First Notice | | 2/13/2008 | 3/18/2008 | | DONE |
|
|
|
|
BLD-Final | 2/12/2008 | 2/13/2008 | 2/13/2008 | A | PASS |
Tony Young
|
|
|
justin Phone #: ###-####
|
Permanent Occupancy | | | 2/13/2008 | | DONE |
|
|
|
|
BLD-Final | 1/30/2008 | 2/1/2008 | 2/1/2008 | A | PART |
Dave Hannah
|
|
|
justin Phone #: ###-#### ok for temp occ ok for perm occ after elec finals
|
FIRE-Final Inspection | 1/30/2008 | 1/31/2008 | 1/31/2008 | P | PASS |
Forrest France
|
|
|
Correction notice items are finished, fire life safety passed.
|
FIRE-Final Inspection | 1/29/2008 | 1/30/2008 | 1/31/2008 | A | FAIL |
Forrest France
|
|
|
Provide manual mag unlock device "push to exit" at one location, missing one fire extinguisher, need to final project related fire alarm permit.
|
FIRE-Final Inspection | 1/24/2008 | 1/25/2008 | 1/25/2008 | A | NR |
Forrest France
|
|
|
Project is not in condition for final life safety due to finishes underway, provide ceiling patch at the dry system riser room, need fire alarm as-built plans as discussed, EM lights and exit signs tested okay.
|
BLD-Other | 1/10/2008 | 1/14/2008 | 1/14/2008 | P | PASS |
Tony Young
|
|
|
justin Note; ceiling grid Phone #: ###-#### anop(lans)
|
BLD-Other | 1/7/2008 | 1/8/2008 | 1/8/2008 | A | PART |
Jim Sly
|
|
|
justin Note: ceiling Phone #: ###-#### East 1/2f of T I space grid OK
|
BLD-Framing/Rough-in | 11/19/2007 | 11/20/2007 | 11/20/2007 | P | PART |
Tony Young
|
|
|
justin Phone #: ###-#### suite 500 on 5th floor walls ok, need to verify more wall braces at ceiling grid inspection,, basement area not ready yet
|
Override - Parcel Holds | 11/19/2007 | 1/1/1900 | 11/19/2007 | | |
|
|
|
5th floor inpection
|
Print Occupancy Form | | | 11/19/2007 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 11/19/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/19/2007 | | DONE |
|
|
|
|
1st review completed | | | 11/16/2007 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/16/2007 | | 11/16/2007 | | PASS |
Jason Blais
|
|
|
Permit and plans approved and taken to front desk to prep for issuance.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/16/2007 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 11/16/2007 | | |
|
|
|
|
Plan assigned to (JCB) | 11/5/2007 | | 11/16/2007 | | PASS |
Jason Blais
|
|
|
11/16/2007 12:59:16 JCB - activity updated through activity BLDA022 from case BLD07-02755.
|
Routing - FIRE | 11/13/2007 | | 11/16/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
Routing - PLAN CHECK | 11/6/2007 | | 11/13/2007 | | PASS |
Jason Blais
|
|
|
Plans approved. Plan review report e-mailed to architect and building owner. Plan review report notes some minor red-lined items on the plans. No response required. Plans to route to Fire for review.
Jason Blais ###-####.
|
Telephone call | | | 11/8/2007 | | DONE |
|
|
|
Called Bryan Gilbreath of ZGA Architects to let him know a separate Tenant Improvement application is required for the space in the basement. He will modify the existing application and provide a new application via fax. The two applications can be attached to the same set of plans for review.
Jason Blais ###-####.
|
Routing PW Sewer Rating | 11/5/2007 | | 11/5/2007 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 11/5/2007 | | 11/5/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 10/19/2007 | | 11/5/2007 | | DONE |
|
|
|
11/5/2007 10:15:58 MYS - activity updated through activity BLDA184 from case BLD07-02755.
|
Plans ACCEPTED BY PLAN TECH | | | 10/19/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/19/2007 | | DONE |
|
|
|
|
Application received | | | 10/19/2007 | | |
|
|
|
|
Temporary Occupancy | 2/1/2008 | 5/1/2008 | | | |
|
|
|
|