Third Notice BLD | 12/22/2008 | 12/22/2008 | 12/31/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 11/7/2008 | 11/7/2008 | 12/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 10/3/2008 | 11/7/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/3/2008 | | |
|
|
|
|
BLD-Final | 9/30/2008 | 10/1/2008 | 10/1/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/30/2008 at 3:52:59 PM. Contact: ###-####.ok for perm occ
|
BLD-Final | 9/29/2008 | 9/30/2008 | 10/1/2008 | A | DEFR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/29/2008 at 3:34:59 PM. Contact: ###-####.
|
BLD-Final | 9/30/2008 | 9/30/2008 | 10/1/2008 | P | DEFR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/29/2008 at 3:34:59 PM. Contact: ###-####.
|
Letter of compliance | | | 9/26/2008 | | PASS |
Wm. Michael Meloy
|
|
|
Approcved.
|
Code Occupancy Approval | | | 9/26/2008 | | PASS |
Wm. Michael Meloy
|
|
|
|
BLD-Final | 9/18/2008 | 9/19/2008 | 9/20/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/18/2008 at 2:00:18 PM. Contact: ###-####. ok for temp occ
|
FIRE-Final Inspection | 9/18/2008 | 9/19/2008 | 9/19/2008 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed satisfactory, noted bollards at the new hydrant to be installed and verified at next site visit for project related building permits next week, hardware at the lion holding area exit okayed per review notes, inspection passed.
|
FIRE-Final Inspection | 9/17/2008 | 9/18/2008 | 9/18/2008 | P | NR |
Forrest France
|
|
|
Need project related fire sprinkler and alarm permit work tested and finaled prior to building fire life safety approvals. Discussed items needed for final including basic fire code review note conditions.
|
BLD-Other | 9/16/2008 | 9/17/2008 | 9/17/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/16/2008 at 4:28:33 PM. Contact: ###-####. ok to cover ceiling
|
BLD-Conference | 9/11/2008 | 9/12/2008 | 9/12/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/11/2008 at 10:12:20 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/30/2008 | 7/31/2008 | 7/31/2008 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/30/2008 at 4:40:23 PM. Contact: ###-####. view area ok,, also fence post holes wip,, pending special inspection
|
BLD-Framing/Rough-in | 7/24/2008 | 7/25/2008 | 7/25/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/24/2008 at 3:20:36 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/23/2008 | 7/24/2008 | 7/24/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/23/2008 at 2:39:52 PM. Contact: ###-####. I joist at roof structure in lion room ok to cover as well as hardlids in restrooms.
|
BLD-Framing/Rough-in | 7/11/2008 | 7/14/2008 | 7/14/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/11/2008 at 4:25:40 PM. Contact: ###-####. roof sheeting and straping for lion ex ok to roof
|
BLD-Framing/Rough-in | 7/10/2008 | 7/11/2008 | 7/14/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/10/2008 at 11:53:53 AM. Contact: ###-####.ceiling ok to cover
|
BLD-Conference | 5/12/2008 | 5/12/2008 | 5/12/2008 | P | PASS |
Dave Hannah
|
|
|
craig Phone #: ###-####
|
BLD-Footing | 4/7/2008 | 4/8/2008 | 4/8/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/7/2008 at 3:56:52 PM. Contact: ###-####.lion ex
|
BLD-Footing | 3/27/2008 | 3/28/2008 | 3/28/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/27/2008 at 12:22:12 PM. Contact: ###-####.
|
BLD-Footing | 3/24/2008 | 3/25/2008 | 3/25/2008 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/24/2008 at 9:58:26 AM. Contact: ###-####. bridge inbutments
|
(F) Reprint permit | | | 3/13/2008 | | |
|
|
|
|
OVERRIDE | | | 3/12/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/12/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/12/2008 | | DONE |
|
|
|
|
Telephone call | | | 3/12/2008 | | DONE |
|
|
|
t/c w cheryl at ###-#### - permit ready and fees given - also need gc name and rce#
|
Telephone call | | | 3/12/2008 | | DONE |
|
|
|
t/c w cheryl at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 3/12/2008 | | DONE |
|
|
|
|
Routing PW Drainage | 3/10/2008 | | 3/11/2008 | | PASS |
Brian Murphy
|
|
|
|
Routing - PUBLIC WORKS | 3/11/2008 | | 3/11/2008 | | PASS |
Beverly Hall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/11/2008 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 11/1/2007 | | 3/11/2008 | | PASS |
Tim L. Woodard
|
|
|
3/11/2008 11:50:13 TLW - activity updated through activity BLDA022 from case BLD07-02837.
|
Routing - PLAN CHECK | 3/3/2008 | | 3/11/2008 | | PASS |
Tim L. Woodard
|
|
|
Refer to Plan Review Report. No Occupancy permit until accessible route alternate is based by George Slane.
|
Plan resubmittals received | | | 3/10/2008 | | |
|
|
|
Received five copes of sheets C2.0, C2.1, and four copies of booklet with drainage report and geotechnical report; inserted by engineering rep. and taken plans back to Tim Woodard
|
Routing - PUBLIC WORKS | 2/26/2008 | | 3/3/2008 | | FAIL |
Louise Waldorf
|
|
|
|
Routing PW Drainage | 2/26/2008 | | 3/3/2008 | | FAIL |
Brian Murphy
|
|
|
|
Routing PW Drainage | 1/31/2008 | | 2/8/2008 | | FAIL |
Brian Murphy
|
|
|
Need sand in swale detail. How is all drainage going to get to swale? Brian Murphy ###-####
|
Routing - PUBLIC WORKS | 1/31/2008 | | 2/8/2008 | | FAIL |
Louise Waldorf
|
|
|
|
Routing - PLAN CHECK | 1/30/2008 | | 1/31/2008 | | PEND |
Tim L. Woodard
|
|
|
routed to Public works
|
Routing - FIRE | 1/30/2008 | | 1/30/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 12/10/2007 | | 1/29/2008 | | PEND |
Tim L. Woodard
|
|
|
Not all Building permits within same set of plans are approved.
|
Plan resubmittals received | | | 1/10/2008 | | |
|
|
|
received 1 transmittal,1 food service equipment,2 drainage reports,2 review comment calcs,2 geotech reports,1 response(calcs) 2 response comments and 2 copies of sheets A0.01,A0.05,A0.06,A0.11,A0.12,A0.10,11.01,11.02,12.01,A2.12,A2.14,A2.15,A2.17,A2.18,A2.20,A2.22,A2.23,A2.26,A2.27,A2.28,A2.29,A2.35,A3.13,A3.18,A4.12,A4.15,A4.18,A5.14,A5.41,S0.2,S1.2,S1.3,S2.2,S2.3,S3.3,SS4.1,S4.2,S4.3,E2.4 AND 5 copies of sheets C1.0,C1.1,C1.2,C2.0,C2.1,C3.0,C4.0 - resubmittals inserted by Tony and Matt with Erstad plans taken back to Tim W.
|
1st review completed | | | 12/10/2007 | | FAIL |
|
|
|
Failed drainage, public works and fire.
|
Routing - FIRE | 12/4/2007 | | 12/10/2007 | | FAIL |
Scott Arellano
|
|
|
Attached IFC review comments to plans. Faxed and emailed resubmittal items to architect.
|
Routing Off Site - STRUCTURAL | 11/1/2007 | | 12/4/2007 | | FAIL |
|
|
|
Recieved comments back on Nov. 16
|
Routing - PLAN CHECK | 11/16/2007 | | 12/4/2007 | | PASS |
Tim L. Woodard
|
|
|
Tim Woodard -- approved per Redlines and Plan Review Report.
|
Routing - PLUMBING | 11/8/2007 | | 11/16/2007 | | PASS |
|
|
|
see bnld07-02836
|
Routing - Erosion and Sediment | 11/7/2007 | | 11/8/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions. Refer to ESC07-01383 as master ESC plan for project.
|
Routing - PUBLIC WORKS | 11/7/2007 | | 11/7/2007 | | FAIL |
|
|
|
|
Routing PW Sewer Rating | 11/7/2007 | | 11/7/2007 | | PASS |
|
|
|
|
Routing PW Sewer Design | 11/6/2007 | | 11/7/2007 | | PASS |
|
|
|
11/7/07 - Spoke with Mika at Pinnacle Engineers (Brian Smith was unavailable). Informed Mika the 8-inch service need to come out of the existing manhole and a tap permit was required. I redlined the approval set of drawings with these comments. Mika said he would update his drawings accordingly in case of any future re-submittals.
|
Routing PW Environmental | 11/7/2007 | | 11/7/2007 | | PASS |
|
|
|
1500 gallon GI noted for new concessions stand
|
Routing PW Drainage | 11/5/2007 | | 11/6/2007 | | FAIL |
|
|
|
|
Routing - PLANNING Land Div | 11/2/2007 | | 11/5/2007 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/2/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/2/2007 | | |
|
|
|
|
Telephone call | | | 11/1/2007 | | DONE |
|
|
|
called Action Couriers for pick up
|
Pending Assignment by MYS | 10/31/2007 | | 11/1/2007 | | DONE |
|
|
|
11/1/2007 11:12:10 JCM - activity updated through activity BLDA185 from case BLD07-02837.
|
Application received | | | 10/31/2007 | | |
|
|
|
|