Third Notice BLD | 6/6/2008 | 6/6/2008 | 8/8/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Telephone call | | | 8/8/2008 | | DONE |
Cathy Brown
|
|
|
lft ms with paradigm regarding the final value for plm 2:25 pm
|
Pending Assignment by MYS | 11/26/2007 | | 8/8/2008 | | DONE |
Cathy Brown
|
|
|
|
Second Notice BLD | 4/23/2008 | 4/23/2008 | 6/6/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 3/3/2008 | 4/23/2008 | | DONE |
|
|
|
|
BLD-Final | 2/29/2008 | 3/3/2008 | 3/3/2008 | A | PASS |
Dave Hannah
|
|
|
Ken, mid morning please if possible, please call 30 minutes prior; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok for perm occ
|
FIRE-Final Inspection | 3/3/2008 | 3/3/2008 | 3/3/2008 | A | PASS |
Forrest France
|
|
|
Life safety finaled.
|
Print Occupancy Form | | | 3/3/2008 | | |
|
|
|
|
Telephone call | | | 3/3/2008 | | DONE |
|
|
|
Spoke with GC (Ken Fisher) and Boise City Building Inspector Dave Hannah. The plumbing scope of work for ADA shower on 2nd floor was omitted from the project so no plumbing signature required for perm. occupancy//3/3/08 LEG
|
Print Occupancy Form | | | 3/3/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 3/3/2008 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/28/2008 | 2/29/2008 | 2/29/2008 | A | PART |
Forrest France
|
|
|
Noted correction items from previous inspection are complete, life safety finaled.
|
BLD-Final | 2/22/2008 | 2/28/2008 | 2/28/2008 | P | NR |
Dave Hannah
|
|
|
Ken Fisher, please call 30 minutes prior; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt needs fire final walked project with contractor he will clean up seveal items hendrail on back stairs ada restroom signage sheetrock under stiars and ada gaurd under open stais in front
|
FIRE-Final Inspection | 2/22/2008 | 2/28/2008 | 2/28/2008 | A | FAIL |
Forrest France
|
|
|
Post one fire extinguisher for the second level with current certification tag per plans, provide approved hardware at two doors from an office on the 2nd level-see plan annotations, repair one EM light/exit sign at the south exit door, provide one PFE within allowable travel distances for the 1st floor area, permanent address numbers and correct verbage at the sign for the main entry/exit to be provided as discussed.
|
BLD-Framing/Rough-in | 1/15/2008 | 1/16/2008 | 1/17/2008 | A | PASS |
Dave Hannah
|
|
|
todd Phone #: ###-####
|
BLD-Conference | 1/8/2008 | 1/9/2008 | 1/9/2008 | A | PASS |
Dave Hannah
|
|
|
Tod, please call 1st; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
(F) Reprint permit | | | 12/5/2007 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/4/2007 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/4/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/30/2007 | | 11/30/2007 | | PASS |
Rita DeYoung
|
|
|
plans to be reviewed in the field
|
Inspection Record Card- Bld | | | 11/30/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/30/2007 | | DONE |
|
|
|
|
Telephone call | | | 11/30/2007 | | DONE |
|
|
|
lft vm with ben peterson ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 11/30/2007 | | DONE |
|
|
|
|
Plan assigned to (301) | 11/26/2007 | 11/26/2007 | 11/29/2007 | | PASS |
|
|
|
11/29/2007 12:20:17 301 - activity updated through activity BLDA022 from case BLD07-03041.
|
1st review completed | | | 11/29/2007 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/29/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2007 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 11/29/2007 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 11/27/2007 | | 11/28/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 11/28/2007 | | 11/28/2007 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/26/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/26/2007 | | DONE |
|
|
|
|
Application received | | | 11/26/2007 | | |
|
|
|
|