Permit Information
Permit NumberBLD07-02935
StatusFinaled
Name PRIMARY CONSTRUCTION INC
Site Address 7804 W OVERLAND RD
Project NamePANDA EXPRESS
Customer Number 
ePlanReviewNo
Description
(PANDA EXPRESS) (3-20-08 PLAN MODIFICATION TO RELOCATE THE EQUIPMENT IN THE COOK LINE AND PREP. COUNTER.) This building is NOT fire sprinklered. To remodel an existing 1,926 square foot building for a restaurant tenant. Two small additions will be constructed (98 square feet and 74 square feet). After the additions, this building will have a total floor area of about 2,098 square feet. Work is to include concrete footings, wood shear walls, steel columns, steel headers at masonry wall openings, wood beams, wood roof joists, interior nonbearing walls, 2 restrooms accessible to the disabled, grease hoods and grease ducts with duct wrap, suspended acoustical ceilings, EIFS, roof insulation and single-ply roofing membrane, and finishes. The work is required to comply with the approved drawings, with the structural calculations and design, with the plan review report, and with all applicable codes. DRH07-00448 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD8/11/20088/11/20089/4/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 5/27/20088/11/2008 DONE
FIRE-Final Inspection5/27/20085/27/20085/27/2008PPASS
DetailsForrest France
Retested non-functional HVAC unit duct detector for verification of repair, two EM lights at the kitchen and service area okayed, final fire life safety inspection passed.
Permanent Occupancy UNPAID FEE  5/27/2008  
BLD-Final5/23/20085/23/20085/23/2008PPEND
DetailsMike Jordan
gary Phone #: ###-####. Will be ok for per or temp once life/safety goes perm or temp.
FIRE-Final Inspection5/22/20085/23/20085/23/2008AFAIL
DetailsForrest France
Need to repair two non-functional EM lights at the kitchen and service area, one HVAC unit failed to shut down upon smoke detection, one EM light at the entry vestibule repaired while on site, remainder of items previously noted are acceptable.
BLD-Final5/22/20085/23/20085/23/2008ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/22/2008 at 5:05:56 PM. Contact: ###-####.
Telephone call  5/23/2008 DONE
Telcon from Gary Band, Primary Construction, ###-#### and Larry Jackson, Panda Express Const Mgr requesting rush inspection this afternoon or tomorrow. There are several Life Safety items to inspect plus a cooking hood system for which a permit was just obtained this morning. I could not accommodate due to lack of available staff qualified to do the inspections today and tomorrow would not be helpful since no staff would be available to do the building inspection or to issue a C of O.
Telephone call  5/23/2008 DONE
Fire Inspector was able to cancel another inspection and work this in this afternoon. I called Larry Jackson and advisedhim, and recommended he call the Bldg inspector to coordinate inspections, and advised that he would need to be at the City PDS office with all the permit cards signed off no later than 4:30 for someone to be available to issue a CO today.
BLD-Final5/21/20085/22/20085/22/2008PNR
DetailsJim Sly
gary - around 3:00 if possible please Phone #: ###-####
Need CDHD
FIRE-Final Inspection5/21/20085/22/20085/22/2008AFAIL
DetailsTroy Cobbley
See the city approved notes for items circled in red ink that need addressed. Items include the correct annunciators for the duct smoke detectors, address installed, emergency lighting and exit signs tested....ect. Also a suppression system has been installed and I can find no attached FIR permit for this work. Per the general contractor the installer was General Fire. I contacted Scott in our office about double fees when this permit comes in. Basically not inspection was performed but a conference was held.
Telephone call  5/22/2008 DONE
DetailsKenneth R Roule
The PDS/Fire inspector, Troy Cobbley, called to inform PDS that the cooking hood suppression system had been installed by Commercial Fire Protection without a Cooking Hood Permit.
Code Occupancy Approval5/20/20085/20/20085/20/2008APASS
DetailsScott M.Brown
OK FOR FINAL
BLD-Other5/16/20085/16/20085/16/2008PPART
DetailsMike Jordan
gary Note: grid Phone #: ###-####
BLD-Energy code compliance4/8/20084/9/20084/9/2008APASS
DetailsMike Jordan
gary Phone #: ###-####
BLD-Framing/Rough-in4/7/20084/8/20084/8/2008APART
DetailsMike Jordan
gary Phone #: ###-####. Interior steel stud framed walls, furout walls,hardlids and added structural beams for support and hoods. Needs to install three straps atr added supports for new hoods. will check on energy code.
(F) Reprint permit  4/2/2008 DONE
CHANGE STATUS TO (ISS)  4/2/2008 DONE
picked up and paid for plan mod
Plan assigned to (CJW)3/7/20083/7/20083/20/2008 PASS
DetailsCarl Westfall
3/20/2008 09:35:23 CJW - activity updated through activity BLDA022 from case BLD07-02935.
Routing - PLAN CHECK3/7/2008 3/20/2008 PASS
DetailsCarl Westfall
Approved plan modification.
PLANS/APPL TAKEN TO FRONT DESK  3/20/2008 DONE
Print Occupancy Form  3/20/2008 DONE
Telephone call  3/20/2008 DONE
Called Doug Simpson and told him that permit for plan mod is ready and fees due///3-20-08 @ 3:45pm BAS
Permit Ready to Issue  3/20/2008  
Plan Modification Accepted  3/7/2008  
plan modification excepted for bld07-02935 for the redesign of to rearrange kitchen equipement--K1.O, A1.1, A1.3, A9.3, P1.1, & E2.OP. routed to Carl Westfall
BLD-Framing/Rough-in3/6/20083/6/20083/6/2008PPART
DetailsMike Jordan
gary Phone #: ###-####
Plan resubmittals received  3/6/2008  
received "2" sheets each of K1.O, A1.1, A1.3, A9.3, P1.1, E2.OP---plans taken to Carl Westfall
BLD-Framing/Rough-in3/4/20083/5/20083/5/2008APART
DetailsMike Jordan
gary Note: if possible 8-9 Phone #: ###-####. Verified H2.5 from studs to new roof deck connection at pop outs. Noted several areas to contractor that requires fireblocking. Also noted that simpson hold straps not yet nailed. contractor to call for additional framing insp. when ri insp. are complete.
BLD-Foundation2/28/20082/28/20082/28/2008PPART
DetailsMike Jordan
gary Note: if possible early afternoon please Phone #: ###-####. Stemwalls at sw and se ends of existing blldg. wip on installing holdowns as per approved plans.
BLD-Footing2/26/20082/27/20082/27/2008APART
DetailsMike Jordan
gary Phone #: ###-####. New exterior footings at sw and se ends of existing bldg.
BLD-Footing2/25/20082/26/20082/26/2008ANR
DetailsMike Jordan
jerry Phone #: ###-####. No forms or rbar installed. Noted to contractor to reschedule inspection.
Print Occupancy Form  2/21/2008 DONE
Telephone call  2/21/2008 DONE
left vm for doug simpson at ###-#### - permit ready and fees given - also need gc name, rce#, rp name, and ACHD receipt
Telephone call  2/21/2008 DONE
t/c w paul at ###-#### - permit ready and fees given - also need gc name, rce#, rp name, and ACHD receipt
Permit Ready to Issue  2/21/2008 DONE
Issue PAID IN FULL permit  2/21/2008 DONE
(F) Reprint permit  2/21/2008 DONE
Plan assigned to (CJW)12/5/2007 2/19/2008 PASS
DetailsCarl Westfall
2/19/2008 13:38:28 CJW - activity updated through activity BLDA022 from case BLD07-02935.
Routing - PUBLIC WORKS2/15/2008 2/19/2008 PASS
DetailsBeverly Hall
Routing PW Drainage2/15/2008 2/19/2008 PASS
DetailsBrian Murphy
Routing - PLAN CHECK2/19/2008 2/19/2008  
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  2/19/2008 DONE
Routing - PLAN CHECK2/4/2008 2/15/2008 PASS
DetailsCarl Westfall
(2-7-08) Completed the resubmittal review. Drawings approved with "red lines'. Waiting for resubmittal to send them back to Public Works. (2-15-08) Sent drawings back to PW.
Routing - PUBLIC WORKS1/31/2008 2/4/2008 FAIL
Sent back to PW so Brian Murphy could look at the storm water drainage system.
Routing PW Drainage1/31/2008 2/4/2008 FAIL
DetailsBrian Murphy
No geo-tech roof drainage . Brian Murphy
Plan resubmittals received  2/1/2008  
received transmittal letter from brs, "3" page response letter from brs--also "2" sets of plans with each sheet A1.1, A2.1, A3.1, A6.2, A7.3, A7.4, & A10.1-- plans taken to Carl Westfall
Routing - PLAN CHECK1/15/2008 1/31/2008  
Waiting for resubmittal.
Routing - FIRE1/10/2008 1/15/2008 PASS
DetailsKenneth R Roule
Review IFC 2003
1st review completed  1/15/2008 FAIL
Routing - PLAN CHECK12/11/2007 1/10/2008 FAIL
DetailsCarl Westfall
The IBC plan review was started on January 3, 2008 and was finished on January 10, 2008. Revised drawings were required. See the plan review report.
Routing - PLUMBING12/6/2007 12/11/2007 PASS
DetailsBill VanDegrift
provide vent on grease interceptor on the downstream side of interceptor. note: would like to recommend that all backflow protection devices be racked on a wall together in one accessable location and then piped to equipment they serve. locate one floor sink to serve rpbp discharge and maintenance mess. this also keeps valve maintenance and certification personnel out from under feet during business hours.
Routing - PLANNING  12/11/2007 PASS
DetailsAndrea Tuning
Approved per DRH07-00448.

Andrea Tuning ###-####.
Routing - Erosion and Sediment12/11/2007 12/11/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS12/5/2007 12/6/2007 PASS
Routing - Erosion and Sediment12/6/2007 12/6/2007 FAIL
ESC plan failed. No narrative included with submittal. Notifed applicant.
Pending Assignment by MYS11/9/2007 12/5/2007 DONE
12/5/2007 09:25:16 MYS - activity updated through activity BLDA172 from case BLD07-02935.
Routing PW Environmental12/5/2007 12/5/2007 PASS
1500 gallon GI shown, OK. West Boise Sewer District jurisdiction
Recd Pcfee & Taken To Pln CK  11/9/2007 DONE
Application received  11/9/2007  
Plans ACCEPTED BY PLAN TECH  11/9/2007