DOC - Permit Finaled | | | 11/14/2012 | | DONE |
Tisha Gallop
|
|
|
passed final inspection and LOC issued.
|
Zoning Approval | 11/13/2012 | 11/13/2012 | 11/13/2012 | | DONE |
Andrea Tuning
|
|
|
|
Letter of compliance/Occupancy | | | 11/13/2012 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 11/8/2012 | 11/9/2012 | 11/9/2012 | P | PASS |
Dave Hannah
|
|
|
call 15 min before to meet/Eric Phone #: ###-####
|
Override - Parcel Holds | | | 11/8/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 11/8/2012 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/8/2012 | | DONE |
Tisha Gallop
|
|
|
plan mod approved and paid
|
(F) Reprint permit | | | 11/8/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | 10/31/2012 | 10/31/2012 | 11/6/2012 | | DEFR |
Carl D Madsen
|
|
|
Plans deferred to Tim W. TLW
|
Plan assigned to (TLW) | 11/6/2012 | | 11/6/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 11/6/2012 | | 11/6/2012 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 11/6/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 11/6/2012 | | DONE |
|
|
|
|
Telephone call | | | 11/6/2012 | | DONE |
Tisha Gallop
|
|
|
Called Eric Flolo and left vm plans approved but need revised cert of value for additional scope of work before know what fees due.
|
Plan Modification Accepted | | | 10/31/2012 | | DONE |
|
|
|
Plan modification for Bld07-02763 (Key Bank-1st floor-SE corner) to add to scope of work repair and replace damaged glass, granite and sandstone in area where car ran into building. Rebuild CMU wall behind granite and resue all existing salvagable material to rebuild the inside. No structural or physical changes were made. Replaced to exact specifications of original wall and window glazing; submitted on plan sheet A1.1; routed to Carl Madsen.
|
BLD-Aging Inspection | 6/19/2012 | 6/19/2012 | 6/19/2012 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/19/2012 | 3/19/2012 | 3/27/2012 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 11/30/2011 | 11/30/2011 | 11/30/2011 | | PEND |
Dave Hannah
|
|
|
|
(F) Reprint permit | | | 10/27/2011 | | DONE |
|
|
|
|
BLD-Conference | 8/30/2011 | 8/30/2011 | 8/30/2011 | P | DEFR |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/4/2011 | 8/4/2011 | 8/8/2011 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 4/11/2011 | 4/11/2011 | 4/19/2011 | | PASS |
Dave Hannah
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/28/2011 | | DONE |
Rita DeYoung
|
|
|
OK PER Bob to reopen permit and charge 2hr admin.rad
|
DOC - Permit Expired | 8/5/2010 | 8/5/2010 | 8/5/2010 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/5/2010 | 8/5/2010 | 8/5/2010 | | PASS |
Dave Hannah
|
|
|
|
Case Summary (BLD) | | | 11/17/2008 | | |
|
|
|
|
BLD-Aging Inspection | 8/11/2008 | 8/11/2008 | 8/11/2008 | | PASS |
Dave Hannah
|
|
|
exps on 10/18/08
|
Issue PAID IN FULL permit | | | 4/22/2008 | | DONE |
|
|
|
|
Telephone call | | | 4/2/2008 | | |
|
|
|
talked to dave at ###-#### to verify plans are ready & need achd approval & gc & rce
|
Plan assigned to (TLW) | 11/5/2007 | | 2/28/2008 | | PASS |
Tim L. Woodard
|
|
|
2/28/2008 10:39:22 TLW - activity updated through activity BLDA022 from case BLD07-02763.
|
Routing - PLAN CHECK | 2/27/2008 | | 2/28/2008 | | PASS |
Tim L. Woodard
|
|
|
Approval given based on ACHD and Planning approval.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/28/2008 | | DONE |
|
|
|
|
Telephone call | | | 2/28/2008 | | DONE |
|
|
|
lft vm with glancey ###-#### regarding gc/fees to picked up the bld permit
|
Permit Ready to Issue | | | 2/28/2008 | | |
|
|
|
|
Routing - PLANNING | 2/26/2008 | | 2/27/2008 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 2/22/2008 | | 2/26/2008 | | PEND |
Tim L. Woodard
|
|
|
Plans will be passed if DRH reviewer approves changes to plans.
|
Plan resubmittals received | | | 2/25/2008 | | |
|
|
|
Received transmittal and two copies of sheets A1.1, A1.2; taken to Tim Woodard
|
Routing - PLAN CHECK | 11/20/2007 | | 2/22/2008 | | PEND |
Tim L. Woodard
|
|
|
Routed to Planning.
|
Routing - PLANNING | 2/22/2008 | | 2/22/2008 | | FAIL |
Andrea Tuning
|
|
|
The applicant has not shown the approved planters on the building plans correctly. To comply with the approved CZC, the applicant will be required to eliminate the 3-foot diameter circular planters that match the downtonwn street furnishings and replace them with an original square planter that has dimensions of 2-feet by 2-feet. The planter should be located between 6 and 8 inches from the building to provide the safety protection of the outward swinging door. Andrea Tuning ###-#### 2-22-08
|
Plan resubmittals received | | | 2/19/2008 | | |
|
|
|
Received submittal, response letter, copy of Zoning Cert., document from ACHD, and three copies of sheets A1.1, A1.2; taken to Tim Woodard
|
1st review completed | | | 11/20/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 11/19/2007 | | 11/20/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
Plan Reviewer's activity | | | 11/19/2007 | | DONE |
|
|
|
Sent plan review report to david@brsarchitects.com
|
Routing - PLAN CHECK | 11/5/2007 | | 11/19/2007 | | FAIL |
|
|
|
Doors cannot swing into right of way. TLW
|
Pending Assignment by MYS | 10/22/2007 | | 11/5/2007 | | DONE |
|
|
|
11/5/2007 11:45:55 MYS - activity updated through activity BLDA185 from case BLD07-02763.
|
Routing - PLANNING | 11/5/2007 | | 11/5/2007 | | PASS |
|
|
|
Approved per DRH07-00505
|
Application received | | | 10/22/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/22/2007 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/22/2007 | | |
|
|
|
|