Inspection7/2/20087/2/20087/9/2008 PASS
DetailsMike Jordan
wip. Spoke with Kent of Camco const. to schedule insp.
Issue PAID IN FULL permit  4/1/2008 DONE
Telephone call  3/28/2008 DONE
DetailsTisha Gallop
called Dave Scarlet (Camco Const.) and told him premit is ready and fee
Plan resubmittals received  3/25/2008  
Received 3 copies of guard rail calcs and taken to Ron HIll///3-25-08 BAS
Plan resubmittals received  3/12/2008  
Received copy of email from Lisa Raney to Kent Bowman dated 2-19-08, 1 copy of perimeter guardrail post, 1 copy of guardrail post instalation instructions, 3 copies of the following sheets- Drwg1, drwg 2, drwg 3, drwg 4, drwg 5, drwg 6, drwg 7, 3 copies of calculations, date stamped and taken to Ron Hill's office 3-12-08 @ 10:38am BAS
Plan resubmittals received  3/6/2008  
DetailsRon Hill
received drawg 1thru 7 order no. R-13290-- gave plans to Ron Hill
Plan assigned to (R_H)10/23/200710/23/200712/10/2007 PASS
12/10/2007 10:47:58 RMH - activity updated through activity BLDA022 from case BLD07-02700.
Routing - PLAN CHECK11/27/2007 12/10/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/10/2007 DONE
Inspection Record Card- Bld  12/10/2007 DONE
Telephone call  12/10/2007 DONE
left vm for don perdue ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  12/10/2007 DONE
Case Summary (BLD)  11/27/2007 DONE
Routing - FIRE11/27/2007 11/27/2007 PASS
Attached IFC review comments to plans.
Routing - PLAN CHECK10/23/2007 11/27/2007 PEND
1st review completed  11/27/2007 PASS
Pending Assignment by MYS10/15/2007 10/23/2007 DONE
10/23/2007 09:06:33 LEG - activity updated through activity BLDA175 from case BLD07-02700.
Plans ACCEPTED BY PLAN TECH  10/22/2007 DONE
Received all A sheets stamped by Idaho Arch. by mail, inserted into plans
Application received  10/15/2007  
need to get A sheets stamped by Idaho state Arch. before process