BLD-Final | 11/26/2008 | 11/26/2008 | 11/26/2008 | P | PASS |
Tom Arcoraci
|
|
|
Michael Phone #: ###-####
|
DOC - Permit Finaled | 11/26/2008 | 11/26/2008 | 11/26/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 10/28/2008 | 10/29/2008 | 10/29/2008 | A | PASS |
Dave Hannah
|
|
|
Michael- centilever beam Phone #: ###-#### engineering is ok framing is passed
|
BLD-Framing/Rough-in | 10/21/2008 | 10/22/2008 | 10/22/2008 | A | PART |
Dave Hannah
|
|
|
michael Phone #: ###-####ok to cover but need engineering on centilevered beam
|
BLD-Foundation | 4/28/2008 | 4/28/2008 | 4/28/2008 | P | PART |
Dave Hannah
|
|
|
cal Phone #: ###-####
|
BLD-Foundation | 4/25/2008 | 4/28/2008 | 4/28/2008 | A | PASS |
Tony Young
|
|
|
Michael Phone #: ###-#### ftgs ok
|
CHANGE STATUS TO (ISS) | | | 4/25/2008 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 4/18/2008 | 4/18/2008 | 4/18/2008 | A | DONE |
Ben S. Pavelka
|
|
|
4/18/2008 10:07:19 BSP - activity updated through activity BLDA022 from case BLD07-03033.
|
Case Summary (BLD) | | | 4/18/2008 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/18/2008 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2008 | | |
|
|
|
|
Routing Walk-In (BLD) | 3/13/2008 | 3/13/2008 | 3/14/2008 | A | PASS |
Perry Paine
|
|
|
owner's rep came in with plans to review opertunities for the addition of a 1/2 bathroom to this structure where construction has not started yet. I sent him to public works where it was determined that the proposed placement of the structure was directly over an existing sewer line and will have to be relocated. He is going back to the owners to confir and change the plot plan to reflect the new structure placement. 3/14/2008 pep
|
Meeting | | | 3/14/2008 | | DONE |
|
|
|
owner's rep came in with plans to review opertunities for the addition of a 1/2 bathroom to this structure where construction has not started yet. I sent him to public works where it was determined that the proposed placement of the structure was directly over an existing sewer line and will have to be relocated. He is going back to the owners to confir and change the plot plan to reflect the new structure placement. 3/14/2008 pep
|
Issue PAID IN FULL permit | | | 12/4/2007 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 11/23/2007 | 11/23/2007 | 11/23/2007 | A | PASS |
|
|
|
|
Routing Walk-In (BLD) | 11/23/2007 | 11/23/2007 | 11/23/2007 | A | DONE |
|
|
|
11/23/2007 11:40:08 PEP - activity updated through activity BLDA022 from case BLD07-03033. CONTRACTOR'S REGISTRATION NOT ATTACHED
|
Case Summary (BLD) | | | 11/23/2007 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/23/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/23/2007 | | |
|
|
|
|
Application received | | | 11/23/2007 | | |
|
|
|
|