Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD07-02761
StatusFinaled
Name WESTSIDE BODY WORKS
Site Address 3321 S FEDERAL WAY
Project NameWESTSIDE BODY WORKS
Customer Number 
ePlanReviewNo
Description
(WESTSIDE BODY WORKS) To remodel an existing 8,316 sq.ft. building for an automobile body shop per plans and DRH07-00496. This building is declared by architect as being fully sprinklered. This building was constructed as a MACO Auto Body Shop and recently occupied by Eddy's Bread Outlet , with product deliver / storage / sales and enclosed parking for delivery trucks. This remodel includes the installation of a 1,000 gallon sand and grease interceptor on the east side of the building to service the new floor drain being installed for a new vehicle indoor wash area. To remove a portion of the concrete floor to install floor drain and slope floor to drain for wash area; to add one fully accessible restroom in the main office area and construct walls to create a private office and break area; to modify lighting fixtures and switching in the office area; install a U.L. listed self contained spray painting booth with attached mixing room; add a self contained vehicle prep unit;and to provide an accessible counter / sink / controls / switches / outlets in the new break room per ICC/ANSI A117.1-98. DRH07-00496. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD6/6/20086/6/20089/4/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD4/23/20084/23/20086/6/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 3/13/20084/23/2008 DONE
Permanent Occupancy  3/13/2008 DONE
Code Occupancy Approval1/15/20081/15/20081/15/2008PPASS
DetailsJoe R Venneman
Landscaping bond for $4985 to cover all new landscaping as per BLD07-02741.
Temporary Occupancy UNPAID FEE  1/15/2008 DONE
FIRE-Final Inspection1/11/20081/14/20081/14/2008APASS
DetailsForrest France
Fire life safety passed.
BLD-Final1/11/20081/14/20081/14/2008PPASS
DetailsJim Storey
kevin Phone #: ###-####
FIRE-Final Inspection1/11/20081/11/20081/11/2008PDEFR
DetailsForrest France
kevin - fire life safety Phone #: ###-#### Rescheduled
BLD-Framing/Rough-in1/3/20081/4/20081/4/2008APASS
DetailsJim Storey
kevin - ceiling grid Phone #: ###-####
BLD-Framing/Rough-in12/11/200712/12/200712/12/2007PPASS
DetailsJim Storey
kevin Phone #: ###-####
Telephone call  12/4/2007 DONE
t/c w dale binning at ###-#### - permit ready and fees given - also need gc name, rce# and rp name
Permit Ready to Issue  12/4/2007 DONE
Issue PAID IN FULL permit  12/4/2007  
Plan assigned to (DRS)11/5/2007 12/3/2007 PASS
DetailsDan Stuart
12/3/2007 11:55:34 DRS - activity updated through activity BLDA022 from case BLD07-02761.
Routing - FIRE11/30/2007 12/3/2007 PASS
DetailsScott Arellano
Attached updated IFC review comments to plans.
Routing - PLAN CHECK12/3/2007 12/3/2007 PASS
To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  12/3/2007 PASS
Print Occupancy Form  12/3/2007 DONE
Routing - PLAN CHECK11/29/2007 11/30/2007 PEND
Resubmittals inserted into plans. Routing to fire code analyst for review. No resubmittals required.
Plan resubmittals received  11/30/2007  
Received two copies of response to Dan Stuart, two copies of response to Scott Arellano, four copies of page A-1.0, two copies of S-1.0, P-1.0, E-1.0, and one MSDS binder; taken to Dan Stuart
Routing - FIRE11/27/2007 11/29/2007 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  11/29/2007 FAIL
Failed Fire & Plan Check
Plan resubmittals requested  11/27/2007 DONE
Copy of plan review hand delivered to Dale at city office and copy e-mailed.
Routing - PLAN CHECK11/19/2007 11/27/2007 FAIL
DetailsDan Stuart
Resubmittals required. Plans routing to fire code analyst for review.
Routing - PLANNING11/19/2007 11/20/2007 PASS
Routed to plan review.
Routing - PLUMBING11/13/2007 11/19/2007 PASS
use boise city approved flammable liquids interceptor detail, attached.
Routing - Erosion and Sediment11/9/2007 11/13/2007 PASS
ESC waiver request approved with attached conditions.
Routing - PUBLIC WORKS11/5/2007 11/5/2007 PASS
Pending Assignment by MYS10/22/2007 11/5/2007 DONE
11/5/2007 10:45:44 MYS - activity updated through activity BLDA168 from case BLD07-02761.
Routing PW Sewer Rating11/5/2007 11/5/2007 PASS
Routing PW Environmental11/5/2007 11/5/2007 PASS
attached City approved oil/sediment interceptor to both plans sets. 1000 gallon size spec'd - OK
Plans ACCEPTED BY PLAN TECH  10/22/2007  
Recd Pcfee & Taken To Pln CK  10/22/2007 DONE
Application received  10/22/2007