Permit Information
Permit NumberBLD07-02764
StatusFinaled
Name RBI VENTURES
Site Address 1311 W JEFFERSON ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(HOUSE TO OFFICE CONVERSION) To convert a 3,377 sq.ft. (1,542 s.f.-1st & 1,399 s.f.-2nd) two story dwelling with basement (436 s.f.) to office per approved plans, CUP07-00135 and DRH07-00454. Work includes modifications of interior walls and structure to provide new openings, maneuverability floor clearance for accessibility, accessible restrooms & breakroom on main floor; 1-hour stair enclosure fire barrier separation between basement and 1st floor to aleviate existing condition of three connected levels; provide second exit from the second floor; provide fully compliant accessible route from the public right-of-way & the parking area to the accessible ramp; modify door width to provide minimum clear width for new occupancy use; provide rails & handrails and hardware for code compliance, landings and directional / identification signage. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval11/13/200911/13/200911/13/2009 DONE
DetailsTiffany Lowery
Third Notice BLD9/22/20089/22/200811/21/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 5/7/20088/11/2008 DONE
BLD-Final5/7/20085/7/20085/7/2008APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/7/2008 at 6:47:06 AM. Contact: ###-####.
OK for Perm Occ.
Permanent Occupancy  5/7/2008 DONE
Telephone call  4/29/2008 DONE
Talked with Mike Belts. Discussion revealed that some of the existing door hardware had passage door hardware and an additional dead bolt that was part of the original boarding house use for individual room security. The change in occupancy would need all door hardware to comply with fire & life safety for egress from the room side. Can only have one action necessary to egress and a dead bolt is not allowed. Will need to correct hardware by removing all deadbolts so twisting of door knob will open the door or provide hardware that connects dead bolt and knob to one action which unlocks the door for egress by twisting knob or pushing down on lever. See Section 1008.1.8 IBC.
Code Occupancy Approval4/28/20084/28/20084/28/2008PPASS
DetailsMichael Garner
site inspection complete - I observed the the work has been completed according to the approved City plans and DRH07 - 00454 - PASS
FIRE-Final Inspection4/24/20084/25/20084/25/2008APASS
DetailsForrest France
Noted corrections have been completed with the exception of the EM light at the basement exit stairs and hardware at the basement and 2nd floor restrooms- these items to be verified as agreed at the structural final.
BLD-Final4/24/20084/25/20084/25/2008ANR
DetailsTony Young
Scheduled by a contractor via Hello! on 4/24/2008 at 3:42:46 PM. Contact: ###-####.
conf only w/ 410 and owner,, need to finish steps, hand rails etc,, need to verify if door hardware on existing rest rooms is ok being knobs if doors were not touched in remodel,, call into Dan S. plan reviewer
Telephone call  4/24/2008 DONE
telcon form Mike Belt, RBI Ventures trying to contact Forrest France. Reviewed and explained inspection comments. I contacted Forrest, requested he call Mike to discuss any further concerns
FIRE-Final Inspection4/21/20084/21/20084/21/2008PFAIL
DetailsForrest France
Storage at the basement level mechanical crawl space is not allowed- need to remove construction materials (paint, carpet, etc. from this area), the provided fire extinguishers are mounted too high and are missing the required current inspection/certification tags-see fire code review notes for stipulations, repair the non-functional EM light at the basement rated stair enclosure, door hardware at the 2nd floor and basement level offices and restrooms must be approved.
BLD-Framing/Rough-in3/7/20083/10/20083/10/2008APASS
DetailsTony Young
kirk Note: late afternoon Phone #: ###-####
ok to cover all
BLD-Framing/Rough-in3/7/20083/7/20083/7/2008PPART
DetailsTony Young
kirk Note: late afternoon Phone #: ###-####
ok to cover walls w/out plumbing,(ok w/ 353)
BLD-Framing/Rough-in3/4/20083/5/20083/5/2008ANR
DetailsTony Young
mike Phone #: ###-#### Note: please 1/2 hr prior to meet with
need trades 1st
FIRE-Conference2/12/20082/13/20082/13/2008PDONE
DetailsForrest France
On site conference to discuss life safety requirements and fire code review note items such as exiting door hardware, fire extinguishers, EM lighting, etc.
BLD-Conference2/8/20082/11/20082/11/2008PPASS
DetailsTony Young
please call 30 min prior to meet you, Mike ###-####
extensive conf on site about code issues,, pony wall ftgs ok for firewall
Print Occupancy Form  2/8/2008 DONE
Telephone call  2/8/2008 DONE
t/c w mike belt at ###-#### - permit ready and fees given - also need gc name, rce#, rp name and ACHD receipt
Telephone call  2/8/2008 DONE
t/c w patrick mckeegan at ###-#### - permit ready and fees given - also need gc name, rce#, rp name and ACHD receipt
Override - Parcel Holds  2/8/2008  
Permit Ready to Issue  2/8/2008 DONE
Issue PAID IN FULL permit  2/8/2008 DONE
Routing - PLAN CHECK1/18/2008 2/7/2008 PASS
DetailsDan Stuart
Resubmittals provided. To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  2/7/2008 PASS
Plan assigned to (DRS)11/5/2007 2/7/2008 PASS
DetailsDan Stuart
2/7/2008 14:04:41 DRS - activity updated through activity BLDA022 from case BLD07-02764.
Plan resubmittals received  2/6/2008  
received response letter from patrick mckeegan arch, (2) pages, also "16" pages of flush frams. also "2" sets of plans with each sheet T1.O, A1, A2, A4, & A6-- plans taken to Dan Stuart
Plan resubmittals requested  1/18/2008 DONE
Second plan review items still needing to be addressed were e-mailed to architect.
Routing - PLAN CHECK12/10/2007 1/18/2008 FAIL
DetailsDan Stuart
Items #5, #11, #15a & b, and #18 of original review were not complete in architects response to show code compliance requirements. Architect e-mailed second review items list for response with acompanying cover letter.
Plan resubmittals received  1/17/2008  
received "2" page letter for comments from patrick mckeegan arch, & "5" pages from lochsa engineering. also "2" sets of plans with each sheet of AO, A1, A2, A3, A4, SO, S1, & S2-- plans taken to Dan Stuart
Telephone call  12/10/2007 DONE
Mike Belts, owner, called to check on review progress. A copy of the plan review report went to Pat McKeegan on 12/6/07. Fire has reviewed and also failed needing fire flow data.
1st review completed  12/7/2007 DONE
failed fire & building
Routing - FIRE12/6/2007 12/7/2007 PASS
Routing - PLAN CHECK11/13/2007 12/6/2007 FAIL
Copy of plan review checklist items e-mailed to Pat McKeegan. Routing plans to fire code analyst.
Override - Parcel Holds  12/6/2007  
Plan resubmittals received  11/28/2007  
Received 2 copies of cover sheet T-0 and A-5 and inserted into plans by Patrick McKeegans office and taken back to Dan Stuart///11/28/07 @ 3:45pm BAS
Routing - PLANNING11/13/2007 11/13/2007 PASS
Diane Perkins CUP07-00135 PASS DCP
Josh Wilson DRH07-00454 PASS
Routing - PLUMBING11/8/2007 11/9/2007 PASS
if not existing provide open front seats on toilets. provide premise backow protection per building usage.
Routing - PUBLIC WORKS11/5/2007 11/8/2007 PASS
Routing - Erosion and Sediment11/8/2007 11/8/2007 PASS
ESC plan approved with attached conditions.
Routing PW Drainage11/6/2007 11/7/2007 PASS
DetailsBrian Murphy
Routing PW Solid Waste  11/6/2007 PASS
Must convert to commercial service when occupied by office. 64 or 95 gallon carts to alley.
Routing PW Sewer Rating11/6/2007 11/6/2007 PASS
Pending Assignment by MYS10/22/2007 11/5/2007 DONE
11/5/2007 12:14:40 MYS - activity updated through activity BLDA168 from case BLD07-02764.
Recd Pcfee & Taken To Pln CK  10/22/2007 DONE
Plans ACCEPTED BY PLAN TECH  10/22/2007  
Application received  10/22/2007