Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD07-03041
StatusFinaled
Name PARADIGM OF IDAHO LLC
Site Address 915 W JEFFERSON ST
Project NamePINNACLE COFFEE
Customer Number 
ePlanReviewNo
Description
(PINNACLE COFFEE - OFFICE) To create a office #200 on the 2nd floor by infilling the floor per engineered drawings. The U occupance is to be converted to offices space as well as a storage area. All restrooms thruout building to have grabbars and field verified for compliance.New grid ceilling lighting and hvac to be instaled at grid b-c thur 1-3 Misc. doors, glass transom lights and interior finshes. Exsting tenant space at grid b-c only has restroom work per this permit. Field verifcation of engineering notes for foottings, and lvl attachments to be supplied at time of framing insp.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD6/6/20086/6/20088/8/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Telephone call  8/8/2008 DONE
DetailsCathy Brown
lft ms with paradigm regarding the final value for plm 2:25 pm
Pending Assignment by MYS11/26/2007 8/8/2008 DONE
DetailsCathy Brown
Second Notice BLD4/23/20084/23/20086/6/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 3/3/20084/23/2008 DONE
BLD-Final2/29/20083/3/20083/3/2008APASS
DetailsDave Hannah
Ken, mid morning please if possible, please call 30 minutes prior; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok for perm occ
FIRE-Final Inspection3/3/20083/3/20083/3/2008APASS
DetailsForrest France
Life safety finaled.
Print Occupancy Form  3/3/2008  
Telephone call  3/3/2008 DONE
Spoke with GC (Ken Fisher) and Boise City Building Inspector Dave Hannah. The plumbing scope of work for ADA shower on 2nd floor was omitted from the project so no plumbing signature required for perm. occupancy//3/3/08 LEG
Print Occupancy Form  3/3/2008 DONE
Permanent Occupancy  3/3/2008 DONE
FIRE-Final Inspection2/28/20082/29/20082/29/2008APART
DetailsForrest France
Noted correction items from previous inspection are complete, life safety finaled.
BLD-Final2/22/20082/28/20082/28/2008PNR
DetailsDave Hannah
Ken Fisher, please call 30 minutes prior; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt needs fire final walked project with contractor he will clean up seveal items hendrail on back stairs ada restroom signage sheetrock under stiars and ada gaurd under open stais in front
FIRE-Final Inspection2/22/20082/28/20082/28/2008AFAIL
DetailsForrest France
Post one fire extinguisher for the second level with current certification tag per plans, provide approved hardware at two doors from an office on the 2nd level-see plan annotations, repair one EM light/exit sign at the south exit door, provide one PFE within allowable travel distances for the 1st floor area, permanent address numbers and correct verbage at the sign for the main entry/exit to be provided as discussed.
BLD-Framing/Rough-in1/15/20081/16/20081/17/2008APASS
DetailsDave Hannah
todd Phone #: ###-####
BLD-Conference1/8/20081/9/20081/9/2008APASS
DetailsDave Hannah
Tod, please call 1st; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
(F) Reprint permit  12/5/2007 DONE
Issue PAID IN FULL permit  12/4/2007 DONE
(F) Reprint permit  12/4/2007 DONE
Routing - PLAN CHECK11/30/2007 11/30/2007 PASS
DetailsRita DeYoung
plans to be reviewed in the field
Inspection Record Card- Bld  11/30/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/30/2007 DONE
Telephone call  11/30/2007 DONE
lft vm with ben peterson ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  11/30/2007 DONE
Plan assigned to (301)11/26/200711/26/200711/29/2007 PASS
11/29/2007 12:20:17 301 - activity updated through activity BLDA022 from case BLD07-03041.
1st review completed  11/29/2007 DONE
Print Pending Permit.LaserJet4  11/29/2007  
PLANS/APPL TAKEN TO FRONT DESK  11/29/2007  
Print Pending Permit.LaserJet4  11/29/2007 DONE
Routing - PUBLIC WORKS11/27/2007 11/28/2007 PASS
Routing PW Sewer Rating11/28/2007 11/28/2007 PASS
Plans ACCEPTED BY PLAN TECH  11/26/2007  
Recd Pcfee & Taken To Pln CK  11/26/2007 DONE
Application received  11/26/2007