Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/16/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 7/9/2008 | 7/9/2008 | 8/11/2008 | | DONE |
Dave Hannah
|
|
|
|
Letter of compliance | | | 7/10/2008 | | DONE |
|
|
|
|
BLD-Final | 7/8/2008 | 7/8/2008 | 7/9/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/8/2008 at 10:44:21 AM. Contact: ###-####.
|
BLD-Final | 7/9/2008 | 7/9/2008 | 7/9/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/8/2008 at 10:44:21 AM. Contact: ###-####.
|
DOC - Permit Finaled | 7/9/2008 | 7/9/2008 | 7/9/2008 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 7/8/2008 | 7/8/2008 | 7/8/2008 | P | PASS |
Forrest France
|
|
|
C/N items are finished, fire life safety finaled.
|
FIRE-Final Inspection | 4/24/2008 | 4/25/2008 | 4/25/2008 | A | FAIL |
Forrest France
|
|
|
The new lobby exit doors equipped with magnetic locks must comply with IBC 1008.1.3.4 items 1-6-specifically item #4 which has not been provided for, also need to repair the ceiling at the com. room adjacent to the east restroom for proper heat collection of the pendent sprinkler head and separation of sprinklered/non-sprinklered areas.
|
BLD-Final | 4/24/2008 | 4/25/2008 | 4/25/2008 | A | CANC |
Jim Storey
|
|
|
Rick, please call 30 minutes prior; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Framing/Rough-in | 3/18/2008 | 3/19/2008 | 3/19/2008 | A | PASS |
Dave Hannah
|
|
|
rick Phone #: ###-#### restrooms ok to cover
|
BLD-Framing/Rough-in | 3/11/2008 | 3/12/2008 | 3/12/2008 | P | PART |
Dave Hannah
|
|
|
rick Phone #: ###-#### ceilings in the front lobby entryway and ends of elev lobby ok to cover
|
BLD-Framing/Rough-in | 2/11/2008 | 2/12/2008 | 2/12/2008 | A | PART |
Dave Hannah
|
|
|
rick - Note:please call 1/2 hr prior to inspection Phone #: ###-#### ceiling grid in lobby ok to cover also framing for ceiling in elevator lobby ok to rock
|
BLD-Framing/Rough-in | 1/28/2008 | 1/29/2008 | 1/30/2008 | A | PART |
Dave Hannah
|
|
|
rick - please call 1/2 hr prior to inspection Phone #: ###-#### soffit in lobby ok to cover
|
FIRE-Conference | 1/23/2008 | 1/24/2008 | 1/24/2008 | A | DONE |
Forrest France
|
|
|
On site conference regarding project related fire alarm system modifications, specifically manual pull station locations, notification devices, and the building upgrade agreement for elevator recall initiation.
|
BLD-Conference | 1/22/2008 | 1/23/2008 | 1/23/2008 | A | PART |
Jim Sly
|
|
|
rick - please call 1/2 hr prior to inspection Phone #: ###-#### Checked existing rated walls after demo.....some OK....some ? Dave to check out later.....deferred alarm issues to Forrest.
|
Issue PAID IN FULL permit | | | 12/19/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/5/2007 | | DONE |
|
|
|
|
Telephone call | | | 12/5/2007 | | DONE |
|
|
|
t/c w martin hahle at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 12/5/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/28/2007 | | 12/4/2007 | | PASS |
|
|
|
|
Plan assigned to (425) | 11/28/2007 | | 12/4/2007 | | PASS |
|
|
|
12/4/2007 15:20:21 425 - activity updated through activity BLDA022 from case BLD07-03052.
|
Case Summary (BLD) | | | 12/4/2007 | | |
|
|
|
|
1st review completed | | | 12/4/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/4/2007 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 11/28/2007 | 11/28/2007 | 11/29/2007 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/28/2007 | | |
|
|
|
need G C License
|
Routing - PUBLIC WORKS | 11/28/2007 | | 11/28/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 11/28/2007 | | 11/28/2007 | | PASS |
|
|
|
|
Application received | | | 11/27/2007 | | |
|
|
|
|