Telephone call | | | 2/26/2009 | | DONE |
|
|
|
t/c w randy at R Squared Const. ###-#### - he said that he did not submit the initial value - that the architect did - but the final value of $57,500 is for Bld #100
|
Third Notice BLD | 1/29/2009 | 1/29/2009 | 2/2/2009 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 1/8/2009 | 1/8/2009 | 1/29/2009 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 12/23/2008 | 12/23/2008 | 1/8/2009 | | DONE |
Tony Young
|
|
|
|
BLD-Final | 12/23/2008 | 12/23/2008 | 12/23/2008 | P | PASS |
Tony Young
|
|
|
JOE Phone #: ###-####
|
DOC - Permit Finaled | 12/23/2008 | 12/23/2008 | 12/23/2008 | P | PASS |
Tony Young
|
|
|
|
Zoning Approval | 12/23/2008 | 12/23/2008 | 12/23/2008 | | PASS |
Andrea Tuning
|
|
|
|
BLD-Final | 12/19/2008 | 12/22/2008 | 12/22/2008 | A | NR |
Dave Hannah
|
|
|
joe Phone #: ###-#### needs code enfocement final and fire life safty also no signoff card or plans on site
|
BLD-Final | 11/11/2008 | 11/12/2008 | 11/12/2008 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/11/2008 at 3:44:06 PM. Contact: ###-####. parapet extensions ok
|
BLD-Framing/Rough-in | 10/22/2008 | 10/23/2008 | 10/23/2008 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/22/2008 at 1:27:35 PM. Contact: ###-####.ok tocover parapets
|
(F) Reprint permit | | | 10/20/2008 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/20/2008 | | DONE |
Barbara Stitt
|
|
|
Plan modification re-issued
|
FIRE-Final Inspection | 9/29/2008 | 10/1/2008 | 10/1/2008 | P | PASS |
Troy Cobbley
|
|
|
life safety paased
|
Plan assigned to (CJW) | 9/18/2008 | 9/18/2008 | 10/1/2008 | | PASS |
Carl Westfall
|
|
|
10/1/2008 13:44:21 CJW - activity updated through activity BLDA022 from case BLD07-03031.
|
Routing - PLAN CHECK | 9/29/2008 | | 10/1/2008 | | DONE |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/1/2008 | | DONE |
|
|
|
|
Telephone call | | | 10/1/2008 | | DONE |
|
|
|
left vm for stephanie at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 10/1/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/12/2008 | | 9/29/2008 | | PASS |
Carl Westfall
|
|
|
Finished review of plan modification. Approved.
|
Routing - PLANNING | 9/29/2008 | | 9/29/2008 | | PASS |
Andrea Tuning
|
|
|
|
Override - Parcel Holds | | | 9/29/2008 | | |
|
|
|
|
Plan Modification Accepted | | | 9/12/2008 | | |
|
|
|
plan modification excepted for BLD07-03031 # 100 ( Collister Shopping Center ) for the increase of parapet ht. to screen mech. equipment & provide additional space for tenant signage. on sheets A3.11 Routed to Carl W.
|
FIRE-Final Inspection | 9/9/2008 | 9/9/2008 | 9/9/2008 | P | CANC |
Troy Cobbley
|
|
|
Project is not ready fo the fire life safety inspection.
|
BLD-Foundation | 8/13/2008 | 8/14/2008 | 8/14/2008 | A | PART |
Tony Young
|
|
|
ean Phone #: ###-#### wip on retaining wall
|
BLD-Foundation | 8/13/2008 | 8/13/2008 | 8/13/2008 | P | PASS |
Tony Young
|
|
|
ian Phone #: ###-#### retaining wall next to Collister
|
Plan resubmittals received | | | 7/24/2008 | | |
|
|
|
received "3" sets of plans with each sheet a2.12, ---plans taken to Carl Westfall
|
BLD-Framing/Rough-in | 4/17/2008 | 4/17/2008 | 4/17/2008 | P | PART |
Jim Sly
|
|
|
joe Phone #: ###-#### Approx 100 ft. of Metal stud store front wall appears OK.
|
BLD-Framing/Rough-in | 4/14/2008 | 4/15/2008 | 4/15/2008 | A | PASS |
Tony Young
|
|
|
joe Phone #: ###-#### above bowling alley ok
|
BLD-Framing/Rough-in | 4/14/2008 | 4/14/2008 | 4/14/2008 | P | NR |
Tony Young
|
|
|
joe Phone #: ###-####
|
BLD-Framing/Rough-in | 4/2/2008 | 4/3/2008 | 4/3/2008 | P | PART |
Tony Young
|
|
|
joe Phone #: ###-#### lower sections by barbershop and west
|
BLD-Concrete | 4/1/2008 | 4/2/2008 | 4/2/2008 | A | PASS |
Jim Storey
|
|
|
Joe\ready now for masonary inspec. Phone #: ###-#### bolling alley and library paripet locations placed with mti pending report.
|
BLD-Concrete | 3/31/2008 | 3/31/2008 | 3/31/2008 | P | PART |
Dave Hannah
|
|
|
joe Phone #: ###-####MTI on site looking at epoxy not going to grout today
|
BLD-Framing/Rough-in | 3/27/2008 | 3/28/2008 | 3/28/2008 | A | PASS |
Tony Young
|
|
|
joe Phone #: ###-#### building 100 vacent space west of bowling alley parapet ok
|
BLD-Framing/Rough-in | 3/27/2008 | 3/27/2008 | 3/27/2008 | P | PART |
Tony Young
|
|
|
joe Phone #: ###-#### need to get more screws in steel frame wall,, will re-inspect
|
BLD-Framing/Rough-in | 3/24/2008 | 3/25/2008 | 3/25/2008 | P | PART |
Tony Young
|
|
|
Joe Phone #: ###-#### all fronts w/ wood frame ok
|
BLD-Framing/Rough-in | 3/24/2008 | 3/24/2008 | 3/24/2008 | P | PART |
Tony Young
|
|
|
joe Phone #: ###-#### library, barbershop fronts ok
|
BLD-Framing/Rough-in | 3/21/2008 | 3/21/2008 | 3/21/2008 | P | PART |
Tony Young
|
|
|
joe Phone #: ###-#### front parapet for vacent buildind east of library ok
|
(F) Reprint permit | | | 3/3/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/3/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/11/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/5/2008 | | DONE |
|
|
|
|
Telephone call | | | 2/5/2008 | | DONE |
|
|
|
t/c w andrew erstad at ###-#### - permit ready and fees given - also need gc name, rce# and ACHD receipt
|
Permit Ready to Issue | | | 2/5/2008 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 12/6/2007 | | 2/4/2008 | | PASS |
Carl Westfall
|
|
|
2/4/2008 16:36:14 CJW - activity updated through activity BLDA022 from case BLD07-03031.
|
Routing - PLAN CHECK | 1/23/2008 | | 2/4/2008 | | PASS |
Carl Westfall
|
|
|
(1-30-08) Completed the resubmittal review. Two items required resolution. Called the Architect's representative (i.e. Stephanie) and explained what was needed. Followed up with an E-mail. Waiting for resubmittals. (2-4-08) Finished the resubmittal review. Drawings approved with "red lines".
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/1/2008 | | |
|
|
|
received transmittal letter from erstad arch & "2" sheets each of a4.21, & a5.11-- plans taken to Carl Westfall
|
Plan resubmittals received | | | 1/25/2008 | | DONE |
|
|
|
received 1 transmittal sheet,and 2 copies of structural calcs taken to Carl W.
|
Plan resubmittals received | | | 1/24/2008 | | |
|
|
|
received transmittal and two copies of pages a1.21, a2.11, a4.21, a6.11; taken to Carl Westfall
|
Routing - FIRE | 1/18/2008 | | 1/23/2008 | | PASS |
Sarah Schafer
|
|
|
IFC 2003 1st review
|
1st review completed | | | 1/23/2008 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 12/13/2007 | | 1/18/2008 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on January 10, 2008 and was finished on January 17, 2008. Revised drawings were required. See the plan review report.
|
Routing - PLANNING | 12/13/2007 | | 12/13/2007 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning DRH07-00453
|
Routing - Erosion and Sediment | 12/12/2007 | | 12/13/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 12/6/2007 | | 12/12/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 12/11/2007 | | 12/11/2007 | | PASS |
|
|
|
|
Routing PW Street Lights | 12/11/2007 | | 12/11/2007 | | PASS |
|
|
|
|
Routing PW Drainage | 12/10/2007 | | 12/10/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 12/3/2007 | | 12/6/2007 | | DONE |
|
|
|
12/6/2007 10:09:42 MYS - activity updated through activity BLDA172 from case BLD07-03031.
|
Plans ACCEPTED BY PLAN TECH | | | 12/3/2007 | | |
|
|
|
received revised application with COV
|
Recd Pcfee & Taken To Pln CK | | | 12/3/2007 | | DONE |
|
|
|
|
Application received | | | 11/21/2007 | | |
|
|
|
waiting for 2nd cert of value to break this into two permits
|