Case Summary (BLD) | | | 5/8/2008 | | DONE |
|
|
|
|
BLD-Final | 3/18/2008 | 3/18/2008 | 3/18/2008 | P | PASS |
Dave Hannah
|
|
|
Jim Please call begore going out Phone #: ###-####
|
DOC - Permit Finaled | 3/18/2008 | 3/18/2008 | 3/18/2008 | P | PASS |
Dave Hannah
|
|
|
|
Code Occupancy Approval | | | 3/17/2008 | | DONE |
|
|
|
Final exterior work has been completed and meets the requirements per the DR and BLD permit
|
Code Occupancy Approval | | | 12/21/2007 | | FAIL |
|
|
|
Owner is not meeting a condition of his Certificate of Appropriateness in that he constructed the wall plane almost flush with the existing wall plane.
|
BLD-Footing | 11/14/2007 | 11/15/2007 | 11/15/2007 | A | PASS |
Dave Hannah
|
|
|
jim Phone #: ###-####
|
Routing Walk-In (Zoning) | 11/5/2007 | 11/5/2007 | 11/5/2007 | A | PASS |
|
|
|
|
Routing Walk-In (BLD) | 11/5/2007 | 11/5/2007 | 11/5/2007 | A | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2007 | | DONE |
|
|
|
|
Plan Review Report (Fail) | | | 11/5/2007 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/5/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/5/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 11/5/2007 | | |
|
|
|
WILL BE BACK WITH CHECK
|
Issue PAID IN FULL permit | | | 11/5/2007 | | DONE |
|
|
|
|
Application received | | | 11/5/2007 | | |
|
|
|
|