Permit Information
Permit NumberBLD07-02828
StatusFinaled
Name BOISE PROFESSIONAL MAINTANCE MGMT
Site Address 875 W MCGREGOR CT Unit: 150
Project NameFEDERAL WAY COMMERCE
Customer Number 
ePlanReviewNo
Description
(M2E POWER INC)(FEDERAL WAY COMMERCE - STE 150) To construct a lab room and a mill/lathe room in the warehouse portion of an existing 2-story office / storage tenant space of 9,926 sq.ft. ( 6,855 s.f 1st floor / 2,571 s.f. 2nd floor) per approved plans and engineering. Original tenant space constructed under BLD99-03562, EMI Co. Work to include construction of interior walls to create the 1,154 s.f prototype micro generator test lab and to create a separate 450 s.f. fabrication room making housing's for micro generators (see architects letter of explanation concerning lab and fab area use purpose attached to plans). Hot work shall be in compliance with 2003 IFC. Modification to sprinkler system requires separate application, approval & permit from fire dept. before work can be done. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD6/6/20086/6/20087/22/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD4/23/20084/23/20086/6/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 2/1/20084/23/2008 DONE
Permanent Occupancy UNPAID FEE  2/1/2008  
BLD-Final1/31/20081/31/20081/31/2008PPASS
DetailsDave Hannah
don Phone #: ###-#### ok fo perm occ
FIRE-Final Inspection1/30/20081/31/20081/31/2008APASS
DetailsTroy Cobbley
Life safety passed
Additional plans submitted  1/30/2008 DONE
New plan sheet M1.0 submitted having smoke/fire dampers originallu indicated on mechanical plans deleted from scope of work. The wall between the office and lab area is not a rated wall and opening protection is not required by code. I checked with architect Justin Touchstone to verify his intent to remove the SF dampers. He confirmed and I approved the new plan Sheet M1.0. A copy given to contractor and a copy of new sheet to records.
Plan resubmittals received  1/30/2008 PASS
New plan sheet M1.0 submitted removing the smoke/fire dampers between the office area and new lab area. Not required by code but shown on original plans by mechanical designer. Fire inspector had failed the final inspection until an alarm permit was aquired and the S/F dampers connected to existing FACP panel OR the S/F dampers were removed from plan and approved by plan review.
FIRE-Final Inspection1/25/20081/29/20081/29/2008AFAIL
DetailsForrest France
A fire alarm permit will be necessary to interconnect the new smoke detectors at the two FSD's to the FACP or provide an approved building plan modification for deletion of the dampers, need to remove the manual flush bolts at the lathe room inactive door leaf, also the fire sprinkler permit needs to be finaled prior to life safety.
FIRE-Sprinkler Rough-in1/28/20081/29/20081/29/2008AFAIL
DetailsForrest France
Mixed response heads are not allowed within the same fire area at the new lab and lathe rooms.
BLD-Other1/25/20081/28/20081/28/2008APART
DetailsJim Storey
don wilcox-drop down ceiling inspection please Phone #: ###-#### need clips or spreader bar / auto flush bolts on double doors.
BLD-Framing/Rough-in1/8/20081/8/20081/8/2008PPASS
DetailsJim Storey
don Phone #: ###-####
Print Occupancy Form  12/19/2007 DONE
Telephone call  12/19/2007 DONE
left vm for don wilcox at ###-#### - permit ready and fees given
Permit Ready to Issue  12/19/2007 DONE
Issue PAID IN FULL permit  12/19/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/18/2007 PASS
Routing - PUBLIC WORKS11/16/2007 12/18/2007 PASS
Plan assigned to (DRS)12/10/2007 12/18/2007 PASS
12/18/2007 16:39:20 DRS - activity updated through activity BLDA022 from case BLD07-02828.
Routing - PLAN CHECK12/13/2007 12/18/2007 PASS
Resubmittals of 12/17/07 inserted into plans. No further requirements. Routing to permit desk to issue.
Plan resubmittals received  12/17/2007  
received one response letter from architect, three copies of response letter from engineer, structural calcs and pages A1.1, A1.2; taken to Dan Stuart
1st review completed  12/13/2007 FAIL
Failed plan check
Routing - FIRE12/11/2007 12/13/2007 PASS
DetailsScott Arellano
Plans are approved with red line annotations. Attached IFC review comments to plans.
Routing - PLAN CHECK12/10/2007 12/11/2007 FAIL
Copy of plan review corrections e-mailed to J Touchstone. Plans routed to fire code analyst.
Plan resubmittals requested  12/11/2007 DONE
E-mailed to J. Touchstone.
Plan assigned to (R_H)11/16/2007 12/10/2007 DONE
Reasigned to Dan Stuart
Plan resubmittals received  12/5/2007  
Received letter to Ron Hill addressing the specific uses of the lab and mill areas; inserted into plans and taken back to Ron
Routing PW Environmental11/19/2007 11/19/2007 PASS
Facility operations subject to future Pretreatment inspection. No new plumbing indicated on TI plans.
Walt Baumgartner ###-####
Routing PW Sewer Rating11/19/2007 11/19/2007 PASS
Routing - Addressing11/16/2007 11/16/2007 PASS
Pending Assignment by MYS10/30/2007 11/16/2007 DONE
11/16/2007 11:55:14 MYS - activity updated through activity BLDA175 from case BLD07-02828.
Plans ACCEPTED BY PLAN TECH  10/31/2007  
Application received  10/30/2007  
Recd Pcfee & Taken To Pln CK  10/30/2007