Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-03000
StatusExpired
Name HILLSIDE LANDSCAPE CONSTRUCTION
Site Address 807 N 8TH ST
Project NameST JOHNS CATHEDRAL
Customer Number 
ePlanReviewNo
Description
(ST JOHN'S CATHEDRAL - SITE IMPROVEMENTS - NORTH SIDE) To perform exterior site improvements at the north entry ONLY per approved plans and DRH07-00273. South entry was remodeled under permit BLD07-01813. Work includes installation terraced sandstone landscape and stairs to newly remodeled basement, lighting, drainage, plumbing and other landscaping of the exterior site. Sign shown on plans not reviewed or included in this permit. A sign permit should be obtained from the Planning Division. Permit for remodeling the basement is BLD07-00292. Zoning by Julie Archambeault DRH07-00273 PLAN MODIFICATION - 3-5-08 - Modification is to change a submitted and approved retaining wall from concrete to a sandstone block. Width, hieght, location, are not effected.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired5/14/20105/14/20105/14/2010PPASS
DetailsTony Young
BLD-Aging Inspection5/12/20105/12/20105/14/2010 DONE
DetailsTony Young
PubWorks Occupancy Approval12/17/200912/17/200912/17/2009 DONE
DetailsTiffany Lowery
BLD-Conference2/27/20093/2/20093/2/2009APEND
DetailsTony Young
see what status is
looks complete for the most part,, need zoning, etc.1st
BLD-Aging Inspection6/18/20086/18/20086/20/2008 PEND
DetailsTony Young
(F) Reprint permit  6/6/2008 DONE
CHANGE STATUS TO (ISS)  6/6/2008 DONE
DetailsTisha Gallop
picked up and paid for plan mod
Telephone call  6/5/2008 DONE
talked to receptionist with hillside landscape at ###-#### that permit is ready & gave $ amount
Inspection Record Card- Bld  4/8/2008 DONE
CHANGE STATUS TO (RDY)  4/8/2008 DONE
Telephone call  4/8/2008 DONE
Called Ken permit ready and fee given
Plan assigned to (TLW)3/4/2008 4/7/2008 PASS
DetailsTim L. Woodard
4/7/2008 11:09:36 TLW - activity updated through activity BLDA022 from case BLD07-03000.
Routing - PLAN CHECK4/3/2008 4/7/2008 PASS
DetailsTim L. Woodard
Tim Woodard
PLANS/APPL TAKEN TO FRONT DESK  4/7/2008 DONE
Case Summary (BLD)  4/7/2008 DONE
Print Occupancy Form  4/7/2008 DONE
Routing - PLANNING3/5/2008 4/3/2008 PASS
DetailsMatthew A Halitsky
Plan Modification
Routing - PLAN CHECK3/5/2008 3/5/2008 PEND
DetailsTim L. Woodard
Awaiting review from Planning and also need special inspection filled out. TLW
Plan Modification Accepted  3/4/2008  
Plan modification accepted for Bld07-03000 (St. John's Cathedral - Site imporvements for North side) for a change to the concrete retaining wall. In lieu of concrete, the material will be dry stacked sandstone to math that of the retaining walls on the South side. Submitted sheet S1.1and structural calculations; routed to Tim Woodard
Issue PAID IN FULL permit  1/16/2008 DONE
Inspection Record Card- Bld  1/10/2008 DONE
Telephone call  1/10/2008 DONE
left vm for joe bruce at ###-#### - permit ready and fees given
Permit Ready to Issue  1/10/2008 DONE
Plan assigned to (TLW)12/5/2007 1/9/2008 PASS
DetailsTim L. Woodard
1/9/2008 15:26:12 TLW - activity updated through activity BLDA022 from case BLD07-03000.
PLANS/APPL TAKEN TO FRONT DESK  1/9/2008 DONE
Case Summary (BLD)  1/9/2008 DONE
Routing - PLANNING12/27/2007 1/8/2008 PASS
DetailsMatthew A Halitsky
Routing - PUBLIC WORKS12/27/2007 12/27/2007 PASS
Routing PW Drainage12/19/2007 12/26/2007 PASS
1st review completed  12/17/2007 FAIL
Routing - PLAN CHECK12/12/2007 12/17/2007 PASS
DetailsTim L. Woodard
Routing - PLANNING12/11/2007 12/12/2007 FAIL
DetailsJulie Archambeault
Julie Archambeault DRH07-00273-This approval did not include any changes to the North Elevation; a Certificate of Appropriateness must be obtained for this action.
Routing - Erosion and Sediment12/10/2007 12/11/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS12/5/2007 12/10/2007 FAIL
Routing PW Sewer Design12/10/2007 12/10/2007 PASS
Routing PW Sewer Rating12/10/2007 12/10/2007 PASS
Routing PW Street Lights12/7/2007 12/7/2007 PASS
Routing PW Drainage12/6/2007 12/6/2007 FAIL
Engineer to write letter o fondation. Brian.Murphy 384- 3752
Pending Assignment by MYS11/21/2007 12/5/2007 DONE
12/5/2007 09:43:58 MYS - activity updated through activity BLDA185 from case BLD07-03000.
Plans ACCEPTED BY PLAN TECH  11/21/2007  
Recd Pcfee & Taken To Pln CK  11/21/2007 DONE
Application received  11/19/2007