Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD07-02932
StatusFinaled
Name STEED CONSTRUCTION
Site Address 4719 S MARKET ST Unit: 103
Project NameMARKET STREET WAREHOUSE
Customer Number 
ePlanReviewNo
Description
(SPIRIT DISTRIBUTING T.I. & ADDITION) The warehouse portion (Pods, Boise, Spirit distributing) and the office area are to be fully sprinklered with an "ESFR" system. Work includes construction of two, 3-hour fire walls to reduce the overall area of the building. One 3-hour fire wall between units #1 & #2 and a 3-hour fire wall between the two level office portion and the one story office portion with the new addition. This wall between office areas also serves to separate different types of construction. Existing tenants 'Pods' & 'Boise" each occupy approximately 1/4 of the Spirit Distributing Warehouse condominium area under previous permits. Interior demolition of offices was done under BLD07-02630. New work includes an addition of 1,360 sq. ft. to the office for a lobby, reception, tasting, kitchen & workroom. Existing 3,094 sq. ft. office & mezzanine area, 1,547 sq. ft. per level, will be remodeled, to include two new exit stairways from the mezzanine, to be used as open sales office, private offices and support areas. The 9,970 sq. ft. one level area will be rebuilt with perimeter private offices, conference and boardroom; interior to be open office, classroom, breakroom and support areas with an accessible route to all portions of the first level areas. All structural and non-structural framing in the one story, 1,360 sq. ft. office addition and remodel is to be non-combustible as part of Type IIB construction. The two level office / office mezzanine and warehouse is in Type IIIB construction and can be wood or steel framing. To fill over the interior railroad track spur system and pour a new concrete floor except at a 44' x 20' portion to remain at existing level to be used as a sprinkler system riser room. The riser room has a steel joist deck above. To install necessary landings, stairs, rails throughout project to comply with code; install new suspended ceiling grid system in office areas; upgrade electrical, mechanical, plumbing, sprinkler and alarm systems; three multi fixture accessible restroom facilities, drinking fountain and service sink in the office areas and support breakroom, accessible restrooms, janitor storage room and mezzanine level offices to serve the warehouse employees; interior and exterior finishes; (2) 3-hour, self closing or automatic closing with smoke detector activation, fire door/frame/hardware assemblies at access opening through the 3-hour wall and a walled, open to the sky patio area all per reviewed plans, red-lines on plans and all attached plan review conditions and comments of all reviewing agencies. Special Inspection required per structural engineers call-out. THIS PERMIT SCOPE DOES NOT INCLUDE APPROVAL OR INSTALLATION OF STORAGE RACKS. SEPARATE APPLICATION, ENGINEERING, PLANS, APPROVALS AND PERMITS ARE REQUIRED BEFORE RACK INSTALLATION. DRH07-00417 drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 8/22/20089/5/2008 DONE
Permanent Occupancy  8/22/2008 DONE
DetailsTisha Gallop
BLD-Final8/21/20088/21/20088/21/2008APASS
DetailsJim Storey
final ok for occ.
BLD-Final6/27/20086/30/20086/30/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/27/2008 at 3:13:30 PM. Contact: ###-####. final ok. card on site.
Case Summary (BLD)  6/26/2008  
BLD-Final6/16/20086/17/20086/17/2008ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/16/2008 at 4:36:17 PM. Contact: ###-####. need mech final/ fire chalking at 2 hr. fire barrior.
Code Occupancy Approval  6/6/2008 DONE
FIRE-Final Inspection6/3/20086/4/20086/4/2008APASS
DetailsForrest France
Fire life safety passed, egress issues at the new beer cooler to be addressed under separate permit for work in that area.
BLD-Final6/3/20086/4/20086/4/2008PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/3/2008 at 3:39:05 PM. Contact: ###-####. ok for temp occ.
BLD-Final5/29/20085/30/20085/30/2008PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/29/2008 at 4:31:37 PM. Contact: ###-####.pending fire.
FIRE-Final Inspection5/29/20085/30/20085/30/2008APART
DetailsForrest France
East office area defficiencies corrected, some items at the warehouse area remain to be repaired, also need project related fire sprinkler permit finals.
FIRE-Final Inspection5/28/20085/29/20085/29/2008AFAIL
DetailsForrest France
Project related fire sprinkler permits are not ready for final, noted new beer cooler does not provide adequate egress under door failure conditions.
FIRE-Final Inspection5/27/20085/28/20085/28/2008PNR
DetailsForrest France
Scheduled by a contractor via Hello! on 5/27/2008 at 3:54:24 PM. Contact: ###-####.
FIRE-Final Inspection5/21/20085/22/20085/22/2008AFAIL
DetailsForrest France
Several items noted including exit aisles at the north warehouse area are blocked by product storage, one ESFR head is obstructed by a roof drain, missing fire dept. key box, need to repair two exit signs, missing fire door signage and max occupant signage, need to post building address, missing doors at the new vestibule, three heads at the office area are out of adjustment, missing discharge light at the south office exit, need additional fire extinguishers at the second level warehouse office and lower level riser room, project related fire sprinkler and alarm permits need finaled, no other life safety items reviewed at this time, some phases of construction are still underway, permanent occupancy at the remodeled office area is not permitted at this time per discussion with the contractor.
BLD-Final5/16/20085/19/20085/19/2008ADEFR
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/16/2008 at 3:50:09 PM. Contact: ###-####. to pm.
BLD-Final5/15/20085/16/20085/16/2008AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/15/2008 at 3:13:38 PM. Contact: ###-####. do not occupy office area.
BLD-Energy code compliance4/30/20084/30/20084/30/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/30/2008 at 9:00:38 AM. Contact: ###-####.insulation ok
BLD-Framing/Rough-in4/25/20084/28/20084/28/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/25/2008 at 4:12:29 PM. Contact: ###-####.
BLD-Framing/Rough-in4/16/20084/17/20084/17/2008APASS
DetailsJim Storey
andy - cover Phone #: ###-#### fire collors on plm pipe ok to cover.
BLD-Final4/10/20084/11/20084/11/2008PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/10/2008 at 12:05:36 PM. Contact: ###-####.
BLD-Framing/Rough-in4/9/20084/9/20084/9/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/9/2008 at 11:16:30 AM. Contact: ###-####. exterior office framing ok to cover.
BLD-Framing/Rough-in3/24/20083/25/20083/25/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/24/2008 at 2:46:53 PM. Contact: ###-####.
BLD-Framing/Rough-in3/19/20083/20/20083/20/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/19/2008 at 12:44:41 PM. Contact: ###-####.
BLD-Conference3/5/20083/5/20083/6/2008PPASS
DetailsJim Storey
dan --call 1st before insp Phone #: ###-#### ok to cover office and first layer ok on 3 hr stud waa.
BLD-Framing/Rough-in3/5/20083/6/20083/6/2008AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/5/2008 at 5:27:58 PM. Contact: ###-####. c/n on sm office stairs rise and run/fire blocking/ 5' header sizing
Issue PAID IN FULL permit  3/5/2008 DONE
Plan assigned to (DRS)1/22/20081/22/20083/4/2008 PASS
DetailsDan Stuart
3/4/2008 11:20:01 DRS - activity updated through activity BLDA022 from case BLD07-02932.
Plan Reviewer's activity  3/4/2008 DONE
Received signed copy of clients request for Modification in accordance with Section 104.10. signature & date by Building Official, george slane and Owner/Representative
PLANS/APPL TAKEN TO FRONT DESK  3/4/2008 PASS
Print Occupancy Form  3/4/2008 DONE
Telephone call  3/4/2008 DONE
t/c w dan at ###-#### - permit ready and fees given
Permit Ready to Issue  3/4/2008 DONE
Routing - PLAN CHECK2/25/2008 3/4/2008 PASS
DetailsDan Stuart
Plan resubmittals received  2/29/2008  
received letter from habitec (2) pages-- gave one to Marlene Southard, Dan Stuart & George Slane
Routing - FIRE2/22/2008 2/25/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK2/21/2008 2/22/2008 FAIL
DetailsDan Stuart
Field structural inspector discovery that proposed 3-hour existing CMU fire wall between Unit #1 & #2 is not complete but has frame wall construction on top of CMU from lower roof of Unit #2 to top of Roof Unit #1. Need Detail from architect for three hour assembly capable of structural integrity to stand alone if fire destroys either Unit. Copy of plan review to architect and reviewed on phone with Steve Moore, associate architect. routing to fire code analyst.
Plan resubmittals received  2/22/2008  
Recieved 4 copies of GRD-! and taken to Dan Stuart to insert per his instructions///2-22-08 @ 4:34pm BAS
Plan resubmittals received  2/21/2008  
Received two copies of response letter to Dan Stuart, ACHD documents, letter addressed to George Slane, letter and supporting documents addressed to Mark Senteno, sheets A2.3, A6.2, S-A1; inserted by arch. rep. and taken back to Dan Stuart
Routing - FIRE2/6/2008 2/21/2008 PASS
DetailsSam Rogers
Sam Rogers picked up plans to take to his area to review sprinkler system and supply line issues.
*2/21/08* Plans routed back to Dan Sturart.
Case Summary (BLD)  2/7/2008  
Routing - PLAN CHECK2/1/2008 2/6/2008 PEND
DetailsDan Stuart
Plans taken by Sam Rogers to fire review area.
Plan resubmittals received  2/6/2008 DONE
received 1 document Transmittal,1 response,2 project start up for special inspections, 2 structural calcs,3 copies of sheet A8.3 AND 3 copies of sheets S-A3,A2.3,A2.4,A2.9,A3.0,A4.4,A6.2,A6.3,A8.1,A8.1A,E2.1A,E2.1L,A9.1,A9.2,A9.3,A9.4,A-.5,S1.0,S1.1,S1.2,S2.1,S3.1 taken to Dan S.
1st review completed  2/1/2008 FAIL
Failed Plan Check, Fire
Routing - FIRE1/31/2008 2/1/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
Routing - PLANNING1/25/2008 1/31/2008 PASS
DetailsMatthew A Halitsky
DRH07-000417 Matthew Halitsky

Building facade only.
Routing - PLAN CHECK1/31/2008 1/31/2008 FAIL
DetailsDan Stuart
Resubmittals required. Copy of plan review e-mailed to architect. Plans routed to fire code analyst.
Plan resubmittals requested  1/31/2008 DONE
Plan review corrections e-mailed to architect.
Print Pending Permit.LaserJet4  1/31/2008  
Case Summary (BLD)  1/31/2008  
Routing - PLUMBING1/24/2008 1/25/2008 PASS
DetailsLee Rice
per plan and 2003 UPC
Routing - Erosion and Sediment1/23/2008 1/24/2008 PASS
Details
Refer to ESC permit number ESC07-01216
Routing PW Drainage1/10/2008 1/23/2008 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS1/10/2008 1/23/2008 PASS
DetailsBeverly Hall
Plan resubmittals received  1/23/2008  
Received 1 cover transmittal and 5 copies of sheets TI, GRD-1, GRD-2, DRN, DT-1,SWP3 and inserted into bld07-02493 and bld07-02932 and taken to Brian Murphy///1-23-08 @ 1:50pm BAS
Plan resubmittals received  1/23/2008  
Received 1 cover transmittal and 2 copies of the following sheets-TI, GRD-1, GRD-2, DRN, DT-1, SWP3 and taken to Brian Murphy's desk 1-23-08 @ 3:43pm BAS
Plan assigned to (DRS)1/10/20081/10/20081/10/2008 DONE
DetailsDan Stuart
Plan routing begun/NEW & ADDTN  1/10/2008  
Pending Assignment by MYS11/9/2007 1/10/2008 DONE
DetailsBarbara Stitt
1/10/2008 09:58:06 B_S - activity updated through activity BLDA168 from case BLD07-02932.
Plans ACCEPTED BY PLAN TECH  1/10/2008 DONE
Per Dan Stuart a verbal agreement has been reached between the architect and building official. It was agreed to start routing of these plans///1-10-08 BAS
Routing - PLANNING Land Div1/10/2008 1/10/2008 PASS
DetailsJoan Johnson
ASsociated Food sub
Routing PW Sewer Rating1/10/2008 1/10/2008 PASS
DetailsLouise Waldorf
Plans ACCEPTED BY PLAN TECH  11/13/2007 FAIL
Waiting for the following items- ESC application, Approval letter from George Slane on an alternate. Called Wes with Habitec and explained I need these items and plans will not be routed until these items are received per Marlene Southard///11/13/07 @ 11:00am BAS
Application received  11/9/2007  
Recd Pcfee & Taken To Pln CK  11/9/2007