Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/4/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/27/2008 | 8/11/2008 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/27/2008 | 5/27/2008 | 5/27/2008 | P | PASS |
Forrest France
|
|
|
Retested non-functional HVAC unit duct detector for verification of repair, two EM lights at the kitchen and service area okayed, final fire life safety inspection passed.
|
Permanent Occupancy UNPAID FEE | | | 5/27/2008 | | |
|
|
|
|
BLD-Final | 5/23/2008 | 5/23/2008 | 5/23/2008 | P | PEND |
Mike Jordan
|
|
|
gary Phone #: ###-####. Will be ok for per or temp once life/safety goes perm or temp.
|
FIRE-Final Inspection | 5/22/2008 | 5/23/2008 | 5/23/2008 | A | FAIL |
Forrest France
|
|
|
Need to repair two non-functional EM lights at the kitchen and service area, one HVAC unit failed to shut down upon smoke detection, one EM light at the entry vestibule repaired while on site, remainder of items previously noted are acceptable.
|
BLD-Final | 5/22/2008 | 5/23/2008 | 5/23/2008 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/22/2008 at 5:05:56 PM. Contact: ###-####.
|
Telephone call | | | 5/23/2008 | | DONE |
|
|
|
Telcon from Gary Band, Primary Construction, ###-#### and Larry Jackson, Panda Express Const Mgr requesting rush inspection this afternoon or tomorrow. There are several Life Safety items to inspect plus a cooking hood system for which a permit was just obtained this morning. I could not accommodate due to lack of available staff qualified to do the inspections today and tomorrow would not be helpful since no staff would be available to do the building inspection or to issue a C of O.
|
Telephone call | | | 5/23/2008 | | DONE |
|
|
|
Fire Inspector was able to cancel another inspection and work this in this afternoon. I called Larry Jackson and advisedhim, and recommended he call the Bldg inspector to coordinate inspections, and advised that he would need to be at the City PDS office with all the permit cards signed off no later than 4:30 for someone to be available to issue a CO today.
|
BLD-Final | 5/21/2008 | 5/22/2008 | 5/22/2008 | P | NR |
Jim Sly
|
|
|
gary - around 3:00 if possible please Phone #: ###-#### Need CDHD
|
FIRE-Final Inspection | 5/21/2008 | 5/22/2008 | 5/22/2008 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved notes for items circled in red ink that need addressed. Items include the correct annunciators for the duct smoke detectors, address installed, emergency lighting and exit signs tested....ect. Also a suppression system has been installed and I can find no attached FIR permit for this work. Per the general contractor the installer was General Fire. I contacted Scott in our office about double fees when this permit comes in. Basically not inspection was performed but a conference was held.
|
Telephone call | | | 5/22/2008 | | DONE |
Kenneth R Roule
|
|
|
The PDS/Fire inspector, Troy Cobbley, called to inform PDS that the cooking hood suppression system had been installed by Commercial Fire Protection without a Cooking Hood Permit.
|
Code Occupancy Approval | 5/20/2008 | 5/20/2008 | 5/20/2008 | A | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL
|
BLD-Other | 5/16/2008 | 5/16/2008 | 5/16/2008 | P | PART |
Mike Jordan
|
|
|
gary Note: grid Phone #: ###-####
|
BLD-Energy code compliance | 4/8/2008 | 4/9/2008 | 4/9/2008 | A | PASS |
Mike Jordan
|
|
|
gary Phone #: ###-####
|
BLD-Framing/Rough-in | 4/7/2008 | 4/8/2008 | 4/8/2008 | A | PART |
Mike Jordan
|
|
|
gary Phone #: ###-####. Interior steel stud framed walls, furout walls,hardlids and added structural beams for support and hoods. Needs to install three straps atr added supports for new hoods. will check on energy code.
|
(F) Reprint permit | | | 4/2/2008 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/2/2008 | | DONE |
|
|
|
picked up and paid for plan mod
|
Plan assigned to (CJW) | 3/7/2008 | 3/7/2008 | 3/20/2008 | | PASS |
Carl Westfall
|
|
|
3/20/2008 09:35:23 CJW - activity updated through activity BLDA022 from case BLD07-02935.
|
Routing - PLAN CHECK | 3/7/2008 | | 3/20/2008 | | PASS |
Carl Westfall
|
|
|
Approved plan modification.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/20/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/20/2008 | | DONE |
|
|
|
|
Telephone call | | | 3/20/2008 | | DONE |
|
|
|
Called Doug Simpson and told him that permit for plan mod is ready and fees due///3-20-08 @ 3:45pm BAS
|
Permit Ready to Issue | | | 3/20/2008 | | |
|
|
|
|
Plan Modification Accepted | | | 3/7/2008 | | |
|
|
|
plan modification excepted for bld07-02935 for the redesign of to rearrange kitchen equipement--K1.O, A1.1, A1.3, A9.3, P1.1, & E2.OP. routed to Carl Westfall
|
BLD-Framing/Rough-in | 3/6/2008 | 3/6/2008 | 3/6/2008 | P | PART |
Mike Jordan
|
|
|
gary Phone #: ###-####
|
Plan resubmittals received | | | 3/6/2008 | | |
|
|
|
received "2" sheets each of K1.O, A1.1, A1.3, A9.3, P1.1, E2.OP---plans taken to Carl Westfall
|
BLD-Framing/Rough-in | 3/4/2008 | 3/5/2008 | 3/5/2008 | A | PART |
Mike Jordan
|
|
|
gary Note: if possible 8-9 Phone #: ###-####. Verified H2.5 from studs to new roof deck connection at pop outs. Noted several areas to contractor that requires fireblocking. Also noted that simpson hold straps not yet nailed. contractor to call for additional framing insp. when ri insp. are complete.
|
BLD-Foundation | 2/28/2008 | 2/28/2008 | 2/28/2008 | P | PART |
Mike Jordan
|
|
|
gary Note: if possible early afternoon please Phone #: ###-####. Stemwalls at sw and se ends of existing blldg. wip on installing holdowns as per approved plans.
|
BLD-Footing | 2/26/2008 | 2/27/2008 | 2/27/2008 | A | PART |
Mike Jordan
|
|
|
gary Phone #: ###-####. New exterior footings at sw and se ends of existing bldg.
|
BLD-Footing | 2/25/2008 | 2/26/2008 | 2/26/2008 | A | NR |
Mike Jordan
|
|
|
jerry Phone #: ###-####. No forms or rbar installed. Noted to contractor to reschedule inspection.
|
Print Occupancy Form | | | 2/21/2008 | | DONE |
|
|
|
|
Telephone call | | | 2/21/2008 | | DONE |
|
|
|
left vm for doug simpson at ###-#### - permit ready and fees given - also need gc name, rce#, rp name, and ACHD receipt
|
Telephone call | | | 2/21/2008 | | DONE |
|
|
|
t/c w paul at ###-#### - permit ready and fees given - also need gc name, rce#, rp name, and ACHD receipt
|
Permit Ready to Issue | | | 2/21/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/21/2008 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/21/2008 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 12/5/2007 | | 2/19/2008 | | PASS |
Carl Westfall
|
|
|
2/19/2008 13:38:28 CJW - activity updated through activity BLDA022 from case BLD07-02935.
|
Routing - PUBLIC WORKS | 2/15/2008 | | 2/19/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Drainage | 2/15/2008 | | 2/19/2008 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 2/19/2008 | | 2/19/2008 | | |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/19/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/4/2008 | | 2/15/2008 | | PASS |
Carl Westfall
|
|
|
(2-7-08) Completed the resubmittal review. Drawings approved with "red lines'. Waiting for resubmittal to send them back to Public Works. (2-15-08) Sent drawings back to PW.
|
Routing - PUBLIC WORKS | 1/31/2008 | | 2/4/2008 | | FAIL |
|
|
|
Sent back to PW so Brian Murphy could look at the storm water drainage system.
|
Routing PW Drainage | 1/31/2008 | | 2/4/2008 | | FAIL |
Brian Murphy
|
|
|
No geo-tech roof drainage . Brian Murphy
|
Plan resubmittals received | | | 2/1/2008 | | |
|
|
|
received transmittal letter from brs, "3" page response letter from brs--also "2" sets of plans with each sheet A1.1, A2.1, A3.1, A6.2, A7.3, A7.4, & A10.1-- plans taken to Carl Westfall
|
Routing - PLAN CHECK | 1/15/2008 | | 1/31/2008 | | |
|
|
|
Waiting for resubmittal.
|
Routing - FIRE | 1/10/2008 | | 1/15/2008 | | PASS |
Kenneth R Roule
|
|
|
Review IFC 2003
|
1st review completed | | | 1/15/2008 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 12/11/2007 | | 1/10/2008 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on January 3, 2008 and was finished on January 10, 2008. Revised drawings were required. See the plan review report.
|
Routing - PLUMBING | 12/6/2007 | | 12/11/2007 | | PASS |
Bill VanDegrift
|
|
|
provide vent on grease interceptor on the downstream side of interceptor. note: would like to recommend that all backflow protection devices be racked on a wall together in one accessable location and then piped to equipment they serve. locate one floor sink to serve rpbp discharge and maintenance mess. this also keeps valve maintenance and certification personnel out from under feet during business hours.
|
Routing - PLANNING | | | 12/11/2007 | | PASS |
Andrea Tuning
|
|
|
Approved per DRH07-00448.
Andrea Tuning ###-####.
|
Routing - Erosion and Sediment | 12/11/2007 | | 12/11/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 12/5/2007 | | 12/6/2007 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 12/6/2007 | | 12/6/2007 | | FAIL |
|
|
|
ESC plan failed. No narrative included with submittal. Notifed applicant.
|
Pending Assignment by MYS | 11/9/2007 | | 12/5/2007 | | DONE |
|
|
|
12/5/2007 09:25:16 MYS - activity updated through activity BLDA172 from case BLD07-02935.
|
Routing PW Environmental | 12/5/2007 | | 12/5/2007 | | PASS |
|
|
|
1500 gallon GI shown, OK. West Boise Sewer District jurisdiction
|
Recd Pcfee & Taken To Pln CK | | | 11/9/2007 | | DONE |
|
|
|
|
Application received | | | 11/9/2007 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/9/2007 | | |
|
|
|
|