First Notice | | 5/1/2010 | 4/21/2010 | | DONE |
Barbara Stitt
|
|
|
|
Permanent Occupancy | | | 4/21/2010 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 2/29/2008 | 3/3/2008 | 3/3/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/29/2008 at 2:10:21 PM. Contact: ###-####. ok for perm occ
|
FIRE-Final Inspection | 2/29/2008 | 3/3/2008 | 3/3/2008 | P | PASS |
Forrest France
|
|
|
Noted items from the previous inspection have been completed including door hardware, exit sign repair and provision of a current annual inspection for the existing fire sprinkler system. Fire life safety passed.
|
FIRE-Final Inspection | 3/3/2008 | 3/3/2008 | 3/3/2008 | P | DONE |
Forrest France
|
|
|
Duplicate inspection request.
|
BLD-Final | 2/28/2008 | 2/29/2008 | 2/29/2008 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/28/2008 at 4:48:24 PM. Contact: ###-####.needs fire signoffs
|
BLD-Framing/Rough-in | 2/27/2008 | 2/28/2008 | 2/28/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/27/2008 at 4:43:31 PM. Contact: ###-####. ok to cover ceiling
|
BLD-Framing/Rough-in | 2/26/2008 | 2/27/2008 | 2/27/2008 | A | FAIL |
Dave Hannah
|
|
|
rader - ceiling grid Phone #: ###-#### remove rivits ect
|
BLD-Energy code compliance | 1/31/2008 | 2/1/2008 | 2/1/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/31/2008 at 11:06:16 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/29/2008 | 1/30/2008 | 1/30/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/29/2008 at 5:02:41 PM. Contact: ###-####. ok to cover int walls
|
BLD-Framing/Rough-in | 1/28/2008 | 1/29/2008 | 1/30/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/28/2008 at 4:14:16 PM. Contact: ###-####. ext shear walls on nw restroom area ok to cover
|
Issue PAID IN FULL permit | | | 1/8/2008 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/8/2008 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 11/16/2007 | | 1/7/2008 | | PASS |
Carl Westfall
|
|
|
1/7/2008 10:08:32 CJW - activity updated through activity BLDA022 from case BLD07-02852.
|
Routing - PLAN CHECK | 12/27/2007 | | 1/7/2008 | | PASS |
Carl Westfall
|
|
|
(1-3-08) Completed the resubmittal review. One item not resolved. Waiting for revised drawings. (1-7-08) Completed the final resubmttal review. Drawings approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/7/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/7/2008 | | DONE |
|
|
|
|
Telephone call | | | 1/7/2008 | | DONE |
|
|
|
tlk to wes steele ###-#### that permit and fees are to be picked up
|
Permit Ready to Issue | | | 1/7/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/4/2008 | | |
|
|
|
received 1 document transmittal,and 2 copies of sheets taken to Carl W.
|
Plan resubmittals received | | | 12/28/2007 | | |
|
|
|
received document transmittal & "2" sheets each of M1.O, M2.O, M3.O, M4.O, A2.1, A2.2, & A3.O-- plans taken to Carl Westfall
|
Routing - FIRE | 12/24/2007 | | 12/27/2007 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 12/27/2007 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - PLAN CHECK | 11/19/2007 | | 12/24/2007 | | FAIL |
|
|
|
The IBC plan review was started on December 21, 2007 and was finished on December 23, 2007. Revised drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 11/16/2007 | | 11/19/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 11/19/2007 | | 11/19/2007 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 11/16/2007 | | DONE |
|
|
|
Verified w/Cody Riddle that this use is allowed in a PCD/DA zone.
|
Routing - Addressing | 11/16/2007 | | 11/16/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 10/31/2007 | | 11/16/2007 | | DONE |
|
|
|
11/16/2007 13:50:07 MYS - activity updated through activity BLDA172 from case BLD07-02852.
|
Plans ACCEPTED BY PLAN TECH | | | 11/1/2007 | | |
|
|
|
|
Application received | | | 10/31/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/31/2007 | | |
|
|
|
|