Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD07-03012
StatusFinaled
Name BURNS CONSTRUCTION
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT
Customer Number 
ePlanReviewNo
Description
**(Boise Air Terminal)** (Office for K-9 UNIT)** To remodel a 479 sq ft portion of the first floor air terminal to construct an office space and holding area for security dogs per approved plans. Work to include, construction of interior noncombusible partitions, saw cut floor to install new floor drain, new 4 inch concrete flooring, installation of new 3'0"x6'8" doors, installation of fencing to construct K9 kennels, Hvac ducting and new lighting, miscellaneous related interior finishes. This building is fully fire sprinklered ANY ALTERATIONS TO THE SPRINKLER SYSTEM OR ALARM SYSTEM WILL REQUIRE A SEPARATE PERMIT, and shall be maintained per NFPA #13 as regulated by the fire department. RmH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD9/22/20089/22/200810/29/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice7/9/20087/9/20088/11/2008 DONE
DetailsJim Storey
DOC - Permit Finaled7/9/20087/9/20087/9/2008PPASS
DetailsJim Storey
BLD-Final5/13/20085/13/20085/13/2008PPART
DetailsJim Storey
plm did not pass final/ ok for temp.
BLD-Final5/9/20085/12/20085/12/2008PPASS
DetailsJim Storey
jeff - please call for access Phone #: ###-#### temp ok pending plm temp/
BLD-Final5/8/20085/9/20085/9/2008PNR
DetailsJim Storey
jeff - please call for access Phone #: ###-#### talk with jeff and rolled over for pm monday. need hvac call in for final insp.
FIRE-Final Inspection5/8/20085/8/20085/9/2008PPASS
DetailsForrest France
Fire life safety finaled.
BLD-Framing/Rough-in3/25/20083/26/20083/26/2008APART
DetailsJim Storey
jeff Note: please call 1/2 hr prior to get for inspection Phone #: ###-#### arch. to resubmit ada drawing to ron hill for aproval to remove ramp and show what is to be built to meet the exception. wall framing is ok to cover.
Issue PAID IN FULL permit  2/25/2008  
Telephone call  12/4/2007 DONE
left vm for greg allen at ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  12/4/2007 DONE
Plan assigned to (R_H)11/21/200711/21/200712/3/2007 PASS
12/3/2007 11:39:56 RMH - activity updated through activity BLDA022 from case BLD07-03012.
Routing - PLAN CHECK11/29/2007 12/3/2007 PASS
Plan resubmittals received  12/3/2007  
received letter of transmittal form hummel arch & "3" sheets each of A3.O1, & A3.O2---plans taken to Ron Hill
Case Summary (BLD)  12/3/2007 DONE
1st review completed  12/3/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/3/2007 DONE
Inspection Record Card- Bld  12/3/2007 DONE
Routing - PUBLIC WORKS11/28/2007 11/29/2007 PASS
Routing PW Sewer Rating11/29/2007 11/29/2007 PASS
Routing - Addressing11/28/2007 11/28/2007 PASS
Routing - PLAN CHECK11/28/2007 11/28/2007 FAIL
Called and Talke to Justin about resubmitting plans showing a level landing at door (002A). RMH 11-28-07
Application received  11/21/2007  
Recd Pcfee & Taken To Pln CK  11/21/2007 DONE
Plans ACCEPTED BY PLAN TECH  11/21/2007  
BLD-Final5/13/20085/14/2008 A 
DetailsJim Storey