Third Notice BLD | 12/22/2008 | 12/22/2008 | 12/31/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 11/7/2008 | 11/7/2008 | 12/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 9/24/2008 | 9/24/2008 | 11/7/2008 | | DONE |
Dave Hannah
|
|
|
|
Letter of compliance | | | 10/3/2008 | | |
|
|
|
|
Code Occupancy Approval | | | 9/29/2008 | | DONE |
Wm. Michael Meloy
|
|
|
|
Code Occupancy Approval | | | 9/26/2008 | | PASS |
Wm. Michael Meloy
|
|
|
Giraffe Enclose. Approved with the following change Removal of planters within the cage. The planters were a safety hazed to the giraffies and limited there space.
|
BLD-Final | 9/24/2008 | 9/24/2008 | 9/24/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/24/2008 at 10:55:15 AM. Contact: ###-####.
|
DOC - Permit Finaled | 9/24/2008 | 9/24/2008 | 9/24/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 9/18/2008 | 9/19/2008 | 9/20/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/18/2008 at 2:01:59 PM. Contact: ###-####. eveything inside ok but need to finish landings outside of exit doors
|
FIRE-Final Inspection | 9/18/2008 | 9/19/2008 | 9/19/2008 | A | PASS |
Forrest France
|
|
|
Life safety completed acceptable, noted landing at the SW exit to be finished when site work is complete.
|
BLD-Framing/Rough-in | 8/29/2008 | 9/2/2008 | 9/2/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/29/2008 at 12:34:13 PM. Contact: ###-####. ok to cover graf keepers area
|
BLD-Framing/Rough-in | 8/25/2008 | 8/26/2008 | 8/26/2008 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/25/2008 at 2:39:58 PM. Contact: ###-####. shed roors at giraffe expo ok to cover
|
BLD-Framing/Rough-in | 8/22/2008 | 8/25/2008 | 8/25/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/22/2008 at 1:51:59 PM. Contact: ###-####.
|
Plan resubmittals received | | | 8/5/2008 | | |
Brian Murphy
|
|
|
Per Brian Murphy ok to take in; received revised four copies of revised drainage report, geotechnical report, plan sheet C2.0; taken to Brian Murphy
|
BLD-Framing/Rough-in | 7/29/2008 | 7/30/2008 | 7/30/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/29/2008 at 2:33:45 PM. Contact: ###-####. reviewed special insp. reports on high strength bolting. steel framing ok.
|
(F) Reprint permit | | | 5/14/2008 | | DONE |
|
|
|
|
Telephone call | | | 5/13/2008 | | DONE |
|
|
|
left message w tony for andrew erstad at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 5/13/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/13/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/13/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/12/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/12/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/12/2008 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 11/1/2007 | | 5/12/2008 | | PASS |
Tim L. Woodard
|
|
|
5/12/2008 11:37:02 TLW - activity updated through activity BLDA022 from case BLD07-02836.
|
Routing - PLAN CHECK | 2/8/2008 | | 5/12/2008 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 3/3/2008 | | 5/12/2008 | | PASS |
Tim L. Woodard
|
|
|
Recieved Resubmittals for engineering comments. Plans ok to issue. TLW
|
Routing Off Site - STRUCTURAL | 4/30/2008 | | 5/8/2008 | | FAIL |
Tim L. Woodard
|
|
|
Outsource engineer has 3 comments for resubmittal.
|
Plan Reviewer's activity | | | 5/8/2008 | | DONE |
|
|
|
Sent outsource engineering comments to architect for resubmittal. TLW
|
Plan resubmittals received | | | 5/8/2008 | | |
|
|
|
Received 1 cover transmittal, 3 copies of response letter dated 5-8-08 from Pinnacle, 3 copies of sheet S1.8 and taken to Tim Woodard 5-8-08 @ 3:54pm BAS
|
Telephone call | | | 4/30/2008 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Plan resubmittals received | | | 4/29/2008 | | DONE |
|
|
|
received 1 transmittal, 3 calcs for Giraffe Barn, 3 design certification,and 3 copies of sheets A0.01,A5.50,A5.51,A5.52,A5.53,A5.54,A5.55,A5.56,A5.57,A5.58,A5.59,A5.60,S1.8,S2.1 taken to Tim W.
|
Routing PW Drainage | 3/10/2008 | | 3/11/2008 | | PASS |
Brian Murphy
|
|
|
|
Routing - PUBLIC WORKS | 3/11/2008 | | 3/11/2008 | | PASS |
Beverly Hall
|
|
|
|
Plan Reviewer's activity | | | 3/11/2008 | | DONE |
Tim L. Woodard
|
|
|
Cannot issue this one Zoo Permit. Waiting for plans and engineering for steel building. Removed sheets a2.12, a2.13, a2.32, a2.42, a3.12, and a3.13. Sheets will be issued after review is completed and engineering is sent to outsource engineer. TLW
|
Plan resubmittals received | | | 3/10/2008 | | |
|
|
|
Received five copes of sheets C2.0, C2.1, and four copies of booklet with drainage report and geotechnical report; inserted by engineering rep. and taken plans back to Tim Woodard
|
Routing - PUBLIC WORKS | 2/26/2008 | | 3/3/2008 | | FAIL |
Louise Waldorf
|
|
|
|
Routing PW Drainage | 2/26/2008 | | 2/29/2008 | | FAIL |
Brian Murphy
|
|
|
CRUSHED ASPHALT PERC, 3 DRAINAGE AREAS GOTO WHAT SYSTEMS. ELEVATIONS SLOPES TO SWALE? CALL BRIAN MURPHY ###-####
|
Routing PW Drainage | 1/31/2008 | | 2/8/2008 | | FAIL |
Brian McMahon
|
|
|
Need sand in swale detail. How is all drainage going to get to swale? Brian Murphy ###-####
|
Routing - PUBLIC WORKS | 1/31/2008 | | 2/8/2008 | | FAIL |
Louise Waldorf
|
|
|
|
Routing - PLAN CHECK | 1/30/2008 | | 1/31/2008 | | FAIL |
Tim L. Woodard
|
|
|
routed to Public works
|
Routing - FIRE | 1/29/2008 | | 1/30/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 12/10/2007 | | 1/29/2008 | | FAIL |
Tim L. Woodard
|
|
|
Structural Review comments not addressed.
|
Plan resubmittals received | | | 1/16/2008 | | DONE |
|
|
|
received 1 response letter taken to Tim W.
|
Plan resubmittals received | | | 1/11/2008 | | DONE |
|
|
|
received 5 copies of sheets C1.0,C2.0,C3.0 inserted into plans by Tony with Ersted plans taken back to Tim W.
|
Plan resubmittals received | | | 1/10/2008 | | DONE |
|
|
|
received 1 transmittal,1 food service equipment,2 drainage reports,2 review comment calcs,2 geotech reports,1 response(calcs) 2 response comments and 2 copies of sheets A0.01,A0.05,A0.06,A0.11,A0.12,A0.10,11.01,11.02,12.01,A2.12,A2.14,A2.15,A2.17,A2.18,A2.20,A2.22,A2.23,A2.26,A2.27,A2.28,A2.29,A2.35,A3.13,A3.18,A4.12,A4.15,A4.18,A5.14,A5.41,S0.2,S1.2,S1.3,S2.2,S2.3,S3.3,SS4.1,S4.2,S4.3,E2.4 AND 5 copies of sheets C1.0,C1.1,C1.2,C2.0,C2.1,C3.0,C4.0 - resubmittals inserted by Tony and Matt with Erstad plans taken back to Tim W.
|
Routing - FIRE | 12/4/2007 | | 12/10/2007 | | FAIL |
|
|
|
Attached IFC review comments to plans. Emailed and faxed resubmittal items to architect.
|
1st review completed | | | 12/10/2007 | | FAIL |
|
|
|
Failed structural, drainage and fire.
|
Routing Off Site - STRUCTURAL | 11/1/2007 | | 12/5/2007 | | FAIL |
|
|
|
Corrections recieved from outsource engineer Nov 16, 2007
|
Routing - PLAN CHECK | 11/16/2007 | | 12/4/2007 | | FAIL |
Tim L. Woodard
|
|
|
Tim Woodard Need plans for steel building.
|
Routing - PLUMBING | 11/8/2007 | | 11/16/2007 | | PASS |
|
|
|
verify animal watering system seperation from domestic water supply. per plans and 2003 upc.
|
Routing - Erosion and Sediment | 11/7/2007 | | 11/8/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions. Refer to ESC07-01383 as master ESC plan for project.
|
Routing - PUBLIC WORKS | 11/7/2007 | | 11/7/2007 | | FAIL |
|
|
|
|
Routing PW Sewer Rating | 11/7/2007 | | 11/7/2007 | | PASS |
|
|
|
|
Routing PW Sewer Design | 11/6/2007 | | 11/7/2007 | | PASS |
|
|
|
11/7/07 - Spoke with Mika at Pinnacle Engineers (Brian Smith was unavailable). Informed Mika the 8-inch service need to come out of the existing manhole and a tap permit was required. I redlined the approval set of drawings with these comments. Mika said he would update his drawings accordingly in case of any future re-submittals.
|
Routing PW Environmental | 11/7/2007 | | 11/7/2007 | | PASS |
|
|
|
|
Routing PW Drainage | 11/5/2007 | | 11/6/2007 | | FAIL |
Brian Murphy
|
|
|
Swale 4 feet deep, sideslopes 4 to 1 groundwater? Runoff C .3 HOW? Type of asphalt vs Landscape?Drainage basins?
|
Routing - PLANNING Land Div | 11/2/2007 | | 11/5/2007 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/2/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/2/2007 | | DONE |
|
|
|
|
Pending Assignment by MYS | 10/31/2007 | | 11/1/2007 | | DONE |
|
|
|
11/1/2007 11:11:12 JCM - activity updated through activity BLDA185 from case BLD07-02836.
|
Telephone call | | | 11/1/2007 | | DONE |
|
|
|
called Action Couriers for pick up
|
Application received | | | 10/31/2007 | | |
|
|
|
|