BLD-Final | 9/9/2008 | 9/9/2008 | 9/9/2008 | P | PASS |
Dave Hannah
|
|
|
Lawrence Phone #: ###-####
|
DOC - Permit Finaled | 9/9/2008 | 9/9/2008 | 9/9/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 8/27/2008 | 8/28/2008 | 8/28/2008 | A | FAIL |
Tony Young
|
|
|
lawrence Phone #: ###-#### seal underside of pop outs,, adjust front steps for rise and run
|
BLD-Grading Inspection | 8/28/2008 | 8/28/2008 | 8/28/2008 | A | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 2/27/2008 | 2/28/2008 | 2/28/2008 | A | PASS |
Tony Young
|
|
|
lawrence - insulation - as early as possible, please Phone #: ###-####
|
BLD-Framing/Rough-in | 2/25/2008 | 2/27/2008 | 2/27/2008 | A | PASS |
Tom Arcoraci
|
|
|
lawrence Phone #: ###-####
|
BLD-Footing | 1/9/2008 | 1/9/2008 | 1/9/2008 | P | PART |
Tony Young
|
|
|
lawrence - as close to noon as possible Phone #: ###-####
|
BLD-Footing | 1/8/2008 | 1/9/2008 | 1/9/2008 | A | NR |
Tony Young
|
|
|
lawrence - as close to noon as possible Phone #: ###-#### re-sched for pm
|
PubWorks Subgrade Approval | 1/7/2008 | 1/7/2008 | 1/7/2008 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Inspection Record Card- Bld | | | 12/21/2007 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/21/2007 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/19/2007 | | |
|
|
|
|
Telephone call | | | 12/19/2007 | | |
|
|
|
Called Tim Johnson about the missing detail for the rebar schedule in footing F1 and F2. He e-mailed me the rebar schedule which is now attached in the documents in tidemark.
BSP
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2007 | | DONE |
|
|
|
|
Pending Assignment by SRZ | 11/23/2007 | | 12/19/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/12/2007 | | 12/19/2007 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 12/17/2007 | | |
Ben S. Pavelka
|
|
|
|
Routing - FIRE | | | 12/12/2007 | | PASS |
|
|
|
No fire sprinklers are required (Cascara Ranch aka Grassy Hill subdivision)
|
Routing - Erosion and Sediment | 12/10/2007 | | 12/11/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 12/7/2007 | | 12/10/2007 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | | | 12/7/2007 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 12/6/2007 | | 12/6/2007 | | PASS |
|
|
|
Approved as category 3
|
Routing - Addressing | 11/23/2007 | | 11/26/2007 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 11/26/2007 | | 11/26/2007 | | FAIL |
|
|
|
Needs geotech report updated by MTI and setback from ascending slope reduced from 15 ft to 5 ft.
|
Application received | | | 11/23/2007 | | |
|
|
|
|