(CHELTON FLIGHT SYSTEM - 1111 W JEFFERSON - BASEMENT - STE 90) Minor interior remodel for a new 2,043 sq. ft. office tenant in two small areas in the basement of an existing high-rise building per approved plans. Work to include new interior finish and furniture/millwork. No modifications to the existing mechanical system, electrical system, or fire sprinkler and alarm system, A Certificate of Occupancy is to be issued when completed and approved. A separate permit under BLD07-02755 is also attached to these plans for the same tenant in a different location within the building. NOTE: This building will be fully fire sprinklered by March of 2011 per an Upgrade Agreement on file. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 2/1/20083/18/2008 DONE
First Notice 2/1/20083/18/2008 DONE
BLD-Final1/30/20082/1/20082/1/2008APASS
DetailsDave Hannah
justin Phone #: ###-####
Permanent Occupancy  2/1/2008  
FIRE-Final Inspection1/30/20081/31/20081/31/2008PPASS
DetailsForrest France
Fire life safety finaled.
FIRE-Final Inspection1/24/20081/25/20081/25/2008AFAIL
DetailsForrest France
Need to adjust alarm notification coverage due to overspacing caused by wall removal, finishes are not complete, two existing SD have had bases removed due to construction in progress.
BLD-Framing/Rough-in12/4/200712/5/200712/5/2007PPASS
DetailsTony Young
justin Phone #: 850-439
basement walls ok,, no electrical,, need revised plans showing wall in "as built place"
Print Occupancy Form  11/19/2007 DONE
Override - Parcel Holds  11/19/2007  
Issue PAID IN FULL permit  11/19/2007 DONE
Plan assigned to (JCB)11/9/2007 11/16/2007 PASS
11/16/2007 12:59:15 JCB - activity updated through activity BLDA022 from case BLD07-02755.
Routing - FIRE11/13/2007 11/16/2007 PASS
Attached IFC review comments to plans.
1st review completed  11/16/2007 PASS
Routing - PLAN CHECK11/16/2007 11/16/2007 PASS
Permit and plans approved and taken to front desk to prep for issuance.
PLANS/APPL TAKEN TO FRONT DESK  11/16/2007 PASS
Override - Parcel Holds  11/16/2007  
Routing - PLAN CHECK11/9/2007 11/13/2007 PASS
Plans approved. No plan review report as work is limited to interior finish only. Plans to route to Fire for review.
Telephone call  11/9/2007 DONE
Phone call with Scott Schoenherr. The tenant will be for office use in the main area. No other use. The rooms labeled "clean room" and "repair room" are actual offices for inspecting and doing minor repairs to small circuit boards. No industrial or hazardous type activities occurring. The detached room near the stairway will be for storage. 11/13/07 Verified uses with Bryan Gilbreath of ZGA Architects also.

Jason Blais ###-####.
Application received  11/9/2007  
Pending Assignment by MYS11/9/2007 11/9/2007 DONE
11/9/2007 10:53:16 JCB - activity updated through activity BLDA184 from case BLD07-02928.