Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/4/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 5/28/2008 | 5/28/2008 | 8/11/2008 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 5/27/2008 | 5/28/2008 | 5/28/2008 | A | PASS |
Jim Storey
|
|
|
keith Phone #: ###-####
|
DOC - Permit Finaled | 5/28/2008 | 5/28/2008 | 5/28/2008 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 5/22/2008 | 5/23/2008 | 5/23/2008 | A | PASS |
Forrest France
|
|
|
Building shell life safety inspection passed, notified contractor to install fire lane signage per review notes prior to occupancy approval for the adjacent structure.
|
Code Occupancy Approval | 5/21/2008 | 5/21/2008 | 5/21/2008 | P | PASS |
Joe R Venneman
|
|
|
Landscaping is excellent & meets all plans specifications.
|
FIRE-Final Inspection | 5/16/2008 | 5/19/2008 | 5/19/2008 | A | FAIL |
Troy Cobbley
|
|
|
Provide city approved plans, repair the exit signs/emergency lights, provide suite numbers and repair and test the access controled egress doors on the east tenant.
|
BLD-Energy code compliance | 3/21/2008 | 3/24/2008 | 3/24/2008 | A | PASS |
Jim Sly
|
|
|
Keith; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt Soff and draftst OK
|
BLD-Framing/Rough-in | 3/18/2008 | 3/19/2008 | 3/19/2008 | A | FAIL |
Jim Storey
|
|
|
Keith Phone #: ###-#### protect membrane on soffit./ complet draft stop.
|
BLD-Framing/Rough-in | 3/3/2008 | 3/4/2008 | 3/4/2008 | A | PASS |
Jim Storey
|
|
|
keith Phone #: ###-#### roof and exterior ok for cover.
|
BLD-Footing | 1/7/2008 | 1/7/2008 | 1/7/2008 | P | CANC |
Mike Jordan
|
|
|
steve Phone #: ###-####
|
BLD-Foundation | 1/7/2008 | 1/7/2008 | 1/7/2008 | P | PASS |
Mike Jordan
|
|
|
steve Phone #: ###-####
|
BLD-Footing | 1/4/2008 | 1/4/2008 | 1/4/2008 | P | PASS |
Jim Storey
|
|
|
Steve; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
(F) Reprint permit | | | 12/19/2007 | | |
|
|
|
|
Override - People Holds | | | 12/18/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/18/2007 | | DONE |
|
|
|
|
OVERRIDE | | | 12/14/2007 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/14/2007 | | DONE |
|
|
|
|
Telephone call | | | 12/14/2007 | | DONE |
|
|
|
t/c w wes steele at ###-#### - permit ready and fees given - also need ACHD receipt
|
Override - People Holds | | | 12/14/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 12/14/2007 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/13/2007 | | DONE |
|
|
|
received 1 transmittal, and 2 copies of sheet A1.0 inserted by Travis with Dave Evans Consturction ///DLD
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/13/2007 | | |
|
|
|
|
Routing - PLAN CHECK | 12/12/2007 | | 12/13/2007 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 10/24/2007 | | 12/13/2007 | | PASS |
|
|
|
12/13/2007 16:11:10 JCM - activity updated through activity BLDA022 from case BLD07-02795.
|
Plan Reviewer's activity | | | 12/12/2007 | | PASS |
|
|
|
Reviewed and approved structural revisions. JCM
|
Routing - PLUMBING | 12/7/2007 | | 12/12/2007 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PLANNING | 12/6/2007 | | 12/6/2007 | | PASS |
|
|
|
Approved per DRH06-00393 and DRH07-00563
|
Plan resubmittals received | | | 12/3/2007 | | |
|
|
|
Received response letter from Dave Evans Construction, response letter from TRU Engineering, two copies of structural calcs, two copies of pages A1.0, 1, 2, 3A, 3C, 3D, 4, 10A, 10B, 10C; inserted by Dave Evans Const. rep. and taken back to John Menard
|
Routing - FIRE | 11/10/2007 | | 11/13/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
1st review completed | | | 11/13/2007 | | FAIL |
|
|
|
|
Plan Reviewer's activity | | | 11/10/2007 | | PASS |
|
|
|
Reviewed and approved plans as submitted. JCM
|
Routing - PLAN CHECK | 11/7/2007 | | 11/10/2007 | | PASS |
|
|
|
John Menard
|
Routing - PLUMBING | 11/6/2007 | | 11/9/2007 | | FAIL |
|
|
|
building drain locations of sewer and water lines locations in building do not match connection points on sheet sd-2 revise as required.
|
Plan resubmittals requested | | | 11/9/2007 | | DONE |
|
|
|
Faxed the applicant a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | | | 11/7/2007 | | FAIL |
|
|
|
Per DRH06-00393, the applicant was required to:
Create a pedestrian network that extends all of the way around the south side of the building.
AND
Submit a site plan showing the bicycle spaces that were required as a part of the Eighteen Undivided Subdivision and install the bicycle parking spaces with this application.
The applicant has not complied with either requirement.
|
Routing - Erosion and Sediment | 11/2/2007 | | 11/6/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.Refer to ESC07-01344 as master ESC plan.
|
Routing - PUBLIC WORKS | | | 11/2/2007 | | PASS |
|
|
|
|
Routing PW Solid Waste | 11/1/2007 | | 11/2/2007 | | PASS |
|
|
|
Trash enclosure must be 11' wide interior dimensions and have gates open 120 degrees. Noted on plans.
|
Routing PW Sewer Rating | 11/1/2007 | | 11/1/2007 | | PASS |
|
|
|
|
Routing PW Drainage | | | 11/1/2007 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/24/2007 | | 11/1/2007 | | FAIL |
|
|
|
Received comment list from the consulting structural engineer requesting revisions. JCM
|
Routing PW Sewer Design | 10/26/2007 | | 10/29/2007 | | PASS |
|
|
|
|
Routing PW Street Lights | 10/29/2007 | | 10/29/2007 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 10/25/2007 | | 10/26/2007 | | PASS |
|
|
|
Eighteen Undivided Sub Lot 13
|
Application received | | | 10/24/2007 | | |
|
|
|
|
Pending Assignment by MYS | 10/24/2007 | | 10/24/2007 | | DONE |
|
|
|
10/24/2007 13:16:02 JCM - activity updated through activity BLDA166 from case BLD07-02795.
|
Plans ACCEPTED BY PLAN TECH | | | 10/24/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/24/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/24/2007 | | DONE |
|
|
|
called Action Couriers for pick up
|